ML19326C423
| ML19326C423 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 02/04/1969 |
| From: | Phillips J ARKANSAS POWER & LIGHT CO. |
| To: | Morris P US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8004230553 | |
| Download: ML19326C423 (1) | |
Text
1
~s
302'A 8
~
t
~
3,,,
3
.s y
s s s s
v.ww.w-- -
t
.I m c.& 1 z w.v %n o4TE Or - wT:
Arkansas Power 4 Light Co*
o4TE RECErvE 2-4-69 2-7-49 Pine Bluff, Arkannes u R.
m:
RErOR T:
(J.11. Phillips) x 4
yo:
ORIG.:
CC:
OTHER:
1 ACTICN NECESSARY O
CoNCuaRzwCs O
o^Te aas*5ars:
NO ACTION NECESSARY O CCu= ext O
av:
GLA SS ly.:
POST OFFICE FILE CCOE:
U D00CI: 50-313
/,j j.4.,
t,ESCRIPTION: l Must $g ung bs sied )
REFERRED TO DATE I
RECE!VED BY DATE Ltr. responding to our 1-4-69 itr. re the Liner Anchora8e Test Program.....
gon,,
2.go
~
w/8 cys. -- FCR INN /ACIION ENctosuREs i
Info Contes tot Dr. Beck Cromerick (2)
II. Price & SI:aff 1-Dr. liorris/Schroec'ler
- b D. Thomosen Boyd w,
1:,,
y
'maa u:
Distributions Q -reg. file copy)
.,MU 1-AEC PDR 2-cGy lim o..
(postmarked 2p69) u.s. ATouic esency couuiss' "
lc........-..,....,....,m,i.........
hWL CONEM mM r-m..>-=
i..
8004230 f63 g
~
- e. vo
~s v
~
H ELPIN G BUILO ARKANSAS ARK ANS AS POWER & LIGHT COMPANY SIXTH AVENUE ANQ AINE STREET e PINE BLUFF, AAKANSAS 71601 e (5013 JE 4-1330 CE amasc February 4, 1969 Mr. Peter A. Morris, Director Division of Reactor Licensing United S tates Atomic Energy Commission Washington, D. C. 20545 Arkansas Nuclear One Docket Number 50-313 Liner Anchoraee Test Program
Dear Mr. Morris:
This is in response to your letter to me dated January 4, 1969, discussing the Liner Anchorage Test Program.
The Test Program consists of 14 tests - six tes ts with 4-12 weld in tension, six tes ts with 6-12 weld in tension and two tes ts with 4-12 weld in compression.
Bechtel's prediction is that the results of the tension and compression tests will be practically identical; however, even if this is not the case, they will be able to extrapolate a 6-12 weld cem-l pression test restit from the relationship cf the 4-12 compression, 4-12 tension and 6-12 tension tes ts.
These tests are now in the process of being performed.
Yours very truly,
,L J. D. PHILLIPS Vice President & Chief Engineer JDP:mr
'd ag,
,00<
aur ur,cir..
vereo rAx-Av,..,~v.oro ow~.0