Responds to AEC Re Valve Body Min Wall Thickness Verification Records.Valves Over 1 Inch Nominal Pipe Size Will Not Be Installed in Reactor Coolant Pressure Boundary at Facility.Purchase Specs Being Revised
ML19329B160
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/28/1972
From: Sampson G
TOLEDO EDISON CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19329B158 List:
References
NUDOCS 8001300731
Download: ML19329B160 (1)


Text

a 6

TOLEDO i

umasom GdNN J. SapsoN vice pree.oent, po e July 28,1972 Docket No. 50-346*

Mr. Boyce Grier Regional Director U. S. Atomic Energy Commission Directorate of Regulatory Operations Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Grier:

In reply to yohr letter of June 29, 1972, concerning verification records of valve body minimum wall thickness, there are no valves currently at the site over 1-inch nominal pipe si::e that will be installed within the reactor coolant pressure boundary of the Davis-Besse Station.

Review of the valve manufacturers' procedures who are supplying valves under our purchase orders and those of Babcock & Wilcox for use within the reactor coolant pressure boundary shows that all manufacturers involved have established procedures for direct physical measurement of actual vall thickness.

Our purchase specifications are being revised to include a requirement for documentation that valves in the above category, being delivered to the site, meet the minimum wall thickness requirements of the specified codes and standanis.

The Babcock & Wilcox inspection procedures are also being revised to include verification that valves in this category meet the minimum wall thickness requirements prior to shipment.

Yours very truly, g !,.

/