ML19326D545

From kanterella
Jump to navigation Jump to search
Forwards Interim Deficiency Rept Prepared by B&W Re Surveillance Specimen Holder Tubes.Next Rept Will Be Sent by 770531
ML19326D545
Person / Time
Site: Midland
Issue date: 03/30/1977
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19326D541 List:
References
HOWE-55-77, NUDOCS 8006180677
Download: ML19326D545 (1)


Text

_ . . _ . . _. _.._ _

e  ; _,

3

_/ .

,---~

P. . .. u" -.m. ."n g3

,f

, ,..7 y . .. n si.,n.e w. we-.ii v.c. e,..ar.ar 2:. " ' 1'f

,N ~.s,

. Lua. .usQ.

Generes offices: 212 west wcmgan Avenue..ieckson. wcmgan 49:oi March 30, 1977 Hove-55-77 Mr J. G. Keppler, Regional Director Office of Inspection and Enforcement US Nuclear Regulatory Cc= mission Region III 799 Roosevelt Road Glen Ellyn, IL 60137

. MIDLAND PLANT SURVEILLANCE SPECIME'l HOLDER TUBES DOCKET NOS. 50-329 AND 50-330 CONTROL NO. H0 1289F3 . -

The report attached to this letter was prepared by the Babcock and Wilcox Company to describe the status of action relative to their reactor vessel surveillance specimen holder tubes. Per 10 CFR 50.55(e), we previously reported on this subject on an interim basis to Dr Volgenau on May 12 and September 2h, 1976. The attach-ment is another interim report. B&W is continuing to define the corrective action which vill be taken and the safety implications of the correction to the holder tubes. It is expected that this information vill be available in May of 1977; therefore, another report, interim or final, vill be sent on or before May 31, 1977.

y Stephen H. Howell CC: Dr Ernst Volgenau (15)

Director, Office of Inspection & Enforcement US Nuclear Regulatory Cc= mission Washington, DC 205h5 Director, Office of Management Information and Program Control US Nuclear Regulatory Commission Washingtor., DC 205h5

'8006180 '

ppR 11977

.