Deficiency Rept Re Steam Generator Weld Records.During B&W QC Audit,Filler Wire Qualification Test Repts Found Incomplete for Several Heats of Weld Filler Matls.Written Rept to Be Submitted within Thirty Days
ML19329B313
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/04/1973
From: Sampson G
TOLEDO EDISON CO.
To: Kreusi F
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19329B310 List:
References
NUDOCS 8002040736
Download: ML19329B313 (1)


Text

-

O (j pp/2.

.r e

~~ - TCLEDO i

D"M L.* u.C C.G en m 9 e M N N R GotNN J. SAMPSON Vice Pressaant, Power

~

January 4, 1973

'Fe. Frank E. Kruesi.

gp Director of Regulatory Operations 0

bik U.S. Ato=ic Ener2y Cc==ission I

Washington, D.C.

205h5 rp n n

y [g g

Docket No. 50-3k6 b

lj(

Lear Mr. Kruesi:

You are hereby notified of a situation which could be considered re-portable in accordance with 10 CFR Part 50.55(e)(1)(1), " Conditions of Construction Fer=its".

This situation relates to the veld records for the Davis-Besse Nuclear Power Station stea generators.

A recent audit of veld records conducted by Babcock & Wilcox's (nuclear steam supply syste= supplier, 3 & W) C.C organization at their Barberton,

Works has shown that filler vire qualification test reports are ince:- /

9 ete for several heats of veld filler materials used in steam generatoy 1

fabrication. 3 & W is currently reviewing records to define the extent of the_inco=plete docu=entation.

We vill submit a written report on the documentation situatica within 30 days.