Text
!
O ya o
o censumers fi,iw, Power C0mp05']
s _ _,-
General CHices: 2tG West Michigan Avenue. Jackson, Micnigan 49201. Area Code 517788-05S0 March 29, 1976
-Re[dal0iy DOChet h' 3
-~,
N.s y
} {t._
i j g
Director of Nuclear Reactor Regulatio 8 C :
Division of Project Management b
g#G X '8,' C Attn:
Mr. Roger Boyd, Director U.S. Nuclear Regulatory Commission 7
$k-
~
,. i,'
\\f bh j,# -
,s O
C go N,v,s x-p'g/
Washington, DC 20555 i-..,-
"8 W D(#'
MIDLAND PROJECT DOCKET NUMBERS 50-329, 50-330 j.
QA REGULATORY GUIDE RESPONSES i\\>
FILE: 0505.2 SERIAL: 22h6
~
On October 15, 1975 ve sent a letter to you containing proposed responsive posi-tions relative to Regulatory Guides 1. 28, 1. 30, 1. 37, 1. 39, 1. 58, 1. 6h, 1. 74,
1.88 and 1.9h and draft ANSI N45.2 standards, N45.2.8, Nh5.2.12 and N45.2.13 Subsequent to that submittal a meeting was held in Bethesda, Maryland on November lk, 1975 vith members of the NRC staff and representatives of Consumers Power Company, Bechtel Associates Professional Corporation and Babcock and Wilcox Company. As a result of that meeting, Consumers Power decided to modify its submittal to incorporate the Consumers Power, Bechtel and Babcock and Wilcox QA topical reports with some alternatives and clarifications.
Attached to this letter is a proposed " Quality Assurance Program" description for the Midland Project. This program description incorporates the Consumers Power, Bechtel and Babcock and Wilcox QA Topical Reports subject to " effective dates".
The following sections of the attached program description are still under development:
A.
Page 1, item #1 - The Revision number and date of the Consumers Power QA Topical Report is not available because this topical report has not been approved by the NRC QA Branch.
B.
Sections I-G and I-K are not available because those alternates are being developed as " miscellaneous" Regulatory Guide positions.
Upon resolution of the positions, they vill be included in Sections I-G and I-K.
C.
Section III - The "effectivity" dates are not available because these vill have to be developed after concurrence is received from the NRC on the positions described in Sections I and II.
8006090 7/8
e p
2 D.
Section I" - The exceptions which will be discussed in this section are not available because these exceptions vill have to be defined after concurrence is received frca the NRC on the position described in Sections I and II and after the "effectivity" dates of Section III are defined Please review the attached proposed " Quality Assurance Program" description and provide an evaluation as to the acceptability of that description.
&/
( iLll h d-G. S. Keeley' Project Manager GSK/HWS/fw
QUALITY ASSURANCE PROGRAM Subject to those effectivity dates shown in Section III below, the Midland Project Quality Assurance Program will comply with the requirements of the following documents:
1.
For Consumers Power Activities; The Consumers Power Company Quality Assurance Program Manual (Topical Report No. CPC-1, Revision
, dated
)
2.
For Bechtel (Architect-Engineer, Constructor) Activities; Bechtel Quality Assurance Program for Nuclear Power Plants (Topical)
Report No. BQ-TOP-1, Revision lA, dated May 1, 1975) 3.
For Babcock and Wilcox (Nuclear Steam Supply System Supplier) Activities; B&W N.P.G.D. Quality Assurance Program for Nuclear Equipment (Topical Report No. BAW-10096A, Revision 1, dated March, 1975)
This compliance is subject to the following alternatives, interpretations, and exceptions:
I BECHTEL ALTERNATIVES AND INTERPRETATIONS Note:
Unless specifically noted otherwise all organizations, groups, and personnel discussed in thisSection I are Bechtel organizations, groups, and personnel.
The following alternatives and interpretations apply to the implementation of the Bechtel QA Topical Report (BP-TOP-1):
A.
Construction Work Procedures The Bechtel Quality-Assurance Topical (Section 1.5.4, page 12, paragraph 1) requires that " Construction Managers are responsible for the management and technical direction of assigned projects, and for assuring that construction projects are provided with appropriate personnel, and are following prescribed division practices and procedures for conduct of construction activities.
