ML19326C030
| ML19326C030 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 06/09/1976 |
| From: | Phillips J ARKANSAS POWER & LIGHT CO. |
| To: | Howard E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19326C031 | List: |
| References | |
| NUDOCS 8004180713 | |
| Download: ML19326C030 (1) | |
Text
. f..
~
f
\\
el E L fB I ?! G e l of I L l)
A FI is A II e
\\
I V
A RK ANS AS POWER G LIGHT COMPANY 97H G LOUISt AN A STREETS. LITTLE AOCK. da AK ANSAS 72203.(5011372-4311 l
June 9,1976
{
i h!r. E. Sforris lioward, Director U. S. Nuclear Regulatory Commission l
Region IV, Suite 1000 611 Ryan Plaza Drive Arlington, Texas 76012 Subj ect: Arkansas Power S Ligl._ Company Arkansas Nuclear One-Unit 1 l
Docket No. 50-313
)
License No. DPR-51 j
Reportable Occurrence 50-313/76-9 1
Gentlemen:
- ~ Cs%)
In accordance with Technical Specificatf.on 6.12.3.2 we have attached a i
report of Reportable Occurrence 50-313/76-9 concerning certain equip-ment failing to respond properly to a simulated E.S. signal during the refueling period testing.
Very truly yours, j
(
,,2 9 J.' D. Phillips Senior vice President
.JDP:tw cc: !!r.
- t. Volgenau, Director Office of Inspection 6 Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 tir. N. D. BlacDonald, Director Office of hianagement Information and Program Control f3f)O3 U. S. Nuclear Regulatory Commission Washington, D. C.
20555 m
(v) 800418071) l lV GUPY SENT REGION N T A X P AYING. INVESTOR OWNEO MEMBE A MICOLE SOUTH UTILITIES SYSTEM
.