ML19329A767

From kanterella
Jump to navigation Jump to search
Forwards Amend 1 to OL Application,Consisting of Changes, Corrections & Additions to PSAR
ML19329A767
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/17/1969
From: Sampson G
TOLEDO EDISON CO.
To: Price H
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19329A768 List:
References
NUDOCS 8001150676
Download: ML19329A767 (1)


Text

h' REC 05AEC REG 12-17-69 50.46 3891 7

.~ fj[B i

]

Regulatory Fi!e Cy.

lo) 53 (o) % coswmu mz m uno

-T I-*
  • M [*

420 MADEMON AVENUE *MLEDO, OHIO 43601.(419)242-8731

[ lW7' GLENN J. SAMPSoN vacs FrumosozNr-Pown December 17, 1969 Mr. Harold L. Price Director of Regulation U. S. Atomic Energy Commission Washington, D. C.

20545

Dear Mr. Price:

The Toledo Edison Company has today filed Amendment No. 1 to the application to construct and operate the Davis-Besse Nuclear Power Station. This amendment covers changes, corrections, and additions to the PSAR.

Three signed originals and 32 conformed copies of the amend-ment page along with 80 copies of the PSAR changes are being trans-mitted to AEC under separate cover.

Yours very truly,

/ /

/

f,,

)4
m

{jike / Gem s

//

1 b

GJS/pr 4.

.k N

C0CKETED

@/

3 i

DEC171969 ?

6\\

ncutATCRY f.s

~'

1. SECTCN/

"ET CLERK

  1. .. \\.

so(74

,o 11 o