ML19326B856

From kanterella
Jump to navigation Jump to search
Forwards RO 50-313/76-23
ML19326B856
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/17/1976
From: Rueter D
ARKANSAS POWER & LIGHT CO.
To: Howard E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19326B857 List:
References
NUDOCS 8004180593
Download: ML19326B856 (1)


Text

._

  • 7 s,'#w IEFILE COT M dLPIN G BUILO ARKANSAS ARK ANS AS POWER & LIGHT COMPANY 91- & outs.AN A S AEETe. UrTLE ROCK. A AK ANS AS 722Q3. (5013 372-4311 September 17, 1976

.;g Z

Mr. E. Morris Howard, Director j '[ft : ~

Office of Inspection 6 Enforcement

[b-3 D

)_'9) 3

'A U

N lear Regul tory Commission p

c 611 Ryan Plaza Drive, Suite 1000

\\'

_R S%;~i"'~~*..;

"J W Arlington, Texas 76012 x,,

//

Subject:

Arkansas Power 6 Light Company

~

Arkansas Nuclear One-Unit 1 Docket No. 50-313 License No. DPR-51 Reportable Occurrence Report No. 50-313/76-23 Gentlemen:

In accordance with Technical Specification 6.12.3.2 we have attached the subject report concerning our failure to comply with the surveil-lance test schedule.

Very truly yours, Donald A. Rueter Manager, Licensing DAR:DGM:ay Attachment ec: Mr. W. D. MacDonald, Director Office of Management Information I

and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.

20555 COPY SENT REGIO L / __,

[

Mr. E. Volgenau, Director Office of Inspection 6 Enforcement O

U. S. Nuclear Regulatory Commission

\\

Washington, D. C.

20555 M

b 30o418059 g,.....-,oo<ecoT-ur.ur,eeeere-r_

..,~o.,~

..ro.o.~.o

f}

'Q 1.

Reportabic Occurrence Report flo. 50-313/76-23

[

2.

Report Date: September 20, 1976 3.

Occurrence Date: August 23, 1976 4.

Facility:

Arkansas Nuclear One-Unit 1 Russellville, Arkansas 5.

Identification of Occurrence:

Failure to comply with surveillance test schedule.

h 6.

Conditions Prior to Occurrence:

Steady-State Powcr Reactor Power 0

Wth llot Standby Not Output 0

Wo l

l Cold Shutdown X

Percent of Full Power 0

's i

Refueling Shutdown I.oad Changes During Routinc

~

Power Operation i

Routine Startup i_ Q Operation

~ Routine Shutdown Operation l

Other (specify) 7.

Description of Occurrenec:

On August 23, 1976, during the review of surveillance test, it was found l

that the following tests were not conducted at the required surveillance interval.

'i'!

1.

Offsite power protective relaying interlocks and circuit I

weekly test scheduled for 1/30/76 and 2/13/76 were conduct

,)

I on 2/4/76 and 2/10/76. The test sheeduled for 7/2/76 was not conducted. The weekly test also had not been conducted prior to criticality on 1/18/76, 6/19/76 and 6/28/76.

iOU Attachuent "C"

!! arch 23,1976 NSP-10,'Rev. 4 Page 2 of 4 l

I

  • 7.

Description of Occurrence:

(continued) 2.

Diesel Generator protective relaying, starting interlocks and circuitry monthly test scheduled for 1/23/76, 2/20/76 and 3/19/76 were conducted on 2/4/76, 2/10/76 and 3/4/76.

Also, a monthly test had not been conducted prior to criticality on 6/19/76 and 6/28/75.

3s Station batteries and switchyard batteries quarterly tests were not conducted prior to heat up above 200F on 6/19/76 and 6/28/76.

1 1

4 1

l e-e O

.___._,.-,_,7,

.c...

_m,r,,

-)

j Reportable occurrence neport No.

50-313/76.23 1

8.

Designation of Apparent Cause or Occurrence:

[

Design Proceduro Manufacture Unusual Service Condition Including Environmental Installation /

Construction Component Failure i

Operator Other (specify)

X Failure of the individual responsible for these tests to recognize the technical specification requirements.

9.

Analysis of Occurrence:

Surveillance tests have been satisfactorily completed since these occurrences thus there was no hazard to the health and safety of the public.

i Attachment "C" March 23,1976 NSP-10, Rov. 4 Page 3 of 4 3

4S=fQ "PW.p, t ens -,.

