ML19326C294

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Wire Hoop Tendon 32H14 Min Tensile Strength Testing Below Tech Spec Requirement. Engineering Evaluation in Progress to Determine If Abnormal Degradation of Primary Containment Exists.Rept by 771101
ML19326C294
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/24/1977
From: Rueter D
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
1-087-6, 1-87-6, NUDOCS 8004220851
Download: ML19326C294 (3)


Text

-[.?

i.

N..

4 Q.

I

~

i I

DISTRIBUTION AFTER ISSUANCE OF OPERATING LICENSE NRCPopM 196 G

u.s. NUCLEAR REQubAToRY CoM" "SiO 8 oo Nu 8 l

.NRC DISTRIBUTION ron PART 50 DOCKET MATERIAL TO:

FROM:

oArm or occuusmr gg

r. E. Monis Howad 03/2 M 7 Little Rock, Arkansas 72203 cars macsiven Donald A. Rueter n a r, s !~,

m Omoronizeo Pao

  • imeurponM muusen or copias nacsivso guacLAssireso mionaA6

/

jerg gg copy V

casemirrion Consists of Tendon Surveillance ENCLOSURE interim Report... Furnishing infomation on tendon wire tested for tensil strength...

IHIS DOCUMENT CONTARIS 2"

P0OR QUALITY PAGES PLANT NAME: ARKANSAS UNIT # 1 Jcm 09/16/77 I

S AFET"

/"\\

FCR ACTION /INFORMATION l

9 RANCH i'9IEF? (7)

A 23t/LK l

I I

A INTERNAL OlSTRIBUT10N FREG' FILE }

s_

ICE (2) e OELD HANAUER CHECK STELLO i

EISENHUT SHA0 BAER BUTLER GRIMES J. CO LLL'45 EXTERNAL @ST RIBUTION CONTROL NUM BE R

._;PDR! M rJ C C f M V110 MPK

-WCYS ACRS SEW CATECOFY Ng IC l

H u-i w

8004220 J

I.'

  • gQ d,

l 'f~ : *.,..

.z s..

a

. p.,

q;

..d Ew me H E L PIN G BUILD ARMAN8AB J

A AK ANS AS POWE A G LIGHT COMPANY PO. Box set L...L. AOCM. ARu aNS.

7 220 3. t.01' 3 71 - 4000 August 24, 1977

<C-

e..Mll'if 1-087-6

??.

 % 7977 c T.';?.?qecq q:

Mr. E. Morris Howard, Director Office o' Inspection & Enforcement

.c z Region IV s*

I

-cN, p?

U. S. Nuclear Regulatory Comission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Subject:

Arkansas Nuclear One-Unit 1 i

Docket No. 50-313 License No. DPR-51 Tendon Surveillance Report File: 0520.2 Gent moen:

Pursuant to Arkansas Nuclear One-Unit 1 Technical Specification 6.12.4, we are submitting ice following infomation concerning the subject report.

As required, one tendon wire from each of the three tendon families (dome, vertical and loop) was tested for tensile strength. The tensile strength for two of the three samples taken from a wire in hoop tendon 32H14 fell below the required minimum tensile strength of 240 ksi. A fourth sample was taken from the same wire and tested. The results were also below the minimum tensile strength. The highest tensile strength recorded for these tests was 246 ksi and the lowest value recorded was 229 ksi. These four tests were done on May 24 and 25,1977, using 100-inch samples in accord-ance with Section 7.3 of Operating Procedure 1304.91 At this time, a total of 46 hoop tendons have been identified as having the same heat of material as tendon 32H14. An engineering evaluation is in pmgress to detemine if this decrease in tensile strength constitutes abnomal degradation of the primary containment.

Therefore, we rw submit this interim report on Tendon Surveillance and

'I i

t i

l l

4....._.._,-.L...........

s

.......~...~....O.

_.O i

. ~..

n) 3 o

  • a

)

g Mr. E. Morris Howard August 24, 1977 propose to submit a final report no later than November 1,1977.

Ver tr

ours, m

Donald A. Rueter Manager, Licensing DAR:DGM:aw l

)

L'

- ~ - ~ ~.-.. _. _

"^W w

A=L

~ - -

_