-'N Chief Construction Engineers are responsible for providing division standard work procedures to the projects". The Topical (Section 1.5.2, page 11, sub-paragraph 3) further requires that the Quality Assurance Manager be responsible for " Approving quality related procedures and manuals prepared by departments and projects within his division for conformance to quality assurance policies".
In lieu of this requirement the Bechtel Midland Quality Assurance Pro-gram requires that Construction personnel perform their quality program related functions using either division standard work procedures prepared by Construc-tion Engineering or project work procedures prepared by Project Field Engineer-ing personnel. The final decision on which to use rests with the Project Field Engineer.
All quality program related procedures used by Construction personnel are approved by Project Quality Assurance.
Project Field Engineering has already prepared and is in the process of preparing approximately 75% of the required construction work procedures.
Many of these work procedures were prepared prior to the existence and issue of procedures issued by the Division Chief Construction Engineer.
B.
Review of Quality Control Instructions The Bechtel Quality Assurance Topical (Section 1.6.1, page 14, subparagraph
- 13) requires that Project Quality Assurance " Review, prior to use,... Quality Control Instructions..."
In lieu of this requirement the. Consumers Power Company Quality Assurance Topical Report requires that all Quality Control Instructions be reviewed and approved by Consumers Power Company Quality Assurance prior to use. This review implements the commitments for review described in Section 1.6.1 sub-paragraph 13 of the Bechtel Quality Assurance Topical.
The Bechtel Midland Quality Assurance Program also requires that this activity be audited by the Project Quality Assurance Engineer. -,__
S C.
Titles In the following cases, Midland P;oject organizations and personnel have titles differing from those in Bechtel Quality Assurance Topical Report but the responsibilities are the same.
Bechtel Quality Assurance Topical Report Midland Project Title Title Materials, Fabrication and Quality Materials and Quality Services Control Services Department Department Field Construction Manager Project Superintendent Project Construction Quality Control Project Field Quality Control Engineer Engineer Field Contracts Administrator Field Subcontracts Administrator Division Chief Engineer Cognizant Chief Engineer D.
Supplemental Interpretations of Regulatory Guide 1.37 (ANSI N45.2.1-1973)
Section 4 (Pre-Installation cleanliness) of ANSI N45.2.1 states " Items
{
l should not be delivered to the point of installation site sooner than neces-sary unless the installed location is considered a better storage area".
In lieu of this requirement items might, in some cases, be delivered to the in-sta11ation site sooner than necessary at the direction of the Project Field
)
Engineer and will be protected in accordance with Section 5 of ANSI N45.2.1.
E.
Supplemental Alternates and Interpretation of Regulatorv Guide 1.38 (ANSI N45.2.2-1972)
The following alternates and interpretation apply to ANSI N45.2.2:
1)
Section 2.7 Classification of Items.
The listings in paragraph 2.7.1 through 2.7.4 will be used as a guide in determining the categorizing of items under levels A through D for the project.
Categorization dif-fering from Section 2.7 will be considered acceptable provided that no degradation in commodity quality is assured. -
4 4
As in the case of electric motors, exterior pumps, and exterior valves, which are designed for outside service and 'could possibly be stored in areas other than those in which they are designated, i.e. outside service electric motors shown in Level B could possibly be placed in a Level C area.
The same would apply to exterior pumps and valves shown in Level C which could possibly be placed in a Level D area.
In all cases however, the classifications shown in ANSI N45.2.2 will be reviewed and considered by field engineering.
2)
Section 2.7.4 Level D Classification. The last sentence 1st. paragraph is interpreted to read "These items require protection against the elements, airborne contamination, and physical damage as necessary and commensurate with the ultimate use of the item".
This determination is made by Field Engineering in accordance with Project prepared and Project Quality Assurance approved procedures.
3)
Section 6.2.2 Cleanliness and Housekeeping Practices in Storage Areas.
Detrimental soil is defined as material or items which could degrade the stored material.
F.
Supplemental Alternates to Regulatory Guide 1.39 (ANSI N45.2-1973) 1)
Section 2.1 Planning.
The Project will use four cleanliness zones instead of the five zones listed in this paragraph.
These zones will provide the necessary cleanliness and will provide less confusion in'the field.
The requirements of zones I and II in the standard will be included in Zones A and B of the field procedure.