I p-

~

Reportable Occurrence Peeport ilo. 50-313/76-23

10. Corrective Action:

The occurrences and the technical specification requirements have been discussed in detail with the individual. responsible for the surveillance test implementation.

l 1

11.

Failure Data:

Similar Reports:

76 The pilot cell voltage readings for station batteries were not taken 76 Failure to perform surveillance test on Control Room emergency ventilation system at the required frequency 1

)

I W

Attachment "C" March 23,1976 NSP-10, Rev. 4 Page 4 of 4

- _ ~

~

^

UCENSEE EVENT REPORT CONTROL SLOCx:l l

l l

l l

I camass==r au. nsouman neonmanom 1

6 (s jl l AIR l4lXINI 11 LCENSE NUMSER PE l o lol-l olol ol oldi-lo lo l f41/ l l I i l 11 141,31 7 89 14 15 25 28 30 31 32 A1C DOCxtT NUMBER EVENT DATE REPORT CATE CATEGORY TYPE O 1 CONT l l

l

[L_j lLl lClgl Cl-l d l3 l f l3 l lOl$l2l3l7l6l l Ol 9 l2l ol 7lf l 7 8 57 58 59 GO 61 68 69 74 75 80 EVENT DEScalPTION 08 IDunina cosa sne r nemow FArAumas 76 edMPLV 1D/12 ' 4WMVfle,4 ANCf T6ff se M FD*i 7 89 80 h IULff 199t'2 *l L2MmW Ede Ars _ Td2d noCLu d A FB*T1*rW 9h2ME 9tATEt *F"!VG" RELA Ff AND 7 89 80

$$ ILAents uMCML1

  • 1~d27*. spCggL efMfJtn9ar2 row r a u r v Vmf 22"LA Vf AM2 sM=rer"X Loc Ae:r AJ&WMt.

7 89 80 SU 19797*. AM2

_vne= rwa ndivwMrst Adh

n. nerred sd)CP RMMoff Cretvin Y 7Ess= UAllL 7 89 80 UG lEvnars-of 4-manrE9"svr es' eccartnMcE. Rxr2us2 ANT =,sysvused AAtr AWAn. ~ F.

l 7 8 SfugyssarANed ygyTar An yg' B E"M P&aE 3ATtromeT*EI4 f Cdt4t*LET8ED * (fl. 312/74= 3) 80

  • ^"

'aM" M

,J~u",'.Cm'"'a O

12171 L8_I 121212121x121 Lg.J isl a.l a la i Ly_]

Co m ~ENT Coat mA1CN 7 89 10 11 12 17 43 44 47 48 CAUSE DESCalPTION ITHE i

JNap e Yos se nt D r esre M:ss mL E ret Tstown= =rPMT* 1*

FAf L &D

  • rv RWCdet N! E E"'

T1.I E" 7 89 80 l TMeA/MotAL 5BWt*1 Fica *r~ldW 2E dd1Rr'MGMTT Er int 2t u r1p uk usar s kPd)t MGD of l

7 89 80 I No1 MG52>0Nffm /LI*1'Y Tdf TN&~' $9tv17'1_A M &"

re>rJ fotPLE~rt G"N 74-17sM,

I

'E oEvEnY s

s PowEn oTwEn status osCOVERY DESCRPTON Le.z]

loielol I wa l

La.]

I "4

1 1

7 8 9

10 12 13 44 45 48 80 AELEAS D OF SE AMOUNT OF ACTMTV LOCATCN OF RELEASE l.z]

121 1

N4 l

l N4 1

1 7 8 9

10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTON -

M 10101o1 L2d I

un i

7 89 11 12 13 80 PERSONNEL INJURIES NUM8ER DESCRIPTON M lololol I

N4 l

7 89 11 12 80 OFFSITE CONSEQUENCES 3E I N4 1

7 89 80 LOSS OR OAMAGE TO FACILITY TYPE DESCFIIPTON N4 l

7 89 10 80 PUBUCITY 1

I N4 1

7 89 80 ADOIT10NAL FACTORS

,al Mn l

7 89 80 I

I 1

7 89 80 NAME:-

A V 'B A-

. A R3>!?

PHONE:l50!$ 37l'444S GPO 889.e37