Requests Extension to 740101 of Latest Completion Date for CPPR-57.cites Late Delivery of Valves,Mod of Reactor Vessel, Problems W/Containment Tendon Stressing Sys & ECCS Mods
ML19326C437
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/14/1973
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8004230566
Download: ML19326C437 (4)


Text

-,

- - - - - -- - - - - - - - - - - - - - - - -AEC DISTRIBUTION FOR PART 50 DOC %ET MATERIAL- ----- - ---- - -

p r v u y, ;

T (EMPORARY FORX)

CONTROL NO: 1809.

77g TROM:

DA G OF DOC:

DAS REC'D LTR iGMO RP; W.-2.a Ark:nsas Power & Light Company Little Rock, Arkansas 72203 ~

3-14-73 3-19-73'.

J. D. Phillips x

20:

X 3

A. Giambusso

signed 37 A

X l

CIASS:

@ 0P INFO INPUT NO CYS REC'D DOCE2 IiO:

/

40 50-313 8

DESCRIPTION:

ENCLOSURES:

Ltr notarized 3-14-73 requesting extension of Latest Completion Date for Const. Permit.

~

CPPR-5 7 f rom' July 1,.1973 to ' Janua ry_ l, 1974 00N0N.iMO

()

oA PLAh? NA m a; Arkansas Nuclear One, Unit #.1 FOR ACTIOM/I.UORFATION 3-19-/3m fod BUTLER (L) p'$CHWENCER(L)

ZIEMANN(L)

YOUNGELCOD(E)

W/ Copies W/ 3 Copies W/ Copies W/ Copies CLARK (L)

STOLZ(L)

ROUSE (FM)

REGAN(E)

W/ Copies W/ Copies W/ Copies' W/ Copies GOLLER(L)

VASSALLO(L)

. DICKER (E; W/ Copics W/ Ccpies W/ Copies W/ Copies

'KNIEL(L)

SCEDSL(L)

KNI.GHTON(E)

'W/ Copies W/ Copien W/ Copies W/ Copies j

INTERNAL DISTRIBUTION h FIL O

"'ECH RE7IEW DENTON F&M WADE E

pAEG YDR.

dENDRIE GRIMES SMILEY BROWN E

OGC, ROOM P-506A SCHROEDER

'GA!OIILL NUSSBAUMER G. WILLIAMS E MUNTZING/ STAFF MACCARY KASTHER SHEPPARD E

CASE KNIGHT (2)

BALLARD LIC ASST.

GIAMBUSSO PAWLICKI SPANGLER SERVICE L

A/T IND BOYD SHA0 WIISON L

BRAITMAN V. MOORE-L(BWR)

STELID ENVIRO M OULBOURNE L SALTZMAN a,DEYOUNG-L(PWR)

HOUSTON MULLER SMITH L

SKOVHOLT-L NOVACK DICKER GEARIN L

PLANS '

~

P. COLLINS ROSS KNIGIff0N-DIGGS L

' MCDONALD IPPOLITO YOUNGBLOOD TEETS L

. OlTHE REO OPR TEDESCO REGAN LEE L

ffILE & REGION (2)

IDNG PROJ LEADER MAIGREP L

INFO MORFIS LAINAS SHAFER F&M C. MILES 8004s30 N. 'h STEELE BENAROYA HARLESS VOLLMER g f NcmT. 'A 3PoTmTr'70N

~

F d-IDCAL ' PDR Cardanelle, Ark.

1-DTIE( ABERNATHY)

(1)(2)(9)-NATIONAL IAB'S 1-PDR-SAN /LA/NY 1-NSIC(BUCHANAN) 1-R. CARROLL 'C, GT-B227 1-GERALD LILILUCEE l-ASLB-YORE /SAYRE 1-R. CATLIN,E-250-GT' BROChTAVEN NAT. LAB WOODWARD /H ST.

1-CONSULTANT'S 1-AG:ED(WALTER KCETER

,,A.6-CYS ACRS nuras Sent 3-19-73 to NE'nNARK/BLUME/AGABIAN RM C. !+27, GT)

E. Goulbourne to 1-GERLAD ULRIKSON....ORNL l-RD...MlTELER...F-307

.DLst..

~

M H ELPIN G BL/lLO ARKANSAS RK ANS AS POWER & LIGHT COMPANY Cy.

OTH & LoulS,AN A STnEeTS. LITTLe AoCK. A AK ANSAS 72203.(5013372-4311 March 14, 1973 g\\g$N i r3 U

1 i'

6; g

yz g i j;;

p m,

9.. ~ q, y

o.py

<m i.

gN y

Mr. A. Giambusso

\\' /

N' Deputy Director of Reactor Licensing al i@

Directorate of Licensing United States Atomic Energy Commission Washington, D. C.

20545

Subject:

Arkansas Power & Light Company Arkansas Nuclear One-Unit 1 Docket No. 50-313 Provisional Construction Permit No. CPPR-57 Application for Renewal of Construction Pennit

Dear Mr. Giambusso:

Arkansas Power & Light Company hereby applies for an extension of time for completion of Arkansas Nuclear One-Unit 1, as covered by Provisional Construction Permit No. CPPR-57.

The original Provisional Construction Permit has July 1,1972, as the latest date of completion of the facility.

In June 1972, Arkansas Power

& Light Company submitted a request for an extension of time for comple-tion of Unit 1 until July 1,1973, and on June 14, 1972, the Comission granted this request.

Unit 1 has been further delayed due to the following factors:

1.

Late Delivery of Valves - The completion of a number of critical path systems has been delayed because of the late delivery of valves.

The absence of these valves prevents the construction turnover of the systems and the sutJ.couent preoperational testing.

2.

Modification of Reactor Vessel and Internals - The reactor vessel and internals were modified due to vibration problems experienced during the hot functional testing of Oconee 1.

The major portion of this modification work was done in the 1809 h,oemeene,ooLeeaur-ur,L,rieseverem ru Av,~o.,~veeren ow~ o

w e

Mr. A. Giambusso March 14, 1973 reactor building and thereby caused a major impact on the critical path of the reactor vessel as well other work required to be done in the reactor building.

3.

Problems with Containment Tendon Stressing Systems - The tendon system stressing jack failed during site stressing operations and as a result the jack was redesigned and put through an extensive shop and field testing program prior to resuming field stressing operations.

This caused a signifi-cant delay in the critical path schedule of this structure.

4.

Modification of the Emergency Core Cooling System - In order to improve the performance of the ECCS after a break in the core flood line, venturi inserts are being installed in the core flooding line nozzles. The installation of these ven-turis has caused additional delay in the critical path sche-dule for the reactor vessel.

The above problems have been the major factors in delaying the Unit 1 fuel load.

Some of the above problems caused delays as much as six months by themselves.

Other problems of a lesser magnitude have caused delays but these have paralleled those described above.

The overall result of the delays described represents a shift in fuel loading of seven (7) months from April 1973, to November 1973.

Arkansas Power & Light Company hereby requests that the latest date of the completion of the facility specified in Provisional Construction Permit No. CPPR-57 be extended from July 1,1973, to January 1,1974.

Very truly yours, i

y

,~ lc q g

',c

- J. D. Phillips Vice President and Chief Engineer JDP:lt

9 STATE OF ARKANSAS SS COUNTY OF PULASKI J. D. Phillips, being duly sworn, states that he is a Vice President of Arkansas Power & Light Company; that he is authorized on the part of said Company to sign and file with the Atomic Energy Commission this Application for Renewal of Construction Permit; that he has read all of the statements contained in such application and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, infomation and belief.