ML19327B519
| ML19327B519 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon, Humboldt Bay, 05000000 |
| Issue date: | 10/24/1989 |
| From: | Locke R PACIFIC GAS & ELECTRIC CO. |
| To: | Dinitz I NRC |
| References | |
| NUDOCS 8911010021 | |
| Download: ML19327B519 (10) | |
Text
9p,
~
- i. ) E" Feems tes set tiestets Company 77 Deate Street R@vdi Locte d
-l SanItanusco.CA Att:my at Law 419m 0016 3
,e-
\\
u.au,,,, mm,
)
' F.
P O Boi 7447 san fraso.CA 94t?0 L
October 24, 1989 i
\\
s l
n Mr. 1ra Dinitz i
. Insurance and Indemnity Policy Analyst i
Mail Stop 12E4 U.S. Nuclear Regulatory Commission j
o Washington, D.C.
20555
}
Ret Docket 1;os. 50 275, 50-323 rod 50-133 3
Dear Mr. Dinitz:
l Enclosed are two certified copies each of the following policies / endorsements:
I 1.
Endorsements to PGEE's Facility Form Policies J
which reflect the reinstatement of limits for l
Diablo Canyon's Facility Form policies.
Policy No._
Endorsement Nos.
f i
NF-228 67, 68 i
MF-103 37, 38 j
2.
Endorsements to PG&E's Master Worker Certificates f
which reflect the return premium which accompanied the July 1, 1989 Master Worker Policy limitF l
increase.
Facility Certificata_LL.
ED4orsement No.
i i
f Diablo Canyon NW 132 5
j MW 73 5
l Humboldt Bay NW 51 5
j l.
MW 135 5
l l.
eg Please advise me if you have any questions.
Very July yours,
/.
'(9 l
r]CHA
( 0W
~
r RI KE RFL(5-6616):caf k\\
Attachments
\\
8911010021 891024 PDR ADOCK 05000133
.J:
[:
RECORDS TRAN@MITTAL 3h f'
' f,,. 7, 73 INSTRUCTIONS: Prepare 6ntripicare hh Forward tht cr@nd tranamittal, in advarce, to the Recoros Center by Company inau.
- ^
Send one Copy with *Jee shipmert
~
A reterton 3 erod (* id apptovel sgrato is required on all transmittals.
8, Do not ptace records with varous retention periods in the &&' Tie carton.
'j,Q If you are tot using the FPC. Regulations, atta::h explanaton for add *onal retert'on.
1 Of 1
- n.,'
DIVISIONrDEPARTMENT NUMBER OF 00KES RESPONSIBlui)
F l h GENERAL M FICE/ LAW (REGULATORY SECTION) 7 Desm CENTI 3
nETENilDN PERCD APPRCNED BY CURRENT DATE i',,
RICHARD F. LOCKE 10/10/S9
@2 95
'j?
ADDdESS ROOM Th.tkPHONE
~
~
h', ' nETURN TRANSMITTAL. TO posee pung BRAD YBARRETA 77 BEAT.E ST.
3014 9'3-6346 7
"",,,f j"..
' 6*""'
"Tg y'*
i messe uti-anons ma-masi L@
11 7IM h
DCNPP-FUEL POOL RERACKING 1995 1
4 *?
-y,h DCNPP-FUEL POOL-GENERIC ST.
2 77382
.,'f.
q,l i,*[ i DCNPP-DALY CITY 3
77M g..<
jd DCNPP (LTSP)-BULKY DOCU11ENTS 4
77384 4
a.I
,in W 1:9
,hs DCNPP (LTSP)-SAN BRUNO 5
773M e**.
78168 6
,.%p, DCNPP PLEADINGS-SIERRA CLUB t,
- c.,
783&I SIERRA CLUB v. U.S. NRC
\\/
7 s
4 8.,
Ulee' t
['
9,- Q
?Q 2L
),,'
,U:
..; r
- J '**
!} f.-
. f <,4 '.
1 4
I h*,*,
/
u L,
Nuclear Energy Liebility insurance u
. NUCLEAR ENERGY LIABLITY INSURANCE ASSOCIATION RESTORATION OF LIMIT OF LIABILITY ENDORSEMENT It is agreed that:
1.
Payments made and expenses incurred by the companies under this policy have reduced. in accordance with Condition 3 of the policy, the limits of the companies' liability stated in Item 4 of the Declarations ared in all Increase of Limit of Liability Endorsements.
