ML19326C604
| ML19326C604 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 03/29/1976 |
| From: | Cavanaugh W ARKANSAS POWER & LIGHT CO. |
| To: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19326C599 | List: |
| References | |
| NUDOCS 8004230706 | |
| Download: ML19326C604 (2) | |
Text
w.,.
H..
' (,I c c t 9
- n et.pa n c e UIL O AR<ANSAS
' ' _.)
y y
. A R K A N S A S P O W E R G. L I G H T C O M P A N Y -
March 29, 1976
~..l.7.
53 Mr. G. L. Madsen E
Reactor Construction and Operation Branch y
United States Nuclear Regulatory Commission a
Office of. Inspection and Enforcement Region IV-
~
611 Ryan Plaza Drive,-Suite'1000 Arlington, Texas 76012
Subject:
Arkansas Power S Light Company Arkansas Nuclear One - Unit One-IE Inspection Report No.-50-313/75-15 Gentlemen:
In reply to your letter of March 10, 1976, we are providing the following infomation:
NRC Position We requested that you (AP6L) provide additional information for Infraction 1.B. (IE Inspection Report No. 50-313/75-15).
Specifically, your response does not indicate that documentation is available as evidence that the pre-operational baseline inservice inspection program was conducted.
APSL Resoonse We, the. Arkansas Power and Light Company, do have documentary evidence that.
a preoperational baseline inservice inspection program was performed on Arkansas Nuclear One - Unit One. His documentary evidence is retained at the Arkansas Nuclear One plant site and is available for your (NRC) review.
hRC Positicn Your--(AP5L) response does not address the need for a change to procedure QCP 1004.03 which would clearly allow inspection to be conducted, on your behalf, by subcontractors or vendors.
-APSL Rescense
- Paragraph 3. 2-of QCP -1004.03 has bera changed to read:
.n e Quality Control Engineer (QCE), or his-representative, performs required H
- inspecticas within the plant for both AP6L and contract activities, as necessarf.: Contractor, constructor and vendor groups may perfom quality related ser/ ices, within the plants, provided that the requirements -of QCP 100a.17 _(Onsite Contractor / Constructor / Vendor Centrol) are fulfilled.
Ms.
8004230 7 0
i
' $+ l*l, "l
(
.tr. Madsen March 29, 1976 Page Two
. Tha purpose of QCP 1004.17 is to establish a method for control of onsite n=.'==
contractor's, constructor's and vendor's activities relating to Q-listed systems, structures and components perfomed by outside personnel at the plant site.
g.
If you have further coments or questions, please confer.