ML19326C746

From kanterella
Jump to navigation Jump to search
Forwards Vols 1 & II of PSAR Per Understandings in Seaborg to Karo.Requests Results of Review Re Seismological Characteristics of Proposed Site Relevant to Evaluation of Site Suitability.W/O Encl
ML19326C746
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 12/07/1967
From: Boyd R
US ATOMIC ENERGY COMMISSION (AEC)
To: Murphy L
COMMERCE, DEPT. OF
References
NUDOCS 8004280680
Download: ML19326C746 (1)


Text

~-

i y

Distribution:

Suppl. i EM DRL Reading RPB-3 Reading Docket No. 50-313 Orig: FWKaras (2)

DEC 7 1967 R. S. Boyd OGC J. F. Newell Mr. Leonard Murphy Chief, Seismology Division U. S. Coast & Geodetic Survey ESSA - Washington Science Center Rockville, Maryland 20852

Dear Mr. Murphy:

In accordance with the understandings which were reflected in Chairmen Seaborg's letter of October 3, 1963 to Admiral Karo, I as forwarding Volumes I and II of the Preliminary. Safety Analysis Report filed by the Arkansas Power & Light Company for the proposed construction and operation of a pressurized water.'uclear reactor at the applicant's site located in the southwest portion of Pope The proposed reactor has been designated as the County, Arkansas.

Rassellville Nuclear Unit.

We would appreciate receiving the results of a review by the Coast and Geodetic Survey concerning seismological characteristics of the proposed nuclear power reactor location which may have a bearing upon our evaluation of the suitability of the proposed site.

Sincerely yours, Originals;gned by Frank W. Karas

'I.a Roger S. Boyd, Assistant Director f

for Reactor Projects Division of Reactor Licensing

Enclosures:

Vols. I and II J

j

..y}Rh:3 Jgl omu>

.y

ff_1RSnoyd- - - - ----- -@ 0 -

ra8 /di......b.i.cGLona_,, l2/ ' [6Z,,,,,,12L Z i6,7,,

O-fPd sum = >

12/5/67 om >

u.m.,Lmu mm,_,,-

"" ^*c-*" $" "a