Responds to NRC Requesting FSAR Amend Per Resolutions of NRC 761028 Meeting W/Util in Bethesda,Md Re Separation Criteria.Fsar,Revision 23,submitted 761123 & Revision 24 to Be Submitted 761106
ML19329B304
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/30/1976
From: Roe L
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML19329B305 List:
References
164, NUDOCS 8002040726
Download: ML19329B304 (2)


Text

e N..C penM 195 u.s. NUCLEf.Q KECULATC6 ' COMMIS36oN ooCKET NUMBE A 50-346

,2.m NRC DISTRIBUTION ren PART 50 DOCKET MATERIAL

' E "hhFSAR/PSAR 73:

)

FROM:

oATE or occuMENT j

Toledo Edison 11/30/76

!r. John F. Stol:

Toledo, Ohio o4TE mECEivEo Louell S. Roe 12/3/76 AErTE n OnoTonizEo anoP

$NPUr FORM NUMSEn oF COPIES nECEIVEo NonsciNAL 36;Nc LASSiriE o C>nc si;nad Ocopy oEScalPTioN ENCLOSURE Ltr. re our 11/15/76 ltr. and 10/23/76 coe tin:;....regarding scoara tion cri toria for 'rire'enys and Conduit, also concernin:;

%, q g ;.

L--'-4.

., l.,L,d*4;f,

our request for a:-dt. to FSAR.

e lh

. l l g =~ ; %

T:

(t-e>

i PLAhT NAME:

73vis-Dessa SAFETY FOR ACTION /INFORMATION ENVIRO l' /1/ M

' It e ASSIW FD AD:

I I I ARSTCNED An:

_l X

BRANCH CHIEF:

Stol (2) X BRANCH CHIEF

'.ni nton (LTR) i X PROJECT MANAGER:

En;1e X

PROJECT MANAGER:

P. Co ta X

LIC ASST:

IPilton (LTR)

LIC ASST:

INTERNAL DISTRIBUTION i

s 7RFM SYSTEvS SAFETY l

PLANT SYSTEMS SITE SAFETY &

%_NRC PDR HEINEMAN X

TEDESCO (LTR)

ENVIRO ANALYSIS l

A 1&E (2)

SCHROEDER X

3ENAROYA Y

DENTON (LTR)

I X

OEtD x

ums J

COSSICK & STAFF ENGINEERING X IPPOLITO ENVIRO TECH.

X MIPC (LTR)

MACCARRY X KIRKWOOD ERNST X CASE (LTR)

Y KNICHT BALLARD HINAUER X

SIHWELL OPERATING REACTORS SPANGLER HARLESS X

PAULICKI STELLO SITE TECH.

PROJECT MANAGEMENT REACTOR SAFETY OPERATING TECH.

X CAMMILL (2)

}

BOYD uX ROSS (LTR)

EISENNUT X

STEPP (LTR)

I i

P. COLLINS X

NOVAK SHA0 X

HULMAN (LTR) i BAER 1

_ HOUSTON f ' ROS7.TOCZY PETERSON A

CHECK BUTLER SITE ANALYFIS dlELT_@:S CRIMES X

VO.LtMER N SKOVHOLT (LTR)

AT & I XL BUNCH I

SAL _TZUAN X

DEYOUNC (LTR)

X

!. COLLINS I

futTnFPc f

X KRFCER EXTERN AL DISTRIBUTION CONTROL NUMBE R

~

LPDR: 7t. C1r,t~,ns X NAT LAR:

ANL (2) X BROOK]fAVEN NAT LAB m

TIC:

R EC_., V T F.

ULRIKSON (ORNL) y NSIC:

LA POR e-MN ASLE:

CONSULTANTS h

ACPS:

CYS SENT ACH 3 CAT "

4 e

8002046 %.

MTORY DDE Hl.ECOPY u

j Toteco

- e %,p -

W h EDISON 5

r Docket No. 50-346 n

F

(~~1 LOWELL E. ROE November 30, 1976 9

ll'yl,'g"L,,

N 4

iass-s24 C

Serial No. 164

' ~

q.

Director of Nuclear Regulation

]h C

I Attn:

Mr. John F. Stolz, Chief

-1 ly' k

Light Water Reactors Branch No. 1 s,.

Division of Project Management United States Nuclear Regulatory Commission (g/)

N Washington, D. C. 20555

/

Dear Mr. Stolz:

Your letter of November 16, 1976, transmitted the NRC summary Enclosure of our meeting in Bethesda on October 28, 1976, regarding Davis-Besse Nuclear Power Station Unit I separation criteria for wireways and conduit. You also reques:ed that we amend the FSAR to conform with resolutions scated in the summary, and respond by November 30.

The following lists the disposition of the like numbered items in your summary:

1.

To be addressed by revised Figures 8-20A, B,C, and D in FSAR Rev. 24.

2.

Addressed on page 8-22, section 8.3.1.2.21 of FSAR Rev. 23 3.

To be addressed by revised Figure 8-20D in FSAR Rev. 24.

Please note that in item 3a, our comitment was to "42 inches" rather than the listed "46 inches".

Also, in item 3b, our commitment was to provide the fire barrier

"...over the open tray" rather than "...between the redundant wireways".

as the summary indicates.

4.

Please note that at our meeting we comitted to "...approximately Ic inch beyond..." rather than the listed "... approximately is inch beyond...".

Revised Figure 8-21C of FSAR Rev. 23 addresses our commitment.

5.

Cable routing in metal conduit was addressed in detail in my letter to you on November 23, 1976; our commitment will also be made in FSAR Rev.24 6.

To be addressed by revised Figure 8-20A and section 8.3.1.2.20 in FSAR Rev. 24 l

l Revisicu 23 to the FSAR was submitted on November 23, 1976; Revision 24 is scheduled for submittal the week of December 6.