ML19329B313
| ML19329B313 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/04/1973 |
| From: | Sampson G TOLEDO EDISON CO. |
| To: | Kreusi F US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19329B310 | List: |
| References | |
| NUDOCS 8002040736 | |
| Download: ML19329B313 (1) | |
Text
-
O (j pp/2.
.r e
~~ - TCLEDO i
D"M L.* u.C C.G en m 9 e M N N R GotNN J. SAMPSON Vice Pressaant, Power
~
January 4, 1973
'Fe. Frank E. Kruesi.
gp Director of Regulatory Operations 0
bik U.S. Ato=ic Ener2y Cc==ission I
Washington, D.C.
205h5 rp n n
y [g g
Docket No. 50-3k6 b
lj(
Lear Mr. Kruesi:
You are hereby notified of a situation which could be considered re-portable in accordance with 10 CFR Part 50.55(e)(1)(1), " Conditions of Construction Fer=its".
This situation relates to the veld records for the Davis-Besse Nuclear Power Station stea generators.
A recent audit of veld records conducted by Babcock & Wilcox's (nuclear steam supply syste= supplier, 3 & W) C.C organization at their Barberton,
Works has shown that filler vire qualification test reports are ince:- /
9 ete for several heats of veld filler materials used in steam generatoy 1
fabrication. 3 & W is currently reviewing records to define the extent of the_inco=plete docu=entation.
We vill submit a written report on the documentation situatica within 30 days.
Yours very truly, i
?
/
i 9,i ;
+l j(ibi n.%jC" h
- i i
1 1
8 o 02 04 o7%
-..