ML19327A508

From kanterella
Jump to navigation Jump to search
Forwards Info Re Backfill & Buried Piping Near Intake Structure,Per Agreement Reached in 800716 Meeting. Documentation Demonstrating Adequacy of Deep Fill Adjacent to Power Block Structures Available Onsite.W/O Encl
ML19327A508
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/28/1980
From: Widner W
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8008060282
Download: ML19327A508 (1)


Text

- _

0097

_v

. ws I t'.s d.1 PT 3dT,

  • --r;ye-
  • 4 9,'j c. *ci p GeorgiaPower W. A. Widn.,

'{'Lll;ll'~"~"'"

i~ souirem esecinc svs:em u

., o July 28, 1980 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 3100 101 Marietta Street, NW Atlanta, Georgia 30302 ATTENTION: Mr. James P. O'Reilly NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 PIPING AND BACKFILL EVALUATION Gentlemen:

The enclosed information on the backfill and buried piping near the Plant Hatch intake strucure is being submitted in accordance with the agreement reached in our meeting of July 16, 1980.

If you have any questions concerning this material, please inquire.

During the subject meeting, representatives of NRC, Region II requested that the deep fill adjacent to the power block structures be evaluated.

Documentation that demonstrates the adequacy of this material is available on-site for NRC inspector review.

Sincerely, S

d

~f vW.A.Widner g

LTG/mb Enclosure l

kool I

s

/

Due to the volume of the enclosure, copies are not being distributed. A copy is available for examination

,t the Nuclear Generation office.

8008060- 2811 "i

- - -