ML19326C456

From kanterella
Jump to navigation Jump to search
Forwards Bechtel Power Corp Rept Entitled, Containment Tendon Surveillance Lift-Off Acceptance Criteria, Test Procedure for Wire Specimens,Mill Test Rept for Tendon & Util Response to NRC 771223 Request for Tendon Info
Date released: 12/06/2019 Download: ML19326C456


Mill Test Rept for Tendon 32H14, Prepared by Suzuki Metal Industry Co
ML19326C471
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/06/1972
From:
AFFILIATION NOT ASSIGNED
To:
References
Download: ML19326C471 (30)
Procedure for Testing of 100 Inch Gage Length Wire Specimens.
ML19326C468
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/04/1978
From:
ARKANSAS POWER & LIGHT CO.
To:
References
Download: ML19326C468 (4)
Containment Tendon Surveillance Lift-Off Acceptance Criteria.
ML19326C463
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 02/28/1978
From: Johnson T
BECHTEL GROUP, INC.
To:
References
Download: ML19326C463 (33)
Forwards Bechtel Power Corp Rept Entitled, Containment Tendon Surveillance Lift-Off Acceptance Criteria, Test Procedure for Wire Specimens,Mill Test Rept for Tendon & Util Response to NRC 771223 Request for Tendon Info
ML19326C455
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/04/1978
From: David Williams
ARKANSAS POWER & LIGHT CO.
To: REID R W
Office of Nuclear Reactor Regulation
References
Download: ML19326C455 (2)