ML19329B175

From kanterella
Jump to navigation Jump to search
Responds to Question Contained in Revison 4 of FSAR Re Infrared Flame Detectors Used in Emergency Diesel Generator & Diesel Fire Pump Rooms.Fsar Not Changed to Agree W/Final Design & Installation.Forwards Revised Fsar.W/O Encl
ML19329B175
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/07/1977
From: Roe L
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
257, NUDOCS 8001300774
Download: ML19329B175 (2)


Text

s.NuCLEAa nEcv av CouuissioN oo N

Nnc o.. e 195

, f c s <..1.:. cf NRC DISTRIBUTION ron PART 50M)OCK5T MATERIALf,qg,.,77 e.

TO:

FROM:

oATE OF CoCUuENT Toledo Edison Company 4/7/77 Mr. John F. Stolz Toledo, Ohio DATE nECEIVEo e

Lowell E. Roe 4/15/77 M ETTER ONoTonizEo ence escuTronu suusen or Cor:Es nECs.:vEo-I BoRIGIN A t.

SUNC LASSlFIE o QCorv

}

bb W Y l

DCSCRieTioN ENCLOSURE Ltr. trans the following:'

Consists. of revised FSAR pages 9.5.4-1 Concerning fire protection systems....

Q

\\

PLANT NAME: Davis-Besse (1.P)

(3-P)

DISTRIBlTrION OF FIRE PRDIECTION INFO ON ALL CASES ASSIGNED TO VASSALL M i M I 10-5-7EDGla 5

O l

RJL l

M ci:iY FOR ACTION /INFORMATION I T>RANCli CilIE";

I Jfe /L M EpJfQT MANAGER E4 4 l4.,

LIC. ASST:

14e A

~ d EG FTY"3 INTERN AL DISTRIBUTION m

I l

'NRC PDR l

(

OELD l

I & E (3)

BOYD (LTR)

DE YOlC (LTRT CROCKER (LTR)

VASSE.I.0 (LTR) ll m Sli1 T1?

l*

J. MIT.LER (LTR) llEINE}!AN TEDESCO BF.NA ROYA IPPO,LITO SKOV110LT (LTR) llE1.TE!!ES

!!OUSTON LXTERN AL ut:;Tl!!UUTION CON T ROL NUMilEf t

,I.I'Di(; W Q ae4ee D k I

I :

. Acie;.)_ci:_ir. : T/ :::rrr_u j A CST R y

....a,,,,,un7i,.;c "

8 0 0130 0 Ql?$ g

- c -

pp k h d rouoo oiT;.q

'e

%sm EDISON e

..r - sy n

1T'E' v ca *='cm'.or.oi LOWELL E. RCE a w##-

m, Docket No. 50-346 bmM p,,o 2

aaa

.,M sef l

14191 259-5242

,',/

Serial No. 257 (A 9A cp O

April 7, 1977 Director of Nuclear Reactor Regulation Attention:

Mr. John F. Stolz, Chief

((

I Light Water Reactors Branch No.m m

< qh d bbb.

j 8

Division of Project Management United States Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Stolz:

OI&E Region III in their inspection report 77-06 reported a Deviation from the FSAR concerning fire detection installations in the Davis-Besse Nuclear Power Station Unit No. 1 emergency diesel generator and diesel fire pump l

rooms.

In response to questien 9,5.4 contained in Revision 4 of the FSAR, i

we stated that infrared flame detectors would be used in these rooms while l

the actual installed detection system utilizes photoelectric smoke detectors.

In the final design of detection systems, it was evaluated that smoke from potential oil fires could mask detection by infrared devices and a more sensitive detection system for these areas would be obtained through the use of photoelectric smoke detection devices. The final design and installation proceeded on this basis, but the FSAR was inadvertently not changed accord-ingly.

To document the above, enclosed with this letter are revised FSAR pages 9.5.4-1, 9.5.4-2 and 8.3.1-6, which will be submitted in the next revision to the FSAR.

Yours very truly, LER.s Enclosure cc:

Fr. James G. Keppler Regional Director, Region III l

l THE TOLECO ECISCN CCMPANY ECISON PLAZA 300 MACISCN AVENUE TCLECO, OHIO 43652

-