Notice of Violation from Insp on 890730-0909.Violation Noted:Rod Positions Not Determined to Be within Group Demand Limit Every 4 H from 890716-0801
ML19327A865
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 09/29/1989
From: Chaffee A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML19327A864 List:
References
50-344-89-20, NUDOCS 8910180314
Download: ML19327A865 (1)


Text

-

.s i

APPENDIX A NOTICE OF VIOLATION 1

i Portland General Electric Company Docket No. 50-344 Trojan Nuclear Plant License No. NPF j During an NRC inspection conducted from July 30 through September 9, 1989, a 3

violation of NRC requirements was identified.

In accordance with the " General i

Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1989), the violation is listed below:

Trojan Technical Specification Surveillance Requirement 4.1.3.1.1 states "The position of each rod shall be determined to be within the group l

demand limit by verifying the individual rod positions at least once per l

l 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> except during time intervals when the Rod Position Deviation Monitor is inoperable, then verify the group positions at least once per four hours."

Contrary to the above, from July 16, 1989, through August 1, 1989, while l

the reactor was in Mode 1 or Mode 2 with the Rod Position Deviation Monitor inoperable, the position of each rod was not determined to be within the group demand limit by verifying the individual rod positions at least once per four hours; rather the rod positions were verified once every twelve hours.

This is a Severity Level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Portland General Electric Company is hereby required to submit a written statement of explanation to the U.S.

Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555 with a copy to the Regional Administrator, Region V, and a copy to the NRC Senior Resident Inspector, Trojan, within 30 days of the date of the letter transmitting this Notice.

This reply -should be clearly marked as a

" Reply to a Notice of Violation" and should include for each violation: (1) l the reason for the violation if admitted, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be j

j taken to avoid further violations, and (4) the date when full compliance will 1

I in this Notice, an order may be issued to showyed within the time specifie be achieved.

If an adequate reply is not recet l

cause why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.

Consideration may be given to extending the response time for good cause shown.

FOR THE NUCLEAR REGULATORY COMMISSION f

j w.wm ~

g. E. Chaffee, Acting Chief A

Reactor Projects Branch Dated at Walnut Creek, California l

this g day of September, 1989 8910180314 890929 1

PDR ADOCK 05000344 O

PDC 9.a #

4

.m,-

rm.#

- k

,w m

  • 6-

,-