ML19326E051
| ML19326E051 | |
| Person / Time | |
|---|---|
| Site: | Wood River Junction |
| Issue date: | 06/13/1980 |
| From: | Cohen I, Joyner J, Zibulsky H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19326E049 | List: |
| References | |
| 70-0820-80-06, 70-820-80-6, NUDOCS 8007250494 | |
| Download: ML19326E051 (1) | |
Text
__
)
U. S. NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT REGION I Report No. 70-820/80-06 I
Docket No.70-820 License No.
SNM-777 Safeguards Group Licensee:
United Nuclear Corooration Wood River Junction, Rhode Island 02894 Facility Name:
UNC Recovery Systems Inspection At:
Wood River Junction, Rhode Island Inspection Conducted:
May 13-15, 1980 Date of Last Material Control and Accounting Inspection:
January 31, 1980 Type of Inspection:
U.nannounced Material Control and Accounting
(. ff O Inspectors:
I. Cohen, Chemist date OsuOs O -r b-3-70
/
H.Zibulf,kyYChemist L
date date Approved by:
%M L fo J{p.'y1er,[hief,NuclearMaterialControl date Tuppor Section Inspection Summary:
Areas Inspected:
Organization, Shipping and Receiving, Measurements and Statistical Controls.
The inspection involved 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> onsite by two NRC inspectors and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirement-the areas inspected.
8 o o 7 eso qqq Region I Form 165 l
(August 1979)