Text

.

Docket No. 50-346 Q TOLEDO- EDISDN License No. NPF-3 Ac- ao P cuaun V(e Presce-t Serial No. 630 " "'

(4191259 SP21 July 22, 1980 Director of Nuclear Reactor Regulation Attention: Mr. Robert W. Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C. 20$55

Dear Mr. Reid:

This letter transmits five (5) copies of Supplement No. 2 to the " Davis-Besse Nuclear Power Station Unit No. 1 Seismic Reevaluation" transmitted by our letter of July 9, 1979 (Serial No. 525).

In this supplement, Toledo Edison has completed the Qualification Summary of Equipment for all the equipment listed in Attachment 1 to your staff's January 30, 1979 letter (Log No. 371).

This seismic reevaluation demonstrates that the Davis-Besse Nuclear Power Station Unit No. I has sufficient design conservatism and margin to ensure safe shutdown and continued shutdown heat removal in the event of a Safe Shutdown Earthquake having a ground acceleration of 0.20g.

This seismic reevaluation fulfills the requirements of Section 2.C(3)(r) of Operating License No. NPF-3 for the Davis-Besse Nucleat Power Station, Unit No. 1.

Yours very truly, f  ;::^ '

Attachments RPC:CLM db c/12 THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43S52 8 0 o q y _y f;g

DIRECTIONS FOR INSERTING SUPPLEMENT 2 0F THE SEISMIC REEVALUATION REPORT During insertion of the revised pages, a dash (-) in the remove or insert column of the directions means no action is required.

REMOVE INSERT SECTION I I-3 I-3 SECTION VI VI-1/VI-2 VI-1/VI-2 VI-3/VI-4 VI-3/VI-4 VI-5/VI-6 VI-5/VI-6 VI-7/VI-8 VI-7/VI-8 4

VI-9 VI-9 TABLE Table VI-1 Table VI-1 DATA SHEETS Between Data Sheets 6 and 9 Data Sheet 7 Sheet 1 of 4 Sheet 2 of 4 Sheet 3 of 4 Sheet 4 of 4 Data Sheet 8 Sheet 1 of 3 Sheet 2 of 3 Sheet 3 of 3 i

l l

7, _