ML19326E051

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-0820/80-06 on 800513-15.No Noncompliance Noted.Major Areas Inspected:Organization,Shipping & Receiving,Measurements & Statistical Controls.Details Withheld (Ref 10CFR2.790)
ML19326E051
Person / Time
Site: Wood River Junction
Issue date: 06/13/1980
From: Cohen I, Joyner J, Zibulsky H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19326E049 List:
References
70-0820-80-06, 70-820-80-6, NUDOCS 8007250494
Download: ML19326E051 (1)


Text

__

)

U. S. NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT REGION I Report No. 70-820/80-06 I

Docket No.70-820 License No.

SNM-777 Safeguards Group Licensee:

United Nuclear Corooration Wood River Junction, Rhode Island 02894 Facility Name:

UNC Recovery Systems Inspection At:

Wood River Junction, Rhode Island Inspection Conducted:

May 13-15, 1980 Date of Last Material Control and Accounting Inspection:

January 31, 1980 Type of Inspection:

U.nannounced Material Control and Accounting

(. ff O Inspectors:

I. Cohen, Chemist date OsuOs O -r b-3-70

/

H.Zibulf,kyYChemist L

date date Approved by:

%M L fo J{p.'y1er,[hief,NuclearMaterialControl date Tuppor Section Inspection Summary:

Areas Inspected:

Organization, Shipping and Receiving, Measurements and Statistical Controls.

The inspection involved 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> onsite by two NRC inspectors and was begun during the regular hours.

Results: The licensee was found to be in compliance with NRC requirement-the areas inspected.

8 o o 7 eso qqq Region I Form 165 l

(August 1979)