ML19327B449

From kanterella
Jump to navigation Jump to search
Notification of CRGR Meeting 172 on 891025 in Bethesda,Md to Review Proposed Rev 3 to Reg Guide 1.35 Re Insp of Prestressed Concrete Containments & Staff Denial of Claim of Backfit on Use of Nuclear Heat for Leak Testing BWRs
ML19327B449
Person / Time
Issue date: 10/20/1989
From: Jordan E
Committee To Review Generic Requirements
To: Arlotto G, Goldberg J, Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), NRC OFFICE OF THE GENERAL COUNSEL (OGC)
References
RTR-REGGD-01.035, RTR-REGGD-1.035 NUDOCS 8910310216
Download: ML19327B449 (2)


Text

-

i

~ $#

t

'?

NUCLEAR REGULATORY COMMISSION f

,i W ASHWGTON. D. C. 20665 k...../

October 20, 1989 I

L I

i' MEMORANDUM FOR:

Guy A. Arlotto, NMSS l

Jack R. Goldberg, OGC L

Luis A. Reyes, RII Denwood F. Ross, RES p

James H. Sniezek, NRR s

FROM:

Edward L. Jordan, Chairman Committee to Review Generic Requirements

SUBJECT:

CRGR MEETING N0. 172 The Committee to Review Generic Requirements (CRGR) will meet in the afternoon on Wednesday, October 25, 1989, in Room 6507 MNBB.

The agenda is as follows:

1:00-2:30 p.m.

L. Shao (RES) will present for CRGR review proposed l

Revision 3 to Reg. Guide 1.35, " Inservice Inspection of Ungrouted Tendons in Prestressed Concrete Containments,"

and proposed Reg. Guide 1.35.1, " Determining Prestressing Forces for Inspection of Prestressed Concrete Contain-ments." (The review package is Item #7 distributed to l

CRGR members on August 24, 1989.)

2:30-3:30 p.m.

J. E. Richardson (NRR) will present for CRGR review the staff denial of a claim of backfit on the issue of use of nuclear heat for hydrostatic and leakage testing of BWR's.

(The review package is Item #10 distributed to CRGR members on September 18, 1989.)

l 3:30-a:30 p.m.

The Committee will discuss a proposed standard format for backfit discussions included in generic letters and j

bulletins.

(Package to be provided.)

If a CRGR member cannot attend the meeting, it is his responsibility to assure that an alternate, who is approved by the CRGR Chairman, attends the meeting.

l P2rtons making presentations to the CRGR are responsible for (1) assuring that tne information required for CRGR review is provided to the Committee (CRGR i

Charter - IV.B), (2) coordinating and presenting views of other offices, (3) as appropriate, assuring that other offices are represented during the l'

presentation, and (4) assuring that agenda modifications are coordinated with

+he CRGR contact (J. Conran X29855) and others involved with the presentation.

Oni: ion lii.s dors or higher management should attend meetings addressing

/

agenda items unoer their purview.

}s OFo3 l

s910310216 691020

. r,

'} g y PDR REVGP NROCPGR ig MEETING 172 PDL l

sbo

.+

.. o l

c

=

' 2 '-

i e

In accordance with the ED0's March 29, 1984 memorandum to the Commission con-cerning~" Forwarding of CRGR Documents to the Public Document Room (PDR)," the review packages for items scheduled at this meeting, which contain pre.

i decisional information, will not be released to the PDR until the NRC has c0nsioered (in a public forum)'or decided the matter addressed by the information.

OrbbelStud by!

E. L Jordan Edward L. Jordan, Chairman i

Committee to Review Generic Requirements t

cc w/ review packages:

SECY l

J. Taylor i

i cc w/o review packages Commission (5) l J. Lieberman J. Partlow Regional Administrators W. Parler i

J. E. Richardson L. Shao Distribution:

i E. Jordan J. Heltemes l

J. Conran D. Allison L. B. Marsh C. Berlinger R. Fraley i

P. Kadambi CRGR CF CRGR SF.

S. Treby i

M. Taylor, OEDO PDR (NRC/CRGR)

  • Centrekfilee-t DTC : AE00:CRGR :

A D: DD

C/CP qf--.-.... -[: M

,. er....--.................----:..---------.:.--..-..-

t


.--.7 NAME :JCon,. p' : CJH emes :

dor an 10// g F89 :

10 i/89 10// 9/89 DATE :

0FFICIAL RECORD COPY

,. -