ML19326E054
| ML19326E054 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/16/1980 |
| From: | Herbein J METROPOLITAN EDISON CO. |
| To: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 8007250504 | |
| Download: ML19326E054 (2) | |
Text
-. _.
fAttropotion Edison Company m
' [1 t
$ If,"
if ()[
Post Of fice B:nc 480 if f'
Middletown. Pennsylvania 17057
__r.
t 717 944 4041 1
Writer's Direct Dial Nurnber July 16, 1980 TLL 339 Office of Inspection and Enforcement Attn:
E. J. Brunner, Chief Reactor Operations and Nuclear Support Branch U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pa.
19406
Dear Sir:
Three Mile Island Nuclear Station, Unit I (T'41-1)
Operating License No. DPR-50 Docket No. 50-289 Inspection Report 50-289/80-05 This letter is in response to Inspection Report 50-289/80-05 uhich contains one apparent deviation. Attached please find our response.
Sincerely, S!gned 3. G. Herbein J. C. Herbein Vice President TMI-I JCH:DGM: hah Attachment-cc:
B. H. Crier R.11. Reid B. J. Snyder D. Dilanni
'H.
Silter J.
T.. Collins b s I
k-
- V h
E
TLL 339 INSPECTION REPORT 50-289/80-05 Deviation:
The RRR is a three volume document that had been submitted by the licensee to NRC-URR describing the control and requirements to be imposed on Unit I restart activities. The inspectors noted that in a number of instances this document imposes requirements in addition to those found in the QA Progran and implementing procedures such as GP-1008.
The inspector identified that those additional RRR requirements vere not included or referenced in 2ny impicmenting instructiona/ procedures, including engineering tasks assigned to the licensee's architect /
engineer (three specific examples are discussed in paragraphs 4.c and 5.b of this report).
The failure to incorporate those additional requirements into implementing instructions / procedures is considered to be a deviation since the RRR is a written commitment to the NRC (289/50-05-01).
Response
The failure to incorporate the additicnal RRR requirements into implementing instructions has been corrected by the issuance of the GAI/GPU"C TMI Project Management Manual rev. O dated 4/30/80 and GPUNC ES-009 rev. O dated 7/8/80. Paragraph 2:05 of TMI PMM directs the project engineer to ensure that all CAI work is done in accordance with RRR.
CPUNC ensures same by using the Verification Checklist in ES-009.