Text
_.
h a-REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DIGTRIBUTION FOR INCOMING MATERIAL 50-313 REC: REID R W ORG: WILLIAMS D H DOCDATE: 05/01/78 NRC AR PWR & LIGHT DATE RCVD: 05/l$V78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
LTR 1 ENCL 40 FORWARDING SUBJECT FACILITY"S QUARTERLY STATUS REPT ON LIQUID RADWASTE SYSTEM PERFORMANCE, PER NRC LTR DTD 12/02/76.
PLANT NAME: ARKANSAS - UNIT 1 REVIEWER INITIAL:
XJM DISTRIBUTOR INITIAL: pq oooooo***********
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ******************
GENERAL DISTRIDUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.
(DISTRIBUTION CODE AOO1)
FOR ACTION:
BR CHIEF Rein **W/7 ENCL INTERNAL:
ILE**W/
NRC PDR**W/ ENCL I
a u= =w/ 4 tr9LL DELD**LTR ONLY HANAUER**W/ ENCL CHECK **W/ ENCL EISENHUT**W/ ENCL SHAO**W/ ENCL BAER**W/ ENCL BUTLER **W/ ENCL EEB**W/ ENCL J COLLINS **W/ ENCL J.
MCGOUGH**W/ ENCL EXTERNAL:
LPDR'S RUSSELLVILLE, AR**W/ErlCL TIC **W/ ENCL NSIC**W/ ENCL ACRS CAT B**W/16 ENCL i
l l
t l@ISTRIBUTION:
LTR 40 ENCL 39 CONTROL NBR.
^
l@IZE: 2P+3P g
loccocoo4***************************
THE END 8004230 U 2
r
(
(
li.
flI { f 1[
I f
I t
H E L PI N G UUILD ARKANSAS ARK ANS AS POWER S LIGHT COMPANY P O. Box 551 LITTLe AOCK. A AK ANSAS 72203.(5011371-4000 May 1, 1978 1-058-1 O
E!
i-Director of Nuclear Reactor Regulation f,
li'i) 4
- iG ATTN
Mr. R. W. Reid Operating Reactor Branch #2 qq G
Q'y U. S. Nuclear Regulatory Commission
- 2.5.-
N Washington, D. C.
20555 ijNO 3
.:=4
-mx n
Subject:
Arkansas Nuclear One - Unit 1 Docket No. 50-313 p,
License No. DPR-51 Quarterly Status Report On Liquid Radwaste System Performance (File:
0520.2, 3900)
Gentlemen:
Per Mr. D. L. Ziemann's letter of December 2, 1976, attached find the subject status report.
If you have any questions or comments, please contact us.
Very truly yours, s
f-c Daniel H. Williams Manager, Licensing DHW:REI:ce Attachment l
i f.'. j ;} ^
O\\
P5po (p. -e-ee
-,e
<e x-e1.L..e. -
..K..
,~..,~
- e. e. _ ~e.
f f.
.('
t Attachments to Letter, Williams to Davis 1.
Basic Information 2.
Radioactive Waste Shipments 3.
Status of ANO-2 Construction
1
(
(
Basic Information The liquid radwaste system performance at Arkansas Nuclear One - Unit 1 may be summarized generally as within and per commitments delineated in Mr. D. L. Ziemann's letter to Mr.
J.'D. Phillips of December 2, 1976, l
and specifically as noted below:
1 1.
The Spent Resin Tank- (T-13) contained approximately 50 cubic feet of resin on 12/31/77.
2.
Resins were changed when DF's indicated degraded demineralizer per-formance.
l 3.
All three demineralizers were used in series to ensure releases were ALARA.
4.
No liquid shipments were made offsite after 10/19/76.
For the 1st quarter of 1978, the total curies released from ANO-1 in liquid effluents (excluding tritium and dissolved gases) was 1.506 curies.
S
. s,eM :
y
(
(
Radioactive Waste Shipments Date
' Quantity Contents Shipper
- 1-10-78 150 cu. ft.
Spent filters NECO 1-31-78 150 cu. ft.
Spent filters NECO 2-3-78 768 cu. ft.
Trash NECO 3-16-78 150 cu. ft.
Resin NE00 3-16-78 50 cu. ft.
Resin NECO 3-20-78 150 cu. ft.
Resin NECO 3-22-78 1236 cu. ft.
Trash & Flander filters NECO 3-22-78 150 cu. ft.
Resin & filter NECO 3-24-78 1040 cu. ft.
Trash NECO 3-25-78 150 cu. ft.
Trash NECO 3-31-78 1032 cu. ft.
Trash NECO 4 -78 1062 cu. ft.
Trash NECO
- NEC0= Nuclear Engineering Company e
,,...,.... =,_, %,
(
(
.3 ANO-2 Construction Status Construction progress on Arkansas Nuclear One - Unit 2 at the end of the 1st quarter of 1978 was estimated to be 93.5% complete based on manhours expended vs. manhours forecast.
Physical construction was approximately 99.25% complete.