ML19326D747

From kanterella
Jump to navigation Jump to search
Forwards LER 80-052/03L-0
Date released: 12/06/2019 Download: ML19326D747


LER 80-052/03L-0:on 800530,preliminary Analysis Results of Turbine First Stage Pressure Input to Interlock P-7 Indicated That Setpoints Exceeded Tech Spec Limits.Cause Undetermined.Changes to Calibr Procedures Will Be Made
ML19326D750
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/30/1980
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19326D750 (2)
Forwards LER 80-052/03L-0
ML19326D746
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/30/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19326D746 (1)