ML19326B851

From kanterella
Jump to navigation Jump to search
Forwards Proposed Tech Specs Re Spray Chemical Additive Tanks,Emergency Cooling Pond & Tendon Surveillance
ML19326B851
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 10/07/1975
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To: Ziemann D
Office of Nuclear Reactor Regulation
Shared Package
ML19326B852 List:
References
NUDOCS 8004180589
Download: ML19326B851 (3)


Text

. ~

NA '.DISTFtidUTION FOR PART 50 DOCKET MAe cRI AL (TEMPORARY FORM)

CONTROL NO: 10R02 FILE:

FROM: Arkansas Power & LightCo . DATE OF DOC DATE REC'D LTR TWX RPT OTHER Little Rock, Arkansas J.D. Phillips 10-7-75 10-10-75 XXX TO: ORIG CC OTHER SENTNRC PDR XXX CLASS D.L. Ziemann UNCLASS PROPINFO h{ INPUT 4O NO CYS 9EC'D SENT LOCAL PDR DOCKET NO:

XXX XXX 40 50-313 DESCRIPTION: ENCLOSURES:

Letter trans the following. . . . Proposed Tech. Spec. Change Concerning Spray Chemical additive tanks , Emergency Cooling Pond, and tendon surveillance.....

(40 Copies Enclosure Received)

PLANT NAME: Arkansas # 1 FOR ACTION /INFORMATION SAB 10-14-75 DUTLER (Li SCHWENCER (L) /ZIEMANN (L)

W/ Copies W/ Copies W//, Copies W/ Copies CLARK (L)

W/ Copies STOLZ (L)

W/ Copies DICKER (E)

W/ Copies REGAN (E) !TACKNOW LEAR (L)

W/ Copies PARR (L) VASSALLO (L) KNIGHTON (E) SPIES W/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L) PURPLE (L) YOUNGBLOOD (E) LPM DO NOT REMOVE W/ Copies W/ Ccpies W/ Copies W/ Gopies INTERNAL DISTRIBUTION dITEG FILD TECH REVIEW DENTON LIC ASST A/T IND .

'/NRC PDR SCHROEDER GRIMES / .RDIGGS (L)(SrA) BRAITMAN

/OGC, ROOM P-506A MACCARY GAMMILL H. GEARIN (L) SALTZMAN sGOSSICK/ STAFF KNIGHT KASTNER E. GOULBOURNE (L) MELTZ jCASE PAWLICKl BALLARD P. KREUTZER (E)-

GIAMBUSSO SHAO SPANGLER J. LEE (L) PLANS fBOYD /STELLO M. RUJHBROOK(L) MCDONALD .

MOORE (L) HOUSTON ENVIRO S. REED (E) CHAPMAN DEYOUNG (L) /NOVAKM) MULLER M. SERVICE (L) DUBE (Ltr)' ,

SKOVHOLT (L) /ROSS DICKER S. SHEPPARD (L) /E. COUPE GOLLER (L) (Ltr) IPPOLITO KNIGHTON M. SLATER (E) PETERSON P. COLLINS fTEDESCO YOUNGBLOOD H. SMITH (L) HARTFIELD (2)

DENISE J. COLLINS REGAN S. TEETS (L) KLECKER

_R E G O P R f LAIN AS PRC' JECT LDR G. WILLI AMS (E) EISENHUT

/flLE & REGION (2) BENAROYA AdlIli Ama V. WILSON (L) WIGGINTON MIPC VOLLMER HAR LESS R, INGRAM (L) h f ilveAs M. DUNCAN m _ i/ VAR GA _ /

/1 - LOCAL PDR Russellville, Arkansas EXTERNAL DISTRIBUTION k (

/ -TIC 1 (ABERNATHY) (1)(2)(10)- NATIONAL LABS 1 - PD R-SAN /LA/NY

/ 1- NSIC (BUCHANAN) 1 - W. PENNINGTON, Rm E-201 GT 1 - BROOKHAVEN NAT LAB 1 - ASLB 1 - CONSU LTANTS 1 - G. ULRIKSON ORNL 1 - Newton Anderson NEWMARK/BLUME/AGBABIAN

/16- ACRS)tXC0(XNM/SENT..R. Diggs B 00418 0M' p

g ,t 4 m '

H ELPING O LJ i L O ARKA w '

ARK ANS AS POWER & LIGHT COMPANY DTH & LOUISlAN A STAEETS . LITTLE AOCK. aAK ANSAS 72203.(501)372-4311 October 7,1975 ^

u.s

/

, ,.v l(=

fh (c Q l- f .,.

v 4 2 -

m ,-

Q y

l Q g; (s l v.

4/ O '"n Q 1 a

Director Of Nuclear Reactor Regu ion $

ATTN: D. L. Ziemann, Chief 4 Q \h;r,. / ,_

1 Operating Reactor Branch %^. Q

.O j U. S. Nuclear Regulatory C'ommissi a.

    • " ,' f N/ f; t Washington, D. C. 20555 C9 Subj ect: Arkansas ight Company Arkansas Nuclear One-Unit 1 Docket No. 50-313 License No. DPR-51 Proposed Technical Specifications

Dear Mr. Ziemann:

Attached find several proposed technical specifications concerning spray chemical additive tanks, emergency cooling pond, and tendon surveillance.

The basis for' change for each is as follows:

Pages 36, 37, 39 - The changes to Specifications 3.3.1 and 3.3.4 establishes level and 'concentiation bands for spray chemical addi-tive tanks based on as' built data. The establishment of error bands on the required parameters provides more flexibility in surveillance requirements and limiting conditions for operation, yet results in no reduction in the margin of safety to the public. No effect on plant operation will result.

Pages 66a,110a - Annual sounding of the emergency cooling pond showed that the pond depth was not the required 3.0 ft. with the surface elevation at 344 ft. O inches. Therefore, per Specification 4.13.2, a change to Specifications 3.11.1 and 4.13.1 is necessitated, llowever, to avoid future changes to the Technical Specifications in the event that the pond bottom elevation again changes, the specifi-cations have been revised to eliminate elevations and show minimum water depths in their stead. The re isien to Specification 3.11.1 also allows time to bring the pond level to a depth of > 3 ft. during power operation which will add flexibility to plant operation.

  • 9 T AX A AYING. INVESTOR OWNEO MEMBE A MIDOLE SOUTH UTILmES SYSTEM

(  !.fr. D. L. Zicmann -9ctobsr 7,1975

~

Page 8C - With the issue of Regulatory Guide 1.85, Rev.1, " Inservice Inspection of Ungrouted Tendons in Prestressed Concrete Containment Structures" (July 1974), it has been determined that the frequency of tendon surveillance does not warrant the requirement to perfom tendon surveillance the second year after the initial containment structural integrity test. Deletion of the second year tendon surveillance will not jeopardize the structural integrity of the containment due to tendon surveillances which will take place 1 and 3 years after the structural integrity test. These surveillances will serve to determine the performance of the system during its initial years. No impact on plant operation will.-result.

Youi prompt review, coments and/or approval is requested.

Very truly yours, 1

( J. D. Phillips

.d Senior Vice President I JDP:tw 4

Attachment 4

+= . _ _ >