ML19326C254
| ML19326C254 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 02/11/1976 |
| From: | Phillips J ARKANSAS POWER & LIGHT CO. |
| To: | Ziemann D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19326C256 | List: |
| References | |
| 1498, NUDOCS 8004220824 | |
| Download: ML19326C254 (3) | |
Text
l NHC roam19'i U S. I4UCLLAR REGULATORY COMMISSION DOCKET NUM DE R 5
s% W 50-313 j
NRC DISTRIBUTION FoR PART 50 DOCKET MATERI AL TO:
NRC FROM:
Arkansas Pever & Light Co.
DATE OF DOCUMENT D.L. Ziemann Little Rock, Arx..
72203 2-11-76 J.D. Phillips 04TE RECEivEo 2-17-76
)OLETTER ONOTORIZED PROP If4PUT FORM NUMBER OF COPIES RECEIVED jOOR IGIN AL XbC LASW lE o OCorv 40 DESCRIPTION Ltr re our 12-17-75 ler....trans EN CLOSU R E KK Revised & addl pages to Amde to the following:
10-1-75 submittal of Arkansas Power & Light Co./ Tech Specs in re to hydraulic shock suppressor......
THIS DOCUMENT' CONTAINS I'
- 7* *" l "** d)
POOR QUALITY PAGES y-
~
-s
-,..e.,.o. 2, PLAlir NAM 2:
Arkansas #1 S AFF.TY FOR ACTION /INFORMATION ENVIRO DHL 2-18-76 i ASSIGNED AD :
ASSIGNED AD -
[
IBANCH CHTff_:
1 [gggggn (f)
ERANCII CliIEF e ROJECT !!ANAGER:
ggge ' '
PROJECT J!ANAGER :
C. ART. :
Agg LIC. ASST. :
~
INTERN AL DibiRIBUTION
[IbC SYSTEMS _Sf[ETY
_FtANT <:vsTEMs em7Tso Trem
_lf; te aw IIEINDMN TFngnco ERNST y
I&E fa)
SCHRognen BENAROYA BALMED
/ DELD LAINAS SPANGLER
/
COSSICK & STAFF E_NQIEE13ING IPPOLITO I
__ _MIFC JMCCARY SITE TECH CASE KNIGHT OPERATING REACTORS CAMILL JI/dQ1]gn SIJNEIL STELLO STZi>P
}MRLESG.
PN1LICRI HULMAN OPERATING TECH PROJECT !!ANAGEMENT REACTOR SAFETY
/
EISENHUT SITE ANALYSIS BOYD ROSS gfl SIRO VOLIFER P. COM INS NOVAK
- 4 BAER EUNCE UGUSTON ROSZTCCZY
/' SCII'1ENCER J. COLLINS PETERSON CHECK
/
GRIMES KREGER 11ELTZ llELTE!!ES AT & I SITE SAFETY & ENVIRf SKOVHOLT SALTZMAN ANALYSIS RUIRERG DFNTO'i & M1TLT.ER EXTERNAL DISTRIBUTION CONTROL NUf.iBER f'__L1lg: Russellville, Ark.j\\TL I_\\n
_j
~'~15R0_0Kl@W'jN NATL Ll.B
/
AST,n CONSULTANTS oaus mewpp u.
N n C, 0,m m a.*
800Aa20?EV j C
~
m Regulai.ory Dcchet $4 r
H ELPI N G BUILO A F9 K A N S A S A AK ANS AS POWER d LIGHT COMPANY SrH & LOUISIAN A Sr A..T3. LITrL ACCK. A AKANSAS 72203. [501) 371-40C0 February 11, 10~
etIi 8/
\\
A gD
\\ A \\
Eg p
c) i A
$ ?.$373
,. f 0
Director of Nuclear Reactor Regulation g (Q
-O ATTN:
Mr. D. L. Ziemann, Chief
- %c4 ph C-
- /
Operating Reactor Branch #2 fg/
2 g
U. S. Nuclear Regulatory Commission 4
g Washington, D. C.
20555 1
D Subj ect: Arkansas Power 6 Light Company Arkansas Nuclear One-Unit 1 Mg @
N Docket No. 50-313 License No. DPR-51 Hydraulic Shock Suppressor Technical Specification Gentlemen:
Your letter of December 17, 1975, requested an amendment to our October 1, 1975, application for license amendment to reflect your revised model technical specification.
The attached revised pages 66c,110e and 110f reflect the changes that we feel are appropriate. We have:
1.
Added provisions for installing additional safety related snubbers without prior NRC approval (3.13.3)
{
2.
Deleted the requirement for periodic disassembly and inspection
' j of snubbers
\\
We have not amended our Table 3.13-1 because our bases state:
"If the categorization option of 4.16.1.1 is used all hydraulic shock suppressors in the reactor building shall be considered inaccessible and all others shall be categorized based on radia-tion levels, ambient conditions and other occupational hazards."
The categori:ation of reactor building snubbers as inaccessible is due to consistant radiation, temperature, and humidity levels experienced in the ANO-1 reactor building. Conditions near the other snubbers are subject to change and it should be possible to recategorize those snubbers based on the changing conditions instead of locking their category into a Technical Specification table.
I 1488
(,uu.Au,0cLesour-ur,uriesevereu rA x A A.,~ o.,~ veerc A a w ~ 0
3 Mr. D.-L. Ziemann February 11, 1976 Our October 1,1975, submittal already included wording requiring that the Lvisual inspection of snubbers should include the fluid reservoir, fluid-connections, and any linkage connections to associated piping and anchors.
The rest of our October 1,1975, submittal still stands.
Very truly yours,.
tl !
- r. '
J. D. Phillips Senior Vice President
.JDP:tw i
m 5
l i
,