2.
The limit of liability stated in Endorsement No.
60 which has been reduced is hereby restored to $ 155 400.000.00 This
, restored limit applies only with respect
- o obligations assumed or expenses incurred because of bodil by the nuclear energy hazard on ony injury or property damage caused after the effective date of this endorsement, l
3.
The lin,its of linoility stated in the policy shall not be cumulative.
{
Each payment made by the companies after the effective date cf this endorsement for any loss or expenso coverod by the policy shall reduce by the amount of such paymer.t every limit of liability, regardlers of j
};
which limit of. liability applies with respect to the bodily injury or i
pro,)erty damage Jut of which such loss or expense arit.es.
J.
This is to certify the' this is a true copy of the original i
Endorcement having the enuotrement number and being mad l
1 i
of the uck.ar Encray Liab!!ity Policy e part
{
iyute ility Fc.nn) as des.
icreo oI i
n
'~
hereunder.
un t
)
Anwrun Nuclear insurersimoe:hi, v.:e Preulent4)nderwnnre.
l Effective Date of ~ '
i this Endorsement July 1. 1989 To form a part of Policy No NF-228 12:01 A.M. Standard Time Issued to pacific Gas and Electric Company D:te of l oue September 8,1989 For the Sub ribing companies By d'
N PRESIDENT
[
.w. <a.x or Endorserant No 67 Countersigned by N"4 LNE-22b i.
1.
e.
g.
-.-c,p g
,-m w
-,y*,.
ey-.
9-vc-w--_
,-.--yw
i t
Nuclear Energy Watdlity lasurance
'& [
j MUCLEAR ENEROY IJANtJTY INSURANCR Asar20!A'!10N
[
t t
i ADVANCE PREMlUM AND STANDARD PREM10M ENDORSEMENT r
CALENDAR YEAR 1989 i
It is agreed that Items 1 and *. of Endorsmnt No, 64 are amended to read:
/
1.
ADVANCE PRENIUM:
It is agreed that the Advance t
lt Premium <tue the companies for the period designated above is:
590,907.00 I
i 2.
STt.NDARD PREM10M AND RFSER'iE PREMlUM:In the absence of I
a change in the Advance Premium indicated above, it is agreed that, subject to the provisions of the Industry Credit Rating l
Plan, the Standard Premium is said Advance Premium and the Reserve Premium is:
$ 446.764.00 i
Additional Premium is: $ 78.00 This is to certify that this is a inic copy of the cripnal t
Endort.cment having the endorsement number cad being made part of the Nudcar F.ncray liabil.ty Pohey (Fg.ilay Forrn) as des-ignated wrcon. ?!o insurance is nNonW hereunder.
s
- f -~~
l
.lohn L -
.'it2 oc$ Perwwn Underwrm is Anwnc.m itar answers i
Effective Date of
, 6his Endorsevnent January 1. 1989 To form a part of Policy No III-228 12:01 A.M. Standard Time i
Issusd to pacific Gas and Electric Company Date of Issue September 8, 1989 ror the Subs 6ribing companies By t*71Ys-A Endorsement No 68 Countersigned by NE-36
1
- l NUCLEAR ENERGY MANUTY INSUliANCE j
MUTUAL A'fDlWC ENERGI UANUT" UNDERWRITERS RESTORATION OF LIMIT OF LIABILITY ENDORSEMENT It is agreed that:
j 1.
Payments made and expenses incurred by the companies under this policy have reduced, in accordance with Condition 3 of the policy, the limits i
of the companies' liability stated in Item 4 of the Declarations and in all Increase of Limit of Liability Endorsements.
s 2.
The limit of liability stated in Endorsement No. _ 30 which has been reduced is hereby restored to $ 45.000.000.0D This restored limit applies onl expenses incurred becae* y with respect to obligations assumed or of bodily injury or property damage caused by So nuclear energy hazard on or after the effective date of this endorsement.
3.
The limits of liability stated in ee policy shall not be cumulative.
Each payment made by the companiet ofter the effective date of this endorsement for any loss or expense covered by the policy shall reduce by the amount of such payment every limit of liebility, regaldless of which limit of liability applies with respect to the bodily injury or property de'nage out of which such loss or expense arises.
This is to certify that 'his is a true copy of the original Endorsement having the endarr.ement n er and being made ;mrt c,f the N ' dear Energy Liability Pohc. J lity Form) es des-ignated h con nst c
ctander.
