Responds to NRC 741227 Order for OL Mod & Forwards Revised Tech Specs Re ECCS re-evaluation.Furnishes Addl re-evaluation Info
ML19326C645
Person / Time
Site: Arkansas Nuclear 
Issue date: 07/09/1975
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To: Anthony Giambusso
Office of Nuclear Reactor Regulation
Shared Package
ML19326C646 List:
References
7337, NUDOCS 8004250464
Download: ML19326C645 (5)


Text

n NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)

CONTROL NO:

7337 FILE:

FROM: Arkansas Poer & Light Co. DATE OF DOC DATE REC'D LTR TWX RPT OTHER Little R Ark.

72703 7-9-75 7-10-75 XX TO:' ' ~ ' ~

ORIG CC OTHER SENT!fRC PDR XX Mr. A. Giambusso 1 signed 39 SENT LOCAL PDR XX CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

XXX 40 50-313 DESCRIPTION: Ltr notarized 7-9-75 furn addl ENCLOSURES: include's listing info re Re-Evaluation of ECCS Performance of pages to App A, Tech Specs which are

& trans the following:

revised as a result of re-evaluation of ECCS per forma nc e..... entitled " Single Failure Analysi

( W o d 3 +t}...,

(40 cys ea enc 1 rec'd)

PLANT NAME:

Arkansas Unit 1 FOR ACTION /INFORMATION DHL 7-10 -75 BUTLER (L)

SCHWENCER (L) YlEMANN (L)

REG AN (E)

W/ Copies W/ Copies W[pCopies W/ Copies CLARK (L)

STO LZ (L)

DICKER (E)

LEAR (L)

W/ Copics W/ Copics W/ Copies W/ Copics

.THIS DOCUMENT CONTAINS PARR (L)

VASSALLO (L)

KNIGHTON (E) spins POOR QUAUTY PAGES W/ Copies W/ Copies W/ Copies W/ Copics KNIEL (L)

PURPLE (L)

YOUNGB LOOD (E)

LpH W/ Copies W/ Copies W/ Copies W/ Cupies INTERNAL DISTRIBUTION MG cU 6 TECH REVIEW ~

GRIMES R. DIGGS (L)

B R AITM AN DENTON LIC ASST A/T IN D HG eDR SCHROEDETI GC. ROOM P-50GA MACCARY GAMMILL H. GEARIN (L)

SA LTZMAN iOSSICK/ STAFF KNIGHT KASTNER E. GOULBOURNE (L)

MELTZ

ASE PAWLICKl BALLARD P. KREUTZER (E)

(AMBUSSO JHAO SPANG LE R J. LEE (L)

PLANS OYD VSTELLO M. n10.13Rc0r(L)

MCDONALD MOORE (L)

HOUSTOg ENVIRO S. REED (E) jT2

, - I ##9 A e,:

H APM AN DEYOUNG (L)

$0VAKQ)

MULLEli M. SERVICE (L)

SKOVHOLT (L) wiOSS DICKER S. SHEPPARD (L) kl. COUPE GOLLER (L) (Ltr)

IfPOLITO KNIGHTON M. SLATER (E)

PETERSON P. CO LLINS WFEDESCO YOUNGBLOOD H. SMITH (L)

HARTFIELD (2)

DENISE J.COLLII;S EGAN S. TEETS (L)

KLECKER

,flEG OPR ICAIN AS OJECT LDR G. WILLI AMS (E)

EISENHUT WFILE & REGION (2)

BENAROYA 64s'4 V. WILSON (L)

WIGGINTON MIrc VOLLMER HAR LESS g/1. INGR AM (L)

Yyggf-A M.1)UhCAN (g)

EXTERNAL DISTRIBUTION M -- LOCAL PDR._Russ111ville. Ark.

M - TIC (ABERNATHY) (1)(2)(10) - NATIONAL LABS 1 - PDR-SAN /LA/NY d - NSIC (BUCHANAN) 1 - W. PENNINGTON, Rm E 201 GT 1 - BROOKH AVEN NAT LAB 1 - ASLB 1 - CONSU LTANTS 1 - G. ULRIKSON ORN L y//jACRS

- Newton Anderson NEWM ARK /8LUME/AGB ABI AN l

C LJ 1SENT/,,g, 8004250 f

e 7

I

~~ Aegulato_r) D;chet File

~aLn,~a ou,Lo ARK ANS AS POWER & LIGHT COMPANY STM & LOUIStANA STAEETS LITTLE ACCK. A AK ANSAS 72203.(5011372-4311 July 9, 1975 L R '.l.%

-g

/1

' f.

.f:9.L-K,'...

..,D'

'k \\ j{

f,f?>,

.I

.\\

i.

.m, :, ~/

. / y,). 3 t ! *.

y j~i

~v

\\

~-

f l -'

R,7.

v.

'7 I' C

[I Mr. A. Giambusso, Director i

-' a #1 3

M8-Ni Division of Reactor Licensing

-.c 7 pp.,UJ U. S. Nuclear Regulatory Commissiori s W/

W

^ /?/

N ~ ----. M

. s,/

,M Washington, D. C.

20555 ny g i >

y

Subject:

Arkansas Power 6 Light Company s._ ;_j'J' Arkansas Nuclear One-Unit 1 Docket No. 50-313 License No. DPR-51 Re-Evaluation of ECCS Performance

Dear Mr. Giambusso:

Pursuant to the Commis.lon's Order for Modification of License for Arkansas Nuclear One-Unit 1 dated December 27, 1974, a re-evaluation of ECCS cooling performance calculated in accordance w.ith an acceptable evaluation model which conforms with the provisions of 10 CFR 50, Section 50.46, has been completed and Arkansas Power 6 Light Company is submitting herewith proposed revisions to Appendix A, Technical Specifications for Arkansas Nuclear One-Unit 1.

