ML19329A862
| ML19329A862 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 12/30/1976 |
| From: | Roe L TOLEDO EDISON CO. |
| To: | Rusche B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19329A863 | List: |
| References | |
| NUDOCS 8001150757 | |
| Download: ML19329A862 (2) | |
Text
DMR 2k frRu 177 + M U&d7'W W M"-r2^2 NRC rOng 195
//
,, /
u.C. NvCLE AR FJEGULATOQY 40** *lSSION COCKET NUM T.E a p g; -] f/ f f 2pfj 7pf_
50-346 y
c:.?en..
NRC DISTRIBUTION FOR PART 50 DCCKET MATERI AL
'$[D "b"FSAR/PSAR TO:
B.C. RUSCHE FROM: TOLEDO EDISON oATE OF oOCUMENT TOLEDO, OHIO 12/20,/76 L.E. RCE oats nacgivso 12/30/76 OLETTER O NOTORIZ E D PROP APUT FORM NUMBER OF COPIES RECEIVED
@ ORIGIN AL O UNCLASSIFI'E C OCOPy 60 CESCRIPTION ENCLOSU R E LTR. TRANS THE FOLLOWING.......
AMENDMENT # 42 TO THE APPLICATION FOR LICENSES CONSISTING OF REVISION # 25 TO THE FSAR, MINOR CHA';GES AND REVISIONS RESULTING FROM RECENT DONOT REMOVE
"" " ' **' " ' * ' ' " " ^ " ' * * ^ * " " ' " ' '
- DETAILED EI&C DRAWINGS......
( 1 SIGNED ORIGINAL CY. RECEIVED)
PLANT NAME: DAVIS BESSE SAFETY FOR ACTION /INFORNIATIGN ENVIRO
- it
I
! ACSICNED AD:
I I I ASSIGNED AD:
/ BRANCH CHIEF:
I STOLZ (2) /l BPJ.NCH CH!EF KNICHTON (LTR)
I/I PROJECT MANAGER:
1 ENGLE
/} PROJECT MANAGER: COTA l
if LIC ASST:
HYLION (LTR) i LIC ASST.
I INTERN AL DISTRIBUTICN i
A c r r r)
SYSTEMS SAFETY I PLANT SYSTE"5 SITE SAFETY &
NRC PDR HEINEMAN
/ TED_E_SCO (LTR)
ENVIRO ANALYSIS
/
I&E (2)
SCHROEDER Vi BENAR0YA
/
DENTON (LTR) i
/
OEI D I/ U TMAS COSSICK & STAFF ENGINEERING M IDDOLITO ENVIRO TECH.
/
MIPC (LTR)
MACCARRY if KIRKWCOD t
ERNST 5
I/ CASE (LTR)
I [/1lIFWELL I OPEPATING REACT 0?S I SPANGLER KNICHT I
I BALLARD FANAUER HARLESS
'A 1 %'LICEI STELLO i
l
! SITE TECH.
1 I PROJECT MANAGEMENT I
REACT 0F SAFETY OPERATING TECH.
/l CA_MJILL (2)
_ l BOYD fl ROSS (LTR)
EISENHUT
/l STEPP (LTR)
I/
P. COLLINS
,/l NOVAK SHA0
/
HULMAN (LTR)
[
HOUSTON If ROSZTOCZY BAER t
PEiF[RSON IN CHECK 3Lii.ER SITE ANALYSIS 2
[
HELTEMES I
CRIMES
/
VOLLMER
/
SKOVHOLT (LTR)
AL& I
/t BUNCH SALIZ2'AN
/
DEYOUNC (LTR)
/i J. COLLIMS qnTn.rnC fl KRFCER i
EXTERN AL DISTAL 0UTION CONTROL NUMBER i
LPOR: PORT CLINTON. f.N/T LAB: ANL (2Q BROOKHAVEN NAT LAB:
TIC:
/
jiSIC:
LA PDR O A T r'n qrh u g n n n,,,i 13137 q
Asta:
C6TiSutrAvrS VM I EU Ja I-M UUtJUiV tl\\
t 7 ACHS: 16CYS SENT Acid JAT " A CAn Ah9n 3ri n rsi.
L. ' ~
l VI\\ NVM TI V li VV l
u ccon..,.n o ini soo i iso 7E7
Teeuroory hcyg
~
.w
,,, / '
s TCLEDO 3
EDISDN 7
2-DEC 3 0197.6 7g Docket No. 50-346 h
LOWELL E. RCE m,..
V+Cf @*f 5+0ept y
" amoment F 3c-December 30, 1976
.f 6
y2 ::
4 s\\
O
'h'fl' y, m
-.a Serial No. 176
\\
uhECf
'}
Mr. Benard C. Rusche, Director
' < c.
^
O
' '.tr J-
[$y Office of Nuclear Reactor Regulation
,(
United States Nuclear Regulatory Commission
'4ashington, D.C.
20555 g
Dear Mr. Rusche:
Under separate cover, we are transmitting Amendment No. 42 to the Appli-cation for Licenses for the Davis-Besse Nuclear Power Station Unit No. 1.
This Amendment consists of Revision No. 25 to the Final Safety Analysis Report (FSAR). Three (3) original and twenty-five (25) con-formed copies of the transmittal sheet are included together with sixty (60) copies of Revision 25 to the FSAR.
This revision consists primarily of minor changes and revisions re-sulting from recent discussions between the Applicant and the NRC staff in preparation for ACRS meetings. This revision also identifies the Reactor Protection System reactor coolant pressure instrumentation change which will be made to eliminate that instrumentation's setpoint drift problem.
Also included as part of this Amendment is the submittal of three (3) copies of new and revised detailed EISC drawings.
Yours very truly, b']
v bj e/6 cc: w/1 James G. Keppler Regional Director, Region III Directorate of Regulatory Operations U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 b_U.d '/
THE TCLEDG ECISCN CCMPANY ECISCN PLAZA 300 MACISCN AVENUE TCLECO. CHIO 43552