Ju5n L Qua.. (cid. We Presuent-Uxterwirm Amnican Nuc1 car Insure s Effective Date of this Endorseinent July 1. 1989 To form a part of Policy No.
MF-103 12:01 A.M. Standard Time Issued to Pacific Gas and Electric Company Date of Isaue September 8, 1989 For the Subsctibing Companies MUTUAL ATOMIC ENERCY LIABILITY UND[RWRITERS b
}
I4 T i
. m.W. ^, ' > N By,
Endorsement No.
37 Countersi ed by 1%
HE-22b Aut'horised Representative
=
l I
.1 NUCLEAR ENERGY LIABILITY INSURANCE' l
I MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS I
i ADVANCE PREMlUM AND STANDARD PREMlUM ENDORSEMENT l
CALENDAR YEAR 1989 I
r it is agreed that Items 1 and 2 of Endorsement No.
34 l
1 are amended to read:
1.
ADVANCE PREMlUM:
It is agreed that the Advance l
Premium due the companies for the period designated above is:
171.553.00 l
2.
STANDARD PREMIUM AND RESERVE PREMIUM:
In the absence of j
i a change in the Advance Premium indicated above. it is agreed j
that, subject to the provisions of the Industry Credit Rating h
Plan, the Standarti Premium is said Advance Premium and the f
i Reserve Premium is:
129.706.00
(
?
Additional Premium is:
$ 22.00 I
i This is to certify that this Is a true copy of the original t
Endorsernent hwing the enchrsement numker and being inade part l
of th Nxlent Energy LiabiYy Policy (Feg~ty Fonn) a; des.
ir..nd hs con. do 1r. sura. c i " i cunder.
i 8-O
& L Qu.
~3n, We, Preuant Undenvntire Amerkan Nuclear Inscrers Ef fect;ive Date of this Endorsement January 1, 1989 To form a part of Policy No.
MF-103 j
(.
12:01 a.fi. Standard Time Issued to Pacific Gas and Electric Comoany l
p l
l-Date of Issue September 8,1989 For the Subscribing Companies MUTUAL AftBt1C ENEBUT LIABILITr qtD[RifRITERS By
.T. A M
I4 t
Endorsement No.
38 countersi ed by N
Au'thorized Representative 1
-. - - ~
g Nuclear Energy Liability Insurance NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION
'B Ef e
ADVANCE PREMIUM AND STANDARD PREMIUM ENDORSEMENT Etse j gj CALENDAR YEAR 1989 H4 w5=
}t It is agreed that Items 1 and 2 of Endorsement No.
.{" E 6 g are amended to read:
4 o.9 F:
9 0
ka 5
$# f:i
- 1.
ADVANCE PREMIUM:
It is agreed that the Advance Premium h3 f
due the companies for the period designated above is:
oe z
8 5 E
y
{? j f
$ 407.00 2.? E k
'e
.? :c y
- 8 2
> :s fI wf 2.
STANDARD PREMlUM AND RESERVE PREMIUM: Ir. the absence g s 'g of a change in the Advance Premium indicated above, it
- g. h a ".g V )! $ Y G
is agreed that, subject to the provisions of the Indus-0
- 8 $ t' E$
try Retrospective Rating Plan, the Standard Premium is p3E
{p said Advance Premium and the estimated Reserve Premium r a: a m _
>d element of the Standard Premium is:
- J! o 8 d' 4 -('c e 05 E E E
$ 314.00 l
l Return Premium:
$19.00 1
l Effective Date of this Endorsement _
January 1,1989 To form a part of Certificate No.
NW-51 12:01 A.M. Standard Time Issued to l'acific Gas & Electric Company I
Dato of Issue Au1ust 11. 1989 For the Su rs'aing Co antes
^ '<' N h
By
\\
N
' RESIDENT
, R MMM.
Endorsement No.
5 countersigned by 1
1
t.p Nuclear Energy Liability leisurance MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS I-ADVAt;CE PREM10M AND STA?;DARD PREMlUM EllDORSEMEt!T CALENDAR YEAR 1989 It is agreed that items 1 and 2 of Eridorsement Nu.
3 d
are amended to read:
di i! E 5 u.
f'f[h 1.
