Summary of 891005 Meeting W/Util in Rockville,Md Re Various Strategies for Addressing Steam Generator Tube Problems at Plant & Amends Associated W/Strategies.List of Attendance Encl
ML19327A987
Person / Time
Site: Summer 
Issue date: 10/16/1989
From: Hayes J
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8910240142
Download: ML19327A987 (3)


Text

.i

=

7

,4

  • ~

Oct:ber 16, 1989 l M.

n4 DocLet No. 50 395 L

LICENSEE: South Carolina Electric & Gas Company l

i FACILITY:

V. C. Sumer Nuclear Station, Unit No.1 l

t

SUBJECT:

SUMMARY

0F MEETING WITH SOUTH CAROLINA ELECTRIC & GAS COMPANY i

r f

i GENERAL l

On October 5,1989, the staff of the Office of Nuclear Reactor Regulation f

(NRR) not with representatives of the South Carolina Electric & Gas Company (SCE&G) to discuss the nrious strategies for addressing steam generator i

tube problems at tha V. C. Sunener Nuclear Station and the anendn=nts associated i

with these strategies.

The meeting was held at the hRR offices in Rockville, Maryland. A list of those persons who uttended the nesting is included as l.

+

,DyCUSSION s

The licensee presented their integrated program for addressing the continual degradation of the V. C. Sunsner steam generator and their rationale for having Lhese options available for the March 1990 refueling outage. The licensee m

presented the impact on the Sumer Nuclear Station if the options L* and f*

are not available for the refueling outage. The licensee also discussed the i

r;ead for the B&ti short sleeve anendnent.

J As a result:of'the neeting it was determined that (1) additional data i

reflecting industr3 experiance with F* is necessary for the F* awndment, (2)

.f a meeting will be held between SCE&G and the NRC to discuss sons of the technical aspects of t.*, most notable the adequancy of tre use of eddy current j

testing to determine steam generator tube crack size and orientation and (3) the NRc will investiage ways to handle the B&W sleeving amendment request in a manner to ensure that resolution has been reached on its use prior to the

. March 1990' refueling outage, e

l 9

Original Signed By:

l 3

k[Nfh bfd95 John J. Hayes, Jr., project Manager f

P Prc Project Directorate 111 i

Division of Reactor Projects - I/11 f

Office of Nuclear Reactor Regulation

Enclosures:

As stated cc w/ enc 15:

b N0l See next page t

PDll.1 i

' OFC :PD

.....:f..If.M.[I..::

,NAME ;JH

sw
3........t........d,}E Aden sam 1DATE :10//d/89
10/{ (/89 OFFICIA'. RECORD COPY Document Name:

{, SUM 4ER

SUMMARY

REPORT)

. if).

i kI

,.c Erclosure 1 ATTENDANCE October 5, 1989 SCEAG OTHERS NRC N. Browne L. Connor E. Adensam S. Hunt (The NRC Calendar)

C. Cheng D. Moore H. Conrad K. Nettles J. Hayes, Jr.

A. Rice E. Murphy.

K. Wickman i

l e

0,_,

i

,.(

q e

plSTRIBUTION FOR MEETING Sl5HARY DATE0: October 16, 1989

- Facility: Summer j

Deebettfile i-NRC FDR Local PDR 4

T. Murley 12-G-18 i

J. Snierek 12-G-18 E. Adensam~

14-B-20 l

P. Anderson 14-8-20 J. Hayes 14-B-20 OGC 15-B-18 L

E. Jordan SNBB-3302 i

B. Grimes 9.A 2 H. Conrad C. Cheng j

E. Hurphy K. Wickman ACRS(10)

P-315 B. Borchardt 17-G-21

{

I l

i i

e o

ii Y

i i

6 5

p

_