Responds to NRC & Provides Scheduling Info Re LOCA Analysis & ECCS Design,Qa for Operation,Industrial Security Plan & Radioactive Matl Safety
ML19329A893
Person / Time
Site: Davis Besse 
Issue date: 08/19/1974
From: Roe L
TOLEDO EDISON CO.
To: Schwencer A
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001150788
Download: ML19329A893 (2)


Text

'

AEC DTSTRIBUTION FOR TART 50 DOCKET MA N IAL (TDiPORARY FORM)

CONTROL UO:

8709

~

FILE:

PROM:

DATE OF DOC DATE REC'D LTR TWX RPT OTHER Toledo Edison Toledo, OH Lowell E. Roe 8-19-74 3-23-74 X

TO:

ORIG CC OTHER SENT AEC PDR yyy A. Schwencer 1 signed CLASS UNCLASS PROP INFO IUPUT NO CYS REC'D DOCKET NO:

XXX 1

90-MA DESCRIPTION:

ENCLOSURES:

DO NOT REMOVE Ltr re our 8-6-74 ltr furn scheduling info....

]

Distribution as per E. Gculbourne ACKNOWLEDGED PLANT NAME: DAVIS BESSE FOR ACTION /INFORMATION 9-26 74 nw'

=

BUTLER (L)

/SCECENCER(L)

ZIEMANN(L)

REGAN(E)

W/ Copies W/1 Copies W/ Copies W/ Copies CLARK (L)

STOLZ(L)

DICKER (E)

LEAR (L)

W/ Copies W/ Copies W/ Copies W/ Copies PARR(L)

VASSALLO(L)

KNIGHION(E)

V/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L)

PURFLE (L)

YOUNGBLOOD(E)

W/ Copies W/ Copies W/ Copies W/ Copies INTERNAL DISTRIEUTION

-m VTLE' TECH REVIEW CiTON LIC ASST A/T IND i

,/AEC PDR RIMES BRAITMAN OGC, ROOM P-506A SCHROEDER

,/;APMILL DIGGS (L)

SALTZMAN TZING/ STAFF CCARY dASTNER EARIN (L)

B. HURT CASE IGHT EALLARD GOULBCURNE (L) ptgg3

/GIAMBUSSO

,/hAWLICKI SPANGLER KREUTZER (E)

,/ MCDONALD BOYD HA0 LEE (L)

CHAPMAN v4100RE (L)(E;R)

TELLO ENVIRO MAIGRET (L) 1 EYOUNG(L)(PWR)

USTON MULLER REED (E)

/SKOVHOLT (L)

E OUP OVAK ICKER SERVICE (L) f'OLLER(L)

OSS IGHTON SHEPPARD (L)

D. THOMPSON (2)

P. COLLINS

.4PPOLITO YOUNGBLOOD SIATER (E)

KLECKER l

DCIISE

,dEDESCO REGAN SMITH (L)

EISENHUT G OPR DONG JROJECT LDR TEETS (L)

PILE & RECION (2),/t.AINAS

,# THOMPSON WILLIAMS (E)

(OR'CS ENAROYA HARLESS WILSCN (L)

~

STEELE OLIl'ER

.Q, EXTEPJAL DISTRI3UTION

- LOCAL E;R ? ORT CLINTON. OH

- TIC (A3 C.ATHT)

(2) M -:!ATIC'.'AL L.233 LNr 1-PDR.iA'.'LA.

2

- NSIC (SUCF CA' )

1-ASLIP(E/W Iid,, ?c. 529)

,/1-LRCC..:Ei... :.JJ -

,si - Asta 1 '4. PE:::iI::GTC::, b E-201 GT 1-G. U LRIES,.,

'?'

1 - Newton Anderson 1-BS:t SLlI:: ESC. CAD, b E-201 GT 1-ASP. D (RUT 7 : JIi

/16 - ACRS,ggggyp 1-CC::SULTr !$

F.-. B-121 C-Nr D.RK/;LU:2/ACSABIAN 1-RD.. MU E L LI '., -

GT l

8001150 7 g

~,-

TULEDo EDISON REGULATORY DOCKET FILE COPY v.a u... %.,

14191 259-5242 CA \\ fD

~

j\\

N '7 Docket No. 50-346 g

T.tht; August 19, 1974 N

7 J C-r

.. -Q n, y ' (A-fy 3

gf.e#

kg,3 0'

(;

hir. A. Schwencer, Chief

- f Lightwater Reactors Branch 2-3

\\(.". '

S

Directorate of Licensing Office of Regulation United States Atomic Energy Commissions Washington D.C. 205d5

Dear Air. Schwencer:

The following scheduling information is provided in response to the matters listed in your letter of August 6,1974.

1.

LOCA Analysis and ECCS Desien THE compie' tion ot"the LOCA analysis and ECCS design by the NSSS vendor incorporating the new ECCS rule (10CFR Part 50, Appendix K)is on schedule and is expected to be completed and reviewed by Toledo Edison in December of 1974, at which time the information will be submitted to the AEC.

2.

Quality Assurance for Operation The revised section 17.2 of the FSAR is being submitted on August 15,1974 as Revision 8 to the FSAR.

3.

Industrial Security Plan The Industnal Secunty Plan is presently being developed. Revision 9 to the FSAR will include a change in the response to the AEC Question #13.7 as follows:

" Preparation of an Industrial Security Plan was initiated in January of 1974. TECo has specified the date for completion of the plan as January of 1975, which is better than 3 months prior to scheduled fuel receipt on station. The date is included in the AEC Regulatory Operation Status Summarv Report, the " Yellow Book" The plan will be submitted, however, as soon as it has been completed, which may be prior to January of 1975."

4.

Radioactin 5faterial Safety The mf0:7 nation requested by Regulatory Guide 1.70.3 is presently being prepared and is expected to be ready for submittal in Revision 9 of the FSAR, which is tentatively scheduled for submittal on September 30, 1974.

Additional information v0ich may be required in response to the first round requests will also be included in Revision 9 to the FSAR.

Yours very truly,, _ g b

d nh b/6 THE TCLFDO ECISCN COMPAfwY EDISCN PLAZA 3CC MACISCN AVENUE TOLEDO. CHIO 43652