ADVANCE PREM10M:
It is agreed that the Advance Premium fiEgy cue tne comparties for the period designated above is:
,u
'B g? b ' k 5
}
5 10,038.00 g
sus a> S V liij d wg s, i
3 P
2.
STANDARD PREMlUM AND RESERVE PREMlUM:
In the absence
- ', & a j! --
g of a cnange in tne Aavance Prenium indicated above. it 3yjd is agreed that, subject to the provisions of the Indus-
.g h.e $, I ;l try Retrospective Rating Plan, the Standard Premium is 5 g h 'l g 5
said Advance Premium and the estimated Reserve Premium gg g,
,2: p element of the Standard Premium is:
g g
t:
e 8.030,00
$.5 $-> 0'E c
\\
l
- 2 E 8 if k <g Return Premium is:
$ 357.00 l^
L 1
l l
j.
Effective Date of
(
.this Entorsement January 1.1989 To form a part of certificate No. MW-73 l
12:01 A.M. Standard Time I.-
1: sued to Pacific Gas and Electric Company l
Date of 1ssue Avaust 11. 1989 For the Subscribing Oompanies MUTUALA1CENERCTLIABILIT RWRITERS
,x i
countersi)edby b
Indorsement No.
5 Auenortzed Representative l
l%
['
{;
I i
Nuclear EnerTy Liability Insurance i
L NUCI, EAR ENERGY LIABILITY INSURANCE ASSOCIATION
)
?
'g ADVANCE PREM!UM AND STANDARD PREM!UM ENDORSEMENT t
d 8f 3
eo CALENDAR YEAR 1989 lhI
~
0:s?
o0
'.!VSE.
It'is agreed that Items 1 and 2 of Endorsement No.
3' s
F d { x.
are amended to read:
g {g ;n$
1 F
u.
o f
f' 1.
ADVANCE PREMIUM:
It is agreed that the Advance Premium b
O" n.
U due the companies for the period designated above is:
i 2 E 'b 5
.8 j 34.575.00 "e BB
- t a y a N.; s s
+
3 F ci>
- E i
E y.E ? -
E-2.
STANDARD PREMIUM AND RESERVE PREMIUM:In the absence E e $ e[. 'n$ $ of a change in the Advance Premium indicated above, it bgE p
is agreed that, subject to the try Retrospective Rating Plan, provisions of the Indus-8*
.'z S$n{5" the Standard Premium is said Advance Premium and the estimated Reserve Premium
.y e
a p s yd J.0 element of the Standard Premium is:
[
r
- E P E j B I".8 % L? 4 !
27.660.00 s
r Return Premium is: $
1,230.00 Effective Date of this Endorsement January 1.1989 To form a part of certifteate No.
NW-132 12:01 A.M. Standard Time 4
I Issued to Pacific Gas and Electric Comoany Date of Issue Auaust 11. 1989 For the Su ribing Companies i
.'d 5 h
By
\\
^
N PRESIDENT
.w. %
Endorsement No.
5 countersigned by_
f
i s
Nuclear Energy Liability Innrance MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS 1
j:
i ADVANCE PREMlUM AND STANDARD PREM10M ENDORSEMENT CALENDAR YEAR 1989 1
i lt is agreed that items 1 and 2 of Endorsement No.
4 are amended to read:
l t
1.
ADVANCE PREMIUM:
It is agreed that the Advane.e Premium cue tne companies for the period designated above is:
4
$118.00 2.
STANDARD PREM!UM AND RESERVE PREM!UM:
In the absence I
of a enange in tne Aavance Premium indicated above, it is agreed that, st.bject to the provisions of the Indus-try Retrospective Rating Plan, t:te Standard Premium is i
said Advance Premium and the estimated Reserve Premium element of the Standard Premium is:
$91.00 This is to certify that this is a truo cop
$6.00 0
t Return Premium:
ated hereon for insurance
[
oi insurence beating the number desj)oder the f4 covoreg Form).
@g dor.
altrocchi, Vico President Unoorwriting John L.
Iffective pat,og merican Nuclear insurers this Enforserent Ane 1, "8 Part of Certificate No. MW 135 12:01 A.M. Standard Time 1
Issued to Pacific Gas & Electric Comoany Date of Issue, Auaust 11. 1989 For the Subscribing Companies MUTUAL A C ENERCT LIABILITT RWEITERS t.
.T.
N i
By i
Endorsement No.
5 Countersi ed by W
' Authorized Representative l
2