ML19326C060
| ML19326C060 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 06/07/1976 |
| From: | Phillips J ARKANSAS POWER & LIGHT CO. |
| To: | Howard E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19326C061 | List: |
| References | |
| NUDOCS 8004180735 | |
| Download: ML19326C060 (1) | |
Text
W 9
gg H E L P I N F1 f t lJ i L O A F1 K A N LI A f%
t._. m b ARK ANS AS POWER G LIGHT COMPANY OTH & LOUIStAN A GT84EETS. LITTI.E AOCK. AnKANS AG 7D203. (5013 3714000 June 7, 1976 k.
/\\
c') '
7.;;-)
f\\
.. Q
..}!
q, y+'.
3 3
$f4 (W,k i ]'?
D>
Mr. E. Morris lioward, Director
,5 7
Office of Inspection G Enforcement
-?
s Region IV 9,\\
U. S. Nuclear Regulatory Commission
/g$
611 Ryan Pla::a Drive, Suite 1000 gg'</
Arlington, Texas 76012
Subject:
Arkansas Power 6 Light Company Arkansas Nuclear One-Unit 1 Docket No. 50-313 License No. DPR-51 Reportable Occurrence No. 50-313/76-8 s
\\
Dear Sir:
'On May 11, 1976, during checks preparatory to the integrated Engineered Safeguards -(E.S.) test, Diesel Generator No.1 failed to start upon actuation of E.S. relays. Attached find our report concerning this occurrence in accordance with Technical Specification 6.12.2.3.
Very truly yours, 9 f.t.v' !.
(d.D.Phillips' :!,k ' g,g4 Senior Vice President JDP:ay Attachment cc:
Mr. E. Volgenau, Director Office of Inspection 4 Enforcement (f. S. Nucicar Regulatory Commission Washington, D. C.
20555 58.E Mr. W. D. MacDonald, Director Office of Management Information
\\
and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.
20555 COPY SENT REGIO ad s
,g..
T A M 51 A v e' Nit. IN V F 9 f Din MWN E f1 I,
MCMHEf4 MIDOLE SatiT6f UTILITscG n *G TCM 9