The requirements of Zone III of the standard will be covered by including these items into Zone B or upgrading Zone C for the particular items.
Zone IV will be included in Zone C except the restrictions on tobacco or eating is not required.
.O This zone can be upgraded to include these restrictions for particular items if necessary.
Zone V will be incorporated into Zones C or D as required.
Note:
Zone C provides no restriction except that the areas will be maintained free of detrimental scrap materials and will be swept regularly. Protec-tive coverlags will be utilized in work areas to minimize grease and oil spillage on finished surface.
Zone D areas will be heavy construction areas without cleanliness restrictions and will be upgraded to Zone C when the heavy construction is completed'.
l Restriction List Zones A
B C
D Clothing changes Yes No No No Clean gloves, shoe covers, Yes Yes No No head covering Filtered air Yes No No No Material preeleaning Yes No No No Material accountability Yes Yes No No Personnel accountability Yes Yes No No No use of tobacco or eating Yes Yes No No 2)
Para 2.2 Procedures and Instructions. This paragraph requires procedures for safety and fire regulations.
The Project will use procedures which describe existing National State and Local codes and regulations to control safety and fire.
NFPA is the national fire code followed at the site.
G.
Alternates and Interpretations of Regulatorv Guide 1.54 (ANSI N101.4-1972) b
" Wijcl/)4M b
'ldlJ*
st./
H.
Alternate to Regulatory Guide 1.58 (ANSI N45.2.6-1973)
The Regulatory Guide states that the provisions of ANSI N45.2.6-1973 are " generally applicable.....during fabrication prior to receipt of items
m' at the construction site".
The project will not impose ANSI N45.2.6 on suppliers during fabrication prior to receipt of items at the construction site.
Instead, the following activities are performed to ensure that off-site inspection, examination or testing is performed adequately.
Bechtel procurement documents will require that the supplier's Quality Assurance program provide measures to assure that personnel performing safety-related inspections, examinations and tests are qualified to perform these activities.
Such measures include procedures for qualification of personnel describing the minimum experience, training and proficiency testing required for quali-fication. The measures also include requirements for records documenting qualifications for each of the supplier's inspection, examination, and testing personnel. Personnel qualification procedures will be reviewed by Bechtel prior to initiation of inspections, examinations, or tests.
Also, Bechtel performs surveillance inspection at suppliers facilities by using inspectors, qualified in accordance with ANSI N45.2.6.
Quality Assurance audits are performed on suppliers and additionally, nondestructive examinaticns performed according to the quality requirements of Section III of the ASME Boiler and Pressure Vessel Code are performed by supplier personnel certified to SNT-TC-1A.
I.
Supplemental Alternate to Regulatory Guide 1.64 (ANSI N45.2.ll-1974)
Paragraph C-2, of the Regulatory Guide places restrictions on the use of the supervisor for design verification. As an alternate the following controls will be exercised. Design verification may be performed by the originator's supervisor if the supervisor is the only individual in the project team competent to perform the design verification.
In such cases, an addi-tional review will be performed by either the next higher level of supervision or by off-project personnel. These personnel are qualified in the area of design review and verification.
O r
J.
Alternate to Regulatory Guide 1.88 (ANSI N45.2.9-1974)
Section 5.6 of ANSI N45.2.9 requires that the permanent record storage facility have " structure, doors, frames, and hardware class A fire rated with a recommended four hour minimum rating".
In lieu of this the existing Jobsite record storage facility has a two hour fire rating.
K.
Alternates and Interpretations of Regulatory Guide 1.94 (ANSI N45.2.5-1974)
&t) b
'W LU /LWbNN
"&m " h dt)-
wy 1
II BABCOCK AND WILCOX ALTERNATIVE Appendix A, page A-8 of the B&W Topical Report relative to Regulatory Guide 1.88 reads as follows:
Future Compliance With Standards ANSI N45.2.9 (Draft.11, Rev. 0; January 1973) " Requirements for Collection, Storage, and Maintenance of Quality Assurance Records for Nuclear Power Plants,"
including AEC Regulatory Staff comments and supplementary guidance, Section D of -
e the Gray Book (Guidance on Quality Assurance Requirements During Design and Pro-curement Phase of Nuclear Power Plants, June 7, 1973).
B&W's current system for collecting, storing, and maintaining documents, described in section 6 of this report, is being upgraded to bring it into compliance with ANSI N45.2.9 by April 1975.
