ML19326C522

From kanterella
Jump to navigation Jump to search
Forwards Proposed Tech Specs Change Incorporating Parameter Mods for Cycle 2 Operation.W/O Encl.Requests Withholding of Pages 4-6 (Ref 10CFR2.790)
ML19326C522
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 12/01/1976
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To: Ziemann D
Office of Nuclear Reactor Regulation
References
1-126-2, NUDOCS 8004230639
Download: ML19326C522 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ - _

'NiCr$.M 1173. *-

u.S. NUCLE AR fiEGULA 703' MMISSION DOCKET NUMM A v2 7si 50-313 P' RT 50 DOCKET MATERIAL NRC DISTRIBUTION FOR A

TO:

FROM:

DATE OF OOCUMENT Arkansas Potter & Li;;'It Company 12/1/76

'tr. Dennis L. Zienann L.ittle 'soch, Arkansas

{

o47, ggeg,y,o J. D. Phillips 17f qf-q

% ETTER MOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED RiolN AL O U NC LASSIFIE D K

Three Si-;ned 37 cooles enc 1 reevd.

DE SC RIPTIO N ENCLOSURE Ltr. re o'tr 9/13/ 76 ltr....reque s t!n; a.~!t. to ol/chan~.e to tec5 vees:

"i thholdin, nursuan t to 10C"",I.790...

consis tin; of revisions i th rezcrd to "f a t tace<! sunmorting a'fidavit...trans Cvele 2 o era tion...

rACH OWLEDGED the follo in;:

M OTREuoy (1-P)

(90-P)

PLANT NAME: % Denotes "ith Pro 7. material f.A - [

removed-

'.r'a n s a s il SAFET'!

FOR ACTION /INFORMATION vmtTun 12/s/76 9 IT ASSIGNED AD:

ARRTCMFD AD.

HE&HCH CHIEF!

li r' ann

)

RD ANN NTFv

  • r JAQlECT MANAGER; Converse PROJECT MANAGER:

LIC. ASST. :

Dias LIC. ASST. :

l

,N INTERNAL DISTRIBUTION i

pec m w_

)

i SYSTEMS SAFETY PLANT SYSTEMS SITE SAFETY &

gNRC PDR,.

I HEINEMAN TEDESCO ENVIRO AMALYSTS I

x I&E (A/

SCHROEDER BENAROYA DENTON & M117.T.FR YOELD TATNAs VGOSSICK & STAFF ENGINEERING IPPOLITO ENVIRO TECH.

MIPC M.. CARRY KIRKWOOD ERNST CASE KNIGHT BALLARD HANAUER SIHWEIL OPERATING REACTORS SPANGLER HARLESS' PAWLICKI STELLO SITE TECH.

PROJECT MANAGEMENT REACTOR SAFETY OPERATING TECH.

CAMMILL BOYD ROSS

& EISENHUT

(./J;r),. )

STEPP P, COLLINS NOVAK W eMO HULhAN

~

110USTON ROSZTOCZY M d AER PETERSON CHECK Y BUTLER SITE ANALYSIS MELTZ V

HELTEMES AT & I CRIMES VOLLMER BUNCH SKOVHOLT SALTZMAN k

J. COLLINS RUTBERG KRECER EXTERN AL DISTRIBUTION CONTROL NUMBER ylf$PDR:"oaseliei!Ie, i.r <.

NAT. L_AB:

BROOKHAVEtLNAT. TAR _

@ TIC:

REC V.IE

[55fIC:

LA PDR ~

ULRIKSON (ORNL)

{

/2337 ASLB:,

CONSULTA!TrS:

3 URS /(, CYS MOMENG/ 3EtT:# M44_5 g

/

8004'330637 8

~ c. o n o m..."

a 4

H ELPIN G BUILO ARKANSAS ARK ANS AS POWER & LI

.c MPANY STM & LOUISlANA STAEETS AO,

3 NS AS 72203. (5013 371-40C0 50-31g

/

ge erg'lnyr6 1

M h-1-126-2 dd y,h'

  • j g((

u g?\\.

~

Director of Nuclear Reactor R taog*

pkg /)

E' ATTN:

Mr. Dennis L. Ziemann, C I

Operating Reactor Branch'

'4

, y

,/

t U. S. Nuclear Regulatory Commissio til >

h(

I Washington, D. C.

20555

Subject:

Arkansas N nit 1

,[--- - g -

Proposed T

. al Specifications (File:

1511.1)

Gentlemen:

Enclosed please find a proposed change to the Arkansas Nuclear One-Unit.1 Technical Specifications for your review and approval. This proposal was prepared by the Nuclear Power Generation Division of Babcock and Wilcox to incorporate those parameter changes and modifications required for, Cycle 2 operation. The Arkansas Nuclear One-Unit 1, Cycle 2 Reload Report as prepared by Babcock and Wilcox is atfached as suppleme.ntary information.

The proprietary version of Pages 4-5 and 4-6 are-secompanied by the Affidavit of Kenneth E. Suhrke as required by 10 CFR 2.790.

Your letter of September 13, 1976, requested that we propose changes to our Technical Specifications that would implement surveillance requirements to insure that the reactor core internal vent valves are operable. Please find enclosed those changes required to accomplish this objective.

Presently, the first refueling outage for Unit 1 is scheduled to begin January 20, 1977, and continue for approximately 8 weeks. Therefore, we are requesting that this proposal be approved and returned no later than the first week in March in order to allow time for implementation prior to Cycle 2 startup.

If we may be of any further assistance in this regard, please contact us.

Very truly yours,

/

/

l s_

J. D. Phillips, Senior Vice-President JDP:dw 4.w.

m G*"

Attachments

.