ML19327A165

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 80-08, Examination of Containment Liner Penetration Welds. Facility Will Contain Flued Head Design Described in Bulletin.Heads Will Use Single V Groove Welds W/O Backing Rings
ML19327A165
Person / Time
Site: Hope Creek, 05000355  PSEG icon.png
Issue date: 07/02/1980
From: Martin T
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-80-08, IEB-80-8, NUDOCS 8008010220
Download: ML19327A165 (4)


Text

.

.+ -

T%

Thomes J. Martin Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-8316 Vice President Engineering and Construction July 2, 1980 Mr. Boyce H. Grier, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

NRC BULLETIN NO. 80-08 EXAMINATION OF CONTAINMENT LINER PENETRATION WELDS NO. 1 AND 2 UNITS HOPE CREEK GENERATING STATION In reply to IE Bulletin No. 80-08 dated April 7, 1980, we offer the following:

The Hope Creek Generating Station will contain the flued head design as described in Bulletin No. 80-08. None of the flued heads have been installed to date. Heads will be fabricated to ASME Section III, 1974 Edition through the 1974 Winter Addenda using single V groove welds without backing rings. The nozzle flued head and expansion joint materials and pip. cizes are listed in the attached Table 1. The joints are considered Nuclear Class II and radiography will be performed.

Should any additional information be desired, we will be pleased to further discuss it with you.

Very truly yours, e

CC: Director.

Division of Reactor Construction Inspection Washington, D. C.  !

l I

9008010 2 2D

S .,

TABLE 1 >

PENETRATIONS, HOPE CREEK, UNITS 1 AND 2 Pipe Dryw' ell Expansion Joint Nozzle Flued Head Penetration Size, Material Nozzle Material  !

(

Item Number Inch Material SA516 GR70 SA.105 SA 155 KCF60 CLS 1 l P-1A,B,C,D 44 Impact Tested SA516 GR70 SA 350 LF2 SA155 KC70 CLS 1 2 P- 2A , B 42 36 SA516 GR70 SA 350 LF2 3 P3 SA 350 LF2 .

P4A,B 28 SA516 GR70 4

PSA,B 28 SA516 GR7 0 SA 350 LF2 5 SA 350 LF2 6 P6A,B,C,D 28 .S A516 GR70 26 SA516 GR70 SA 350 LF2

  • 7 P7 SA 105 LF2 8 P8A,B 26 SA516 GR70 22 SA516 GR70 SA 350 LF2 9 P9 SA 350 LF2 10 P10 22 SA516 GR70 30' rSA333 GR 1 or 61 SA 350 LF2 11 P11 SA 350 LF2 12 P12 18 SA333 GR 1 or 61 SA 155 KC70 CLS 1 SA'105 P38A,B 26 SA516 GR70 .

13 SA 182J.F316L. -

14 Pl7 12 SA333 GR 1 or 61 -

12 SA333 GR 1 or 61 'SA 182 F316L' 15 P18 SA 182 F316L - -

P19 8 SA333 GR 6 16 SA333 GR,6 SA 182 F316L -

P20 8 17 SA333 GR 6 SA 182 F316L -

18 J41-52 8

@TES:

Items 1 thro' ugh 13 - The drywell nozzle Itemsis14

. welded throughto18 the expansion

- The drywellpoint, nozzlewhich in is welded turn is welded to the flued head. '

directly to the flued head.

PP2 02A -

e e_______-._-_______________ _ . _ . _ . _ _ _ _ _ _ . _ _ _ _ . - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - - _ - _ _ - _ _ _ - _ . _ _ - - _ - _ - _ _ - - _ _ - - _ _ - _ _ _