DEC I 51972 Docket No. 50-346 J. Hendrie. Deputy Director for Techn4 cal Review, Directorate of Licensing A. Braitaan, Chief, Office of Antitrust & Indemnity TOLEDO EDISON CQiPANT - BAYIS-BISSE NUCLEAR POWER STATION i
Toledo Edison Company submitted its application for an operating license for the Davis-Besse Nuclear Power Station on December 12, 1372. In accordance with the " Guide for the Pralfminary Review of Facility License Applications", a schad=1e for conducting the preliminary
)
review is provided as Attach==nt 1.
This schedule is extremly j
important in the review because of the requirement by AEC Rules to complete the entire review in 30 days. A coordination meeting ofr all review participants will be held on December 20, 1972, as i
noted in Attachment 2.
i The FSAR for this application was prepared in accordance with thd should be judged for completness on the basis of the " Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants" dated l
7ebruary 23, 1972.
For all review participants we request 1) that you attend the coordination meeting on December 20, 1972 and 2) that comments be provided to the Project Manager (H. Faulkner) no later than January 3,1973.
j i
I
- 1. C. DeToung, Assistant Director for Pressurized Water Reactors l
Directorate of Licensing l
ec: RP Asstant Directors GKaighton DISTRIBUTION Easto a DLange g e)tet H. File c
l LShao RP Reading E5Klecker TMoore PWR-4 Reading ISeeen Ygtelle ASchwencer Maeeney JEastner HJFaulkner l
DKanth GLong RCDeYoung Eredence G7afname M 1T=r VBenarofa PWR Branch Chiefs Mc===411 E7=11==r WBauston sErr3mes
- =Mh
'g j' omcz>._..EWR. 4..
A L:AD/BWR----
i N
mi_.
=
m, om > -.121Id/72-----
--13/ b/29
- ta /Jm---
.a. p m a a im--..n
% uc_,...m oca 6m 80 01300 $90
4 SCHEDULE FOR PRELIMINARY REVIEWS Davis Besse - UL EVENT DATE 1.
Preliminary work by L-FM and E-FM Complete 2.
Applicant tenders application for 12-13-72 preliminary review (Receipt Day).
3.
License Application, SAR, Environ-12-13-72 mental Report, and Antitrust Material are distributed.
4.
L-FM prepares and sends internal AEC 12-14-72 me=orandums with special instruc-
'tions, for the preliminary review.
5.
L-FM prepares, obtains signature 12-14-72 of Deputy Director for Reactor Projects, and sends letter to appli-cant acknowledging receipt of tendered applicant and notifying come.ence-ment of preliminary review.
6.
L-PM prepares detailed schedule for 12-15-72 preliminary review, including meetings with Technical Review Staff and others as appropriate.
7.
Technical Reivew, Environmental Projects 12-18-72 and Office of Antitrust and Indemnity (OAI) start preliminary review.
8.
Co-ordination meeting for all preliminary 12-20-72 review participants.
9.
All' participants in preliminary 1-3-73 review subnic evaluation reports to L-FM.
- 10. L-FM completes final report and letter to 1-12-73 spplicant for management approval.
- 11. Deputy Director for Reactor Projects 1-17-73 approves recommendations and signs letter to applicant.
7
D a
9 Continued Page EVENT DATE 12.
L-FM prepares DR Information Report 1-17-73 to Commissioners, if appropriate.
13.
L-PM and Regulatory Staff 1-18-73 reviewers meet with applicant.
14 L-FM prepares a preliminary safety 2-14-73 evaluation report (about 4-6 pages) identifying potential safety con-cerns and the major review areas.
- 15. L-PM prepares tentative safety review 2-14-73 schedule and E-FM prepares tentative environ = ental review schedule (Levels C & D) based on applicant esti= ate for
- , docketing application (with additional
. information if application is rejected) e 6