ML19327B572
| ML19327B572 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 10/25/1989 |
| From: | Cockfield D PORTLAND GENERAL ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19327B573 | List: |
| References | |
| NUDOCS 8911020070 | |
| Download: ML19327B572 (1) | |
Text
_ ~
J y,
g I.
Y k -
David W. Coc'dield Vice President, Nuclear f
October 25, 1989 i
,i; j
Trojan Nuclear plant
[-
Docket 50-344 F.
License NPF-1 l
h
[-
_U.S. Nuclear Reguistory Commission.
f ATTW:
Document Control Desk
{
- Washington DC 20555 Dear Sira-i F
License Chante Application 172. Revision 1 Attached is one signed original of Revision I to License Change Application
-(LCA) 172 requesting amendment of Operating License NPF-1. 'This LCA
~
revises the-surveillance requirements for Cont ainment leak testing to make E-Trojan Technical Specification (TTS) 4.0.2, " Applicability", not applicable. The_ revision was necessary.-per your request, to show more precisely the inconsistencies between sections of the present TTS. A i
change bar in the right-hand margin of Attachment A shows the changes from L
Revision 0.
There are no further changes to Attachment B.
L Also attached is one signed copy of a Certificate of Service for LCA 172, Revision 1 to the chief executive of the county in which the facility is
{
located and the Director of the State of Oregon, Department of Energy.
i Sincerely, AW
,/
w 8911020070 891025 i
PDR ADOCK 05000344 P
PNU (
Attachment c:
.Mr. John B. Martin l
Regional Administrator, Region V l
U.S. Nuclear Regulatory Commission Me, David Stewart-Smith State of Oregon
)
Department of Energy l'
Mr. R. C. Barr l
NRC Resident Inspector Trojan Nuclear Plant y
b i
m sw seen sueet Poena Oregan 97204
_