ML19329B003
| ML19329B003 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/28/1974 |
| From: | Roe L TOLEDO EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML19329B001 | List: |
| References | |
| NUDOCS 8001290626 | |
| Download: ML19329B003 (2) | |
Text
.
C TOLEDO fN;.e
% emmm v
tCWELL E.' Rot Docket 50-346 77[$$C7" e
August 28, 1974 Mr. James G. Keppler Regional Director, Region III Directorate of Regulatory Operations United States Atomic Energy Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
On August 22, 1974, we received inquiries from several local area news media concerning the results of a site inspection at the Davis-Besse Nuclear Fawer Station on July 17 and 18, 1974, conducted bySour repre-sentatives. At the start of this site inspection, your representatives informed us that the principal purpose of the inspection was to review g
7 U
construction activities associated with.the painting of the containment vessel interior and to investigate allegations you had received concerning these activities.
These news media inquiries also requested our comments on reported citations by the Atomic Energy Commission concerning alleged violations of the quality assurance requirements covering the activities associated with this painting of the containment vessel interior.
Since we had not received-your report of this inspection, we declined com=ent on the infor-mation that the news media stated was contained in the report.
On Monday, August 26, 1974, we did receive your letter of August 21, 1974, which contained your findings of this site inspection.
Due to the interest expressed by the news media in this matter and in keeping with our long-established Company policy of frank and open communication with the news media, we have made your August 21, 1974, letter and inspection report available to any interested party.
Your letter contains the Atomic Energy Commission's " Rules of Practice"
~
statement that if.there is propriety information that the Applicant wishes to withhold from public disclosure that you be so informed within 20 days, after which the complete inspection report is placed in the public file.
80012$0 M L/
THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISDN AVENUE TOLEDO, OHIO 43652 AUC 3 'o '1974
~
.~.
..~.
l<
-Mr 'Jame's G. Keppler Page 2
-August 28, 1974 i
E'
'This is to inform you that we. consider that there is no proprietary l
information in your August 21, 1974 letter and attached inspection-report so that you may feel free to place it in the public file at any I
time.
Our review of your letter and inspection findings is continuing and our reply will be forthcoming within the required 30 days from receipt.
Yours very truly, r'
i Lowell E. Roe Vice President, Power l!
LER.r l
-l f
4 4
r 4
i 4
8 i
b t :
1-5 l-1
~~
.,_._.-_._--._.___:._u.
,