Responds to NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. Util Remaining Actions Awaiting NRC Approval of BAW-2085 & to Update Surge Line Stress & Fatigue Analyses
ML19327C092
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/06/1989
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
1729, IEB-88-011, IEB-88-11, TAC-72128, NUDOCS 8911150260
Download: ML19327C092 (3)


Text

-

L

,,g y.

H TOLEDO

%me EDISON r

f' A Cememr Energy Cm

.DONAU3CL,u wSHELTON ve. % _

Docket Number 50-346 M * ** '

  • License Number NPF-3 Serial Number 1729' November 6, 1989 United States Nuclear Regulatory Commission Document control Desk Vashington, D. C. 20555 Subj ect: Toledo Edison's Response to Bulletin Number 88-11:

Pressurizer Surge

-Line Thermal Stratification (TAC Number 72128)

Gentlemen Toledo Edison's (TE) June 2, 1989, submittal (Serial Number 1671), transmitted

-the response to paragraph '1.b of the subject bulletin. The response to paragraph 1.b included Babcock and Vilcox Owner's Group (B&VOG). Report

~BAV-2085.

As preliminary analyses indicated that the surge lines may not meet the applicable design codes for the licensed life of the plant, TE also L

submitted (Serial Number 1671) a Justification for Continued Operation (JCO)

L through January 2, 1991. TE's initial response, dated March 3, 1989 (Serial Number 1633) provided the results of a visual inspection of the pressurizer surge line as requested in paragraph 1.a of the subject Bulletin. TE stated in the March 3, 1989 submittal (Serial Number 1633) that we were addressing the Bulletin's remaining requested actions, both independently and in conjunction with the B&V0G. B&V0G's letter to Mr. Terence L. Chan of the NRC, dated September 29, 1989 provided responses to NRC questions developed during the review of B&V0G Report BAV-2085.

This letter provided responses to all of NRC's questions except question 9 on section 5 of BAV-2085, which B&V0G requested an extension until November 30, 1989, in order to complete the response. The purpose of this letter is to confirm that the B&V0G responses to question 1 through 8 are applicable to Davis-Besse.

Question 9 does not apply to Davis-Besse, as the Davis-Besse analysis showed all stress values within the-limits of the 3 Sm criteria.

Toledo Edison's remaining actions for the subject Bulletin are to avait NRC's approval of BAV-2085 and to update the surge line stress and fatigue analyses to ensure compliance with applicable codes or submit a future JC0 and a description of proposed corrective actions to effect a long term resolution by January 2, 1991.

8911150260 891106 gA PDR ADOCK 05000346 7

o FDC

/

i0 THE TOLEDO EDISON COMPANY EDl SON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652

Dock;t Number 50-346 J v '.

Lic:nse Nu ber NPF-3 Serial Number 1729

[

Page 2=

n ','

LIf you'have any questions concerning this matter, please contact F'

[. ;',

Mr. R. V.-Schrauder, Nuclear Licensing Manager, at (419) 249-2366.

t

.Very.truly yours, F

RTH/ssg l-cc: P. M. Byron, DB-1 NRC Senior Resident Inspector V;,

A. B. Davis, Regional' Administrator, NRC Region III T. V. Wambach, DB-1 NRC Senior Project Manager i.

[.

~

\\

L 1.

1 1o l

s 1

1 I

1

y L<

i l

b~

Docket Number 50-346 f

License Number NPF-3 f

' Serial Number 1729 Q

p

[>.

L h.

L' RESPONSE TO NRC BULLETIN 88-11 PRESSURIZER SURGE LINE THERMAL STRATIFICATION FOR-DAVIS-BESSE NUCLEAR POWER STATION UNIT NUMBER 1 This letter is submitted in conformance with Atomic Energy Act'of 1954 Section 182a,.'in response to NRC Bulletin 88-11 Pressurizer Surge Line Thermal Stratification.

W By:

D. C. She~1 ton, Vice President,. Nuclear

.i Sworn'and suberibed before me this 6th day of November, 1989.

YAubA Y 10 Notary PuFl'ic, State of Ohio l

EVELYN L DRESS NOTARYPUDUC,STATEOF0H 0 U '