In lieu of the preceding, the following commitment will be implemented:
This guide endorses ANSI N45.2.9-1974, " Requirements for Collection, Storage, and Maintenance of Quality Assurance Records for Nuclear Power Plants" for use in compliance with Criterion XVII of Appendix B to 10CFR50. The majority of such records are, of course, the responsibility of the plant owner and this guide should be con-sidered in planning the QA record keeping system.
For those records which are the responsibility of B&W, NPGD's Records Retention Program has been designed to comply with this Regulatory Guide.
III EFFECTIVITY DATES The preceding commitments will be implemented on the following dates for all safety related activities relative to the Midland Project:
A.
For Consumers Power Activities; db
@M B.
For Bechtel Activities; db d
C.
For Babcock and Wilcox Activities; etDb ykt#2Md IM.
The preceding dates do not apply to those instances where the Midland plant l
design, procurement, fabrication or construction would have to be modified to conform to meet the preceding commitments. These instances are defined below.
IV EXCEPTIONS BASED ON THE NEED FOR MODIFICATION OF THE PLANT DESIGN, PROCUREMENT, FABRICATION OR CONSTRUCTION t L, b
b/n$ M ) b
.m NRC F:Ru 195 U.S. NUCLEAR REOULATORY COP ~SSION DOCKET NUM!ER 50 C D 30 G485
""""I'"
NRC DISTRIBUTION FOR PART 50 DOCKET MATERI AL
=
FROM: CONSUMERS POWER CO DATE OF OCCUMEW TQ a
3-29-76
'V,MR R BOYD JACKSON, MICH
^
G S KEELY 4-2-76 OLETTE R ONOTORIZED PROP INPUT FORM NUMBER DF COPIES RECEIVED b' \\ -
OCRiO'NAL OUNCLASSIFIE D jg
+,,, ; qf..
O COPY DESCRIPTION ENCLOSURE LTR RE THEIR 10-13-75 SUBMITTALL.......FURN PROPOSED'OUALITY ASSUR'ANCE PROGRAM OUALITY ASSURANCE REGULATORY GUIDE RESPONSES TRANS THE FOLLOUIMG..
ACKNOWLEDGE.
DO NOT REECT:
Wh(,gd
} \\ (
PLAR NAME:
SAFETY FOR ACTION /INFORMATION ENVIRO IS-E-7 L N !
]
ht ASSIGNED AD :'
MYnon G ASSIGNED AD ;
Nj BRA!TCH CHIEF :
K n g.g L BRANCH CHIEF :
Q ~
PROJECT MANAGER:
Q,gt,oc.,K g,R, PROJECT MANAGER ;
N LIC. ASST. :
S r,,q,9 g c,g, l
LIC. ASST. ;
e I
I INTERNAL DISTRIBUTION i
e I
1[ REG FILE 3 SYSTEMS SAFETY PT. ANT SYRTEMR
~'
F WTon Tren N
NRC PDR HE M RAN TFnEsco ERN5T I
W I&E ScWROEDER BENAROYA BALLARD I
OELD LAINAS SPANGLER - ~~~
t I
COSSICK & STAFF ENGINEERING IPPOL'TO It MIPC MAccAqv SITE TECH CASE KNIGHT OPERATING REACTORS CAMMILL HANAUER SIIMEIL STELLO STEPP RARLESS PAWLICKI HUIRAN OPERATING TECH i
PROJECT MANAGEMENT REACTOR SAFETY EISENHUr SITE ANALYSIS BOYD ROSS S11A0 VOLLMER i
P. COLLINS NOVAK BAER BUNCH l
HOUSTON ROSZTOCZY SCIMENCER J. COLLINS i
PETERSON CHECK GRIMES KREGER I
MELTZ l
bJ llELTEMES AT & I SITE SAFETY & ENVIRC
- W SKOVHOLT SALTZMAN ANALYSIS I
i RUTBERG DENTON & MULLER l
EXTERNAL D!STRIBUTION CONTROL NUMBER N'
LPDR:MihLAnh. MT.
I NATL LAB BROOKHAVEN NATL LAB Q
\\
/
NSIC LA PDR O O 17 ASLB CONSULTANTS 4::d E / '
ACRS HOLDING /SENT