ML19326C503

From kanterella
Jump to navigation Jump to search
Forwards Quarterly Status Rept Re Liquid Radwaste Sys Performance in Response to NRC 761202 Ltr
ML19326C503
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/01/1978
From: David Williams
ARKANSAS POWER & LIGHT CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
1-058-1, 1-58-1, NUDOCS 8004230622
Download: ML19326C503 (6)


Text

_. . _ . . _ _ - - _ _ _ _ _ _ _ _ _ _ - .

h $

. a-REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DIGTRIBUTION FOR INCOMING MATERIAL 50-313 REC: REID R W ORG: WILLIAMS D H DOCDATE: 05/01/78 NRC AR PWR & LIGHT DATE RCVD: 05/l$V78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR 1 ENCL 40 FORWARDING SUBJECT FACILITY"S QUARTERLY STATUS REPT ON LIQUID RADWASTE SYSTEM PERFORMANCE, PER NRC LTR DTD 12/02/76.

PLANT NAME: ARKANSAS - UNIT 1 REVIEWER INITIAL: XJM DISTRIBUTOR INITIAL: pq oooooo*********** DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ******************

GENERAL DISTRIDUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.

(DISTRIBUTION CODE AOO1)

FOR ACTION: BR CHIEF Rein **W/7 ENCL INTERNAL: ILE**W/ NRC PDR**W/ ENCL I a u= =w/ 4 tr9LL DELD**LTR ONLY HANAUER**W/ ENCL CHECK **W/ ENCL EISENHUT**W/ ENCL SHAO**W/ ENCL BAER**W/ ENCL BUTLER **W/ ENCL EEB**W/ ENCL J COLLINS **W/ ENCL J. MCGOUGH**W/ ENCL EXTERNAL: LPDR'S RUSSELLVILLE, AR**W/ErlCL TIC **W/ ENCL NSIC**W/ ENCL ACRS CAT B**W/16 ENCL i

l l l l t

^

l@ISTRIBUTION: LTR 40 ENCL 39 CONTROL NBR. l l@IZE: 2P+3P g I loccocoo4*************************** THE END **********************************

8004230 U 2

r

(

(

I f I t li. flI { f 1[

H E L PI N G UUILD ARKANSAS ARK ANS AS POWER S LIGHT COMPANY P O. Box 551 LITTLe AOCK. A AK ANSAS 72203.(5011371-4000 May 1, 1978 1-058-1 O

., E! i-Director of Nuclear Reactor Regulation . f, li'i) 4 ;iG ATTN: Mr. R. W. Reid Operating Reactor Branch #2 qq G Q'y

2.5.- N U. S. Nuclear Regulatory Commission Washington, D. C. 20555 ijNO 3 $$

-m .:=4 x n

Subject:

Arkansas Nuclear One - Unit 1  % @

Docket No. 50-313 p, $

License No. DPR-51 Quarterly Status Report On Liquid Radwaste System Performance (File: 0520.2, 3900)

Gentlemen:

Per Mr. D. L. Ziemann's letter of December 2, 1976, attached find the subject status report. If you have any questions or comments, please contact us.

Very truly yours, s

f- < c Daniel H. Williams Manager, Licensing DHW:REI:ce Attachment  ;

1 l

l I

i f.'. j ;} ^

O\

P

.e. -

5po

..K.. ,~..,~ e. e. _ ~e. (p. -e-ee -,e <e x- e1.L.

f

f. .('

. t Attachments to Letter, Williams to Davis

1. Basic Information
2. Radioactive Waste Shipments
3. Status of ANO-2 Construction

1 ( (

Basic Information The liquid radwaste system performance at Arkansas Nuclear One - Unit 1 may be summarized generally as within and per commitments delineated in Mr. D. L. Ziemann's letter to Mr. J.'D. Phillips of December 2, 1976, l and specifically as noted below:

1

1. The Spent Resin Tank- (T-13) contained approximately 50 cubic feet of resin on 12/31/77.
2. Resins were changed when DF's indicated degraded demineralizer per-formance.

l 3. All three demineralizers were used in series to ensure releases were ALARA.

4. No liquid shipments were made offsite after 10/19/76.

For the 1st quarter of 1978, the total curies released from ANO-1 in liquid effluents (excluding tritium and dissolved gases) was 1.506 curies.

S

. s ,eM : * $ .- , - . -- , , - - - . - - , y

( (

Radioactive Waste Shipments Date ' Quantity Contents Shipper

  • 1-10-78 150 cu. ft. Spent filters NECO 1-31-78 150 cu. ft. Spent filters NECO 2-3-78 768 cu. ft. Trash NECO 3-16-78 150 cu. ft. Resin NE00 3-16-78 50 cu. ft. Resin NECO 3-20-78 150 cu. ft. Resin NECO 3-22-78 1236 cu. ft. Trash & Flander filters NECO 3-22-78 150 cu. ft. Resin & filter NECO 3-24-78 1040 cu. ft. Trash NECO 3-25-78 150 cu. ft. Trash NECO 3-31-78 1032 cu. ft. Trash NECO 4 -78 1062 cu. ft. Trash NECO
  • NEC0= Nuclear Engineering Company e

., - - - ,, .. . , . . . . =,_, %,

( (

.3 ANO-2 Construction Status Construction progress on Arkansas Nuclear One - Unit 2 at the end of the 1st quarter of 1978 was estimated to be 93.5% complete based on manhours expended vs. manhours forecast. Physical construction was approximately 99.25% complete.

l t