ML19329A836
| ML19329A836 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/01/1976 |
| From: | Roe L TOLEDO EDISON CO. |
| To: | Rusche B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19329A837 | List: |
| References | |
| NUDOCS 8001150730 | |
| Download: ML19329A836 (2) | |
Text
,
U.C. NUCLEAR REEULATonV Cor klioN DOCKEY NUM"E R NRjecuu.195 30-3 %
a.m
'. NRC DISTRIBUTION roR PkRT 50 DOCKET MATERI AL 7ROR
^
'To:
Mr Rusche Toledo Edison C 3-1-76 Toledn, Ohio DATE RFCEIVED 3,,
.CLETTER ONOToRIZED PPOP tNPUT $0RM NUMBER OF CCPIES RLc8!!VED CORIGINAL E UNC LASSIFIE D OcoPY 3 signed DESCRIPTION ENCLoSUPE Ltr notart ec 3-1-76... trar.5 the following:
Andt 133 to the License Application: Consists of tne felicwing:
1.
Revision #17 to the FSAR: Consists of changes to che text reflecting modifications with regara to diesel oil stcrage & transfer system, the fuel handling area ventilation system & the service water system.........
(70 cys encl rec'd)
.a g,d s g k k c/
2.
Enlarged EI&C drawings.......(3 tys rec'c) 4 Tn L
- h' Q "4. y
,4 chhG PLANT NAME:
Davis 2 esse :.*1 Sa * - To P oF s
( GOR. -DRAWi'00 S SAFETY FOR ACTION /INFORMATION ENVIRO J-o-ic ear i ACSIGNED AD :
l Og, %uo e, (up)
ASSIGNED AD :
~~
'BkANCli CHIEF :
6a +[ef BRANCH CliIEF :
PROJECT MANAGER:
fy l g,,
PROJECT !% NAGER :
LIC. ASST. :
t'y { j,, u /( (up}
LIC. ASST. :
a t
i INTERNAL DISTRIOUTION l
,4
-FILE -J SYSTEMS SAFETY i PLANT svgTeMs i I rwTen Ter u 4 ERNST l
V NRC PDR IFITNEMAN
/l Tvnnscn /h l/ fI&E (t.)
scunnRnen
/1 BENAROY.1 BALLARD i
OEI.D W
/I. LAINAS SPMTCf.ER
/
f PPOLITO I
GOSSICK & STAFF ENGINEERING
/
SITE TECH
/
MIPC (M paccAny Z
. CASE i+ d l/
KNIGHT OPERATING REACTORS
/
GAMMILL(a) i RANAUEP '
1/
SIINEIL
- 1 STELLO tw STEIP j
l 1%RLESS V
PAWLICKI
. HLULAN OPERATING TECH I
i PROJECT MANAGEMENT l R5 ACTOR SAFETY EIE2NHirr SITE ANALYSIS BOYD
/
R(SS &+$-
SPA 0
/
VOLLMER Ch-
/
BUNCH I
/
P. COLLINS
/
NOVAK BAER _
/
HOUSTON
/
ROSZTOCZY SCIGENCER J. COLLINS PETERSON
/
C11ECK GRIMES
/
KEEGER 1
MELfZ
/
HELTEMES AT & I SITF. SAFETY & ENVI.EC
/1 SKOVHOLT 4.t>
SALTZ' FAN l ANAL? 3IS l
RUT 3EP.G I l DENTON & MPI.! ER EXTERNAL DISTR:BUTION CONTROL NUS.1BER
/
LPDR: Norf Ch440e CN / NATL I \\B AN L, C2.) /
BROCKHAVEN NATL LAS p i
/'
, LA PDR CONSULTANTS K ghi==F l 8 0 01150 7,'$d ur.c r oiiu iss d-70'
^
N.
TOLEDO 19 k pp.
%mm EDISON 3
LOWELL E. ROE Sfarch 1,1976 C
v.
g y
v.e. ama.ne Docket 50-346
,/
[l'l",, ']l,"**"'
N. rzny hir. Benard C. Rusche, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C.
20555 o/
n
Dear Sir. Rusche:
Under <eparate cover, we are transmitting Amendment No. 33 to the Application for Licenses for the Davis-Besse Nuclear Power Station Unit 1. This Amendment consists of Revision No.17 to the Final Safety Analy:is Report (FSAR). Three (3) original and twenty-five (25) conformed copies of the transmittal sheet are included together with seventy (70) copies of Revision 17 to the FSAR.
This revision includes changes to the FSAR text retlecting the design modifications to the Diesel Oil Storage and Transfer System. the Fuel Handling Area Ventilation System and the Service Water System as discussed with the NRC review staff on January 23 and 29,1976.
Also included as part of this Amendment is the submittal of three (3) copies of revised detailed EI1C drawings.
Yours very truly, wt ab/7 cc: w/l James G. Keppler Regional Director, Region Ill
.m.
Directorate of Regulatory Operations
_ _.: 7. ' -
U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
- l Ii h
'y t
)
^
THE TCLECO ECISCN CCMPANY EDISCN PLAZA 300 MACISCN AVENUE TCLEDO, CHIO 43652 2003