The prepared revisions are in the attached replacement pages (Attachment 1).

The evaluation model utilized in performing the re-evaluation of ECCS cooling performance is described in Babcock 6 Wilcox (B6W) non-proprietary Topical Report BAW-10104, "B6W's ECCS Evaluation Model".

The results of the evaluation for B6W 177 fuel assembly units with a lowered-loop arrangement are described in Non-Proprietary Topical Report BAW-10103, "ECCS Evaluation of B6W's 177 Fuel Assembly Lowered Loop NSS".

The analysis presented in BAW-10103 for the B6W 177 fuel assembly units with a lowered-loop configuration is generic in nature since the parameters used in this analysis are conservative for Arkansas Nuclear One-Unit 1.

The parameters associated with Arkansas Nuclear One-Unit 1 are bounded by those utilized in the generic analysis, and thus BAW-10103 provides a conservative evaluation of ECCS performance for Arkansas Nuclear One-Unit 1.

The results presented in BAW-10103 demonstrate the conformance of Arkansas Nuclear One-Unit 1 to the criteria of 10 CFR 50, Section 50.46, under the operating conditions specified in the attached proposed Technical Specifications.

.... y AX A AYING, INVESTO A OWNEO MEMOE A MlOOLE SOUTH UTILtTIES SYSTEM

s m

Mr. A. Giambusso July 9, 1975 In addition to the above and in accordance with Mr. D. L. Ziemann's letter of ' June 18, 1975, the following information is also provided:

1.

Break Spectrum and Partial-Loop Operation It has been demonstrated using the FAC guidelines that peak cladding temperatures were significantly lower for partial pump operation than for four (4) reactor coolant pump operation.

The proposed Technical Specification limits for partial pump operation in Attachment 1 are based on minimum shutdown margin and ejected rod worth criteria. An additional analysis using ue FAC guidelines will verify that the minimum shutdown margin and ejected rod worth criteria are still limiting. This analysis will be completed by July 23, 1975.

2.

Potential Boron Precipitation The requested information was provided in Mr. William Cavanaugh's letter of April 21, 1975, in response to Mr. D. L. Ziemann's letter of March 14, 1975.

3.

Single Failure Analysis As requested, a single failure analysis for manually-controlled, electrically-operated ECCS valves has been performed and the results are provided in Attachment 2.

Based on the information provided in Attachment 2, it is con-cluded that no credible single failure or operator error affect-ing any manually-controlled, electrically-operated ECCS valve could significantly adversely affect ECCS performance.

4.

Submerged Valves A review of equipment arrangement to determine if any valve motors within the Reactor Building will become submerged follow-ing a LOCA has been performed and those valves which may be affected are identified in Attachment 3.

This analysis was performed using a conservatively calculated maximum post-LOCA containment water level of 8.75 feet. As shown in the attach-ment, flooding of the valve motors produced no effect on short or long term ECCS functions, save those valves involved in the prevention of boron precipitation. The motors for those valves used for recirculation of borated water to prevent baron preci-pitation are being investigated as to the alternatives avail-able for prevention of inoperability during submergence. The results of this analysis will be provided within 30 days.

Mr. A. Giambusso July 9, 1975 5.

Containment Pressure The containment pressure used to evaluate the performance capa-i

-bility of the ECCS has been calculated in accordance with the methods contained in Section 4.3.6.1 of BAW-10104 and the results are presented in Section 4.4 of BAW-10103.

Also, as requested on Page 7 of the Staff's Safety Evaluation Report which accompanied the Order for Modification of License, i

as-built passive containment heat sink data has been compiled and is given in Attachment 4.

The heat sink imputs to the generic model are conservative com-pared to this as-built data compilation. Using the generic heat sinks, the containment pressure calculation is in accordance

)

with Branch Technical Position CSB 6-1.

We request that the proposed Technical Specifications be expeditiously reviewed. The need for these new specifications is twofold.

First, Mr. K. Go11er's letter to Mr. J. D. Phillips of March 26, 1975, (in response to Unusual Event Report No. 50-313/75-1) requested Technical Specification changes concerning ejected rod worths be submitted at least 45 days prior to control rod interchange (planned for October 1975). Changes to the Technical Specifications concerning this matter are included in this submittal as they also effect the rod withdrawal limits. Second, with current specification limits (i.e. the combined IAC and FAC limits) and the imbalance which we are experiencing in the core, we are unable to operate at 100% power without significant probability of tripping the unit. As a result, the unit has been operating in the 95-98% full power range. The rod withdrawal limits included herein allow more flexibility in control rod operation which will aid in reducing our imbalance.

We feel that this submittal meets all requirements and provisions of 10 CFR 50, Section 50.46. _If you have any questions concerning this information, please contact us.

Very truly yours, l

s.

'J.

D. Phillips

['

Senior Vice President JDP:lt Attachments

STATE OF ARKANSAS

)

)

SS COUNTY OF PULASKI

)

J.

D.~ Phillips, being duly sworn, states that he is a Senior Vice President of Arkansas Power 6 Light Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this Supplementary Information; that he has read all of the statements made and matters set forth therein are true and correct to the best of his knowledge, information and belief.

3

/

!...//.','.<

J. D. Phillips SUBSCRIBED AND SWORN 'ID before me, a Notary Public in and for the CountyandStateabovenamedthisk day of bu

, 197S.

I b.

-4 Notary Public My Commission Expires:

March 1, 1978 i

l l

l l

.. - _