ML19327C134

From kanterella
Jump to navigation Jump to search
Forwards LER-89-015-01,correcting Format Descrepancies, Editorial Errors,Changing Postulated Scenario in Analysis Section & Changing Description of Effect of Corrosion Product Buildup on Valve Operability
Date released: 12/07/2019 Download: ML19327C134


LER 89-015-01:on 890918,two Remote Manually Operated Diaphragm Air Operated Isolation Valves Failed Closing Time Acceptance Criteria.Caused by Buildup of Iron Oxide Sludge. Valves Disassembled & Cleaned
ML19327C135
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/07/1989
From: Fish H
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
References
Download: ML19327C135 (7)
Forwards LER-89-015-01,correcting Format Descrepancies, Editorial Errors,Changing Postulated Scenario in Analysis Section & Changing Description of Effect of Corrosion Product Buildup on Valve Operability
ML19327C133
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/07/1989
From: Fernandez W
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML19327C133 (1)