PNO-TMI-80-038B:on 800702,purging of Reactor Bldg Atmosphere Continued at Various Flow Rates Based on Meteorological Conditions.Scheduled Shutdown Lasting 5-h Occurred for Computer Maint
ML19326D938
Person / Time
Site: Crane 
Issue date: 07/02/1980
From: Jay Collins, Conte R, Fasano A
Office of Nuclear Reactor Regulation
To:
References
PNO-TMI-80-038B, PNO-TMI-80-38B, NUDOCS 8007250237
Download: ML19326D938 (1)


Text

5 ini.LiMi!.ARY Nui1110 i10ti July 2. 1980 PHil lM:NMY :4011F ICAllCN OF DTN! OR UGUSUAL CO!;CURR! ttCE--PNO-1MI-80-38B This yryli;nin,ary not,ificgiun constitutas TARl Y notice of events of FOSSISLE safety or out,i_i c i n t e rg,st significance. _ Tne inforr..ation presented is as initially received without ver:fication or evaluation and is Desically a l,s tnat is known by t4RC staf f on this date.

Facility: Metropolitan Edison Company Three Mile Island, Unit 2 Middletown, Pennsylvania

'O D

Prl D U

la n

Dju OJ

[j s)]

.J e d

Docket Number 50-320 i

1 Sutqec_t.: aggt70R BUILDING FURGE STATUS Furging of the reactor building atmosphere utilizing the modified hydrogen control (MliC) system continued at various system flow rates based on meteorological condition. Mcmentary shutdowns also occurred due to stack monitor filter changeouts.

Also a scheduled shutdown lasting approximately 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> occurred for computer maintenance.

Maximum purge system flow rate was approximately 540 cfm while stack flow rate averaged apo rc=it.ately 100,000 cfm in the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Total calculated radioactivity released as of 7:00 a.m. was 9676 Ci based on stack flow rate and measured stack concentration.

Remaining concentration in the reactor buildin9 based on the last building sample was analy ed at.89 uCi/cc (50,409 Ci, total).

NRC evaluation of the additional particulate monitor on the plant stack is in progress.

Crab namoles continue to verify little or no particulate activity released and are ir. dependently verified by the NRC Region I mobile laboratory.

Additional recorts on reactor building purt;ing will be updated on a daily basis during the initial stages of purging. 'ihe NRC Region I mobile laboratory will continue to be used to verify tne licensee's analytical results.

Media interest has occurred because of public sensitivity to this evolution and TMI related events. The Comenwealth of Pennsylvania has monitored these events.

NRC has responded to incuirics. The NRC TMI Program Office staff has monitored events as they occur on a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> basis.

This in curr nt as of in g

_ Contact R. J. Conte '590-3950 A. N. Fasano 590-3950 J. T. Collins 590-3955_

??N250 2 0 ?.

.