ML19326C607

From kanterella
Jump to navigation Jump to search
Forwards Revision to Proposed Tech Specs Changes Incorporating B&W Proposed Rod Bow Model Into Parameter Mods for Cycle 2 Operation.Proposed Change Allowing Testing of Primary nozzle-to-vessel Welds Prior to 3.5 Yrs Encl
Date released: 12/06/2019 Download: ML19326C607


Proposed Tech Specs Changes Re B&W Proposed Rod Bow Model Incorporation in Parameter Mods for Cycle 2 & Re Earlier Testing of Primary nozzle-to-vessel Welds
ML19326C612
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/13/1977
From:
ARKANSAS POWER & LIGHT CO.
To:
References
Download: ML19326C612 (21)
Forwards Revision to Proposed Tech Specs Changes Incorporating B&W Proposed Rod Bow Model Into Parameter Mods for Cycle 2 Operation.Proposed Change Allowing Testing of Primary nozzle-to-vessel Welds Prior to 3.5 Yrs Encl
ML19326C606
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/13/1977
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To: ZIEMANN D L
Office of Nuclear Reactor Regulation
References
Download: ML19326C606 (3)