ML19327A356

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Rept 70-1100/80-04.Corrective Actions:Mgt Review & Audit of Measurement Control Plan Will Begin on or About 800715
ML19327A356
Person / Time
Site: 07001100
Issue date: 06/18/1980
From: Lichtenberger
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: Martin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19327A354 List:
References
NUDOCS 8008060071
Download: ML19327A356 (1)


Text

..

~

C-E Power Systems Tel 203/6881911

/ ',

Combustion Engineering. Inc.

Te!ex: 9-9297 ij 1000 Prospect Hill Road Windsor, Connecticut 06o95 H SYSTEMS POWER June 18, 1980 U. S. Nuclear Regulatory Commission Directorate of Regulatory Operations Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention: Mr. Walter G. Martin, Chief Safeguards Branch

Subject:

Docket 70-1100 License SNM-1067 Inspection 70-1100/80-04 Gentlemen:

This will acknowledge the June 9,1980 receipt of your June 4,1980 letter concerning the subject inspection.

A management review and audit of the Measurement Control Plan has been scheduled to be initiated on or about July 15, 1980.

It is anticipated that the final written report prepared by the auditors should be provided to management within the 60 day calendar requirement established by USNRC, Subsequent measurement review and audits will be scheduled during the first half of subsequent calendar years in order that one calendar year interval will not be exceeded.

Replicate data for the Davis Gray (British) analysis for the material balance period ending February 21, 1980 requested in your June 4, 1980 letter is enclosed.

Very truly yours, H. V. Lichtenberger Vice President - Nuclear Fuel Nuclear Power Systems Divis. ion TBB:HVL:sas Enclosures 8008060