ML19326B836
| ML19326B836 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/17/1975 |
| From: | Phillips J ARKANSAS POWER & LIGHT CO. |
| To: | Anthony Giambusso Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19326B838 | List: |
| References | |
| 4287, NUDOCS 8004180579 | |
| Download: ML19326B836 (3) | |
Text
NRC DISTRICUTION FOR PART 50 DOC %ET MATERIAL 7
(TEMPORARY FORM)
"d
.~
' CONTROL NO:
4287 FILE:
FROM: Arkansas Power & Light DATE OF DOC CATE REC'D, LTR TWX RPT OTHER Co.
Little Rock, Ark.. 72203
, J. D. Phillips 4-17-75 4-19-75 n
TO:
~$.A.Giambusso 1 signed 39 SENT LOCAL POR U
CLASS UNCLASS PROP. INFO INPUT NO CYS REC'D DOCKET NO:
nx ho 50-313
. DESCRIPTION: Ltr furnishing addl info re stear ENCLOSURES:
Proposes 1 Tech Specs changes lina b mak instruementation & contro'h system & ti ans governing the operation & surveillance 'of the following:
'the SLEIC System.....
~
(40 cys. enc 1 ree'd) {
'y.i:T*]OVQ P!.'uT NAME: Arkansas Unit 1-FOR ACTION /INFORTAATION DHL 4-22-75 DUTLER (L)
SCHWENCER (L) *flE" ^ NN (L)
REG AN (E)
W/ Copics W/ Copics W,kopics W/ Copies CLARK (L)
STOLZ (L)
DICKER (E)
LEAR (L)
W/ Copics W/ Copics W/ Copics W/ Copies PARH (L)
VASSALLO (L)
KNIGHYON (E)
SPELS W/ Cup.e5 Wi Copies W/ Cop:es W/ Copics KNIEL (L)
PURPLE (L)
YOUNG BLOOD (E)
W/ Copics W/ Copies W/ Copics W/ Copies INTERNAL DISTRICUTION ETFG FIl F 3 TECH REV!EW DENTON LIC ASST A/T IND.
- ;4HU rud SChROEDER GRIMES R. DIGGS (L)
BRAI N AN 8 2GC. ROOM P-50GA MACCARY GAMMILL H. GE APIN (L)
SALTZMAN 60SSICK/STAF F KNIGHT KASTNER E. GOULBOURNE (L)
M E LTZ.
CA$E PAWLICKl BALLARD P. KREUTZER (E)
GIAMBUSSO SilAO SPANGLER J. LEE (L)
PLANS BOYD STELLO M. MAIGRET (L)
- MCDONALD MOORE (L)
HOUSTON ENVIRO S. REED (E)
QHAPMAN DEYOUNG (L)
NOVAK
'MU L LE R M. SERVICE (L)
LOUSE (Ltr)
SKOVHOLT (L)
ROSS DICKER S. SHEPPARD (L) 6G. COUPE GOLLER (L) (Ltr)
IPPOLITO KNIGHTON M. SLATER (E)
PETERSON P. CO L LINS TEDESCO YOUNGBLOOD H. SMITH (L)
HARTFIELD (2)
DENISE LONG JEGAN S. TEETS (L)
KLECKER REG OP3 LAINAS
- PROJECT LDR G, WILLI AMS (E)
EISENHUT
[iLE & EEGION (2)
BENAROYA M '$
V
' '.WlGGIN TON Y. WILSON (L)
T.R. WILSON VOLLMER HAR LESS INGRAM (L)
STEELE
,A e
EXTERNAL DISTRiSUTION Zb MID bF 64 - LOCAL PDR. Russellville, A.-k.
4(f - NSIC (i3UCHANAN)
-T!C (ABERNATHY)
(1)(2)(10) - NATION SL LASS 1 - PDR SANILA/NY W
1 - W. PEND.I.'.GTON, Rm E 201 GT 1 - BROOKHAVEN N AT LAB 1 - ASLB 1 - CONSULTANTS 1 - G. U LR IKSON, 0.ll:L
- Newton Anderson NCWMARK/BLUME/AG BASI AN 1 - AGMED (RUTH GUSST.iAT :
% ACRS1.A erm wSENT Lg / fpg g N Rm B.127 GT 1 - J. D. RUNKLE'S. Rm E 201 O
LM 8 004180I7 9 - P
O n
I i
H EL PIN G BUILO ARKAN8AS L
ARK ANS AS POWER & LIGHT COMPANY 97H & LOutSIANA STAEETS. LITTLE ACCK. ARK ANSAS 72203.(5013372-4311 April 17, 1975
,,v
\\.
s Mr. A. Giambusso, Director
~}
Division of Reactor Licensing U. S. Nuclear Regulatory Commission Q
d '~* d '
! 3 '
Washington, D..C.
20555
Subject:
Arkansas Power G Light Company
.[-
Arkansas Nuclear One-Unit 1
' wd 'V
<s Docket No. 50-313 License No. DPR-51 Steam Line Break Instrumentation and Control System (SLBIC)
Dear Mr. Giambusso:
Mr. K. R. Go11er's letter of February 12, 1975, approved the design of the Steam Line Break Instrumentation and Control System (SLBIC) and requested that we inform you of our schedule for completion of this system and that we submit proposed Technical Specifications.
We have attached for your review our proposed Technical Specification changes governing the operation and surveillance of the SLBIC System.
Specifications 3.4 and 3.5.1 cover its operability while Specification 4.1 covers the necessary surveillance.
i The SLBIC System is being installed during the current shutdown of the i
unit and soon will undergo preoperational testing.
We have previously shown by analysis that this system is not needed until after 225 effec-tive full power days (EFPD) of operation on the first core.
We have, to date, used approximately 93 EFPD of our first core and estimate that October 1, 1975, would be the earliest date that we would reach 225 EFPD.
To allow some time for checkout and experience with this system we pro-1 pose to implement the Technical Specifications and have the SLBIC System operational by October 1, 1975.
Your approval and/or comments on our proposed actions and Technical Specifications are requested.
Very truly yours,.
h 9 A '.i
+,
?
7 n
-. v
.- L(
/
j,a
.i I
- J.
D. Phillips Senior Vice President JDP:lt Attachment j
T AX P AYING. INVESTOR OWNEn MEMBER MlOOLE SOUTH UTILITIES SYSTEM
m o
STATE OF ARKANSAS
)
)
SS COUNTY OF PULASKI
)
J. D. Phillips, being duly sworn, states that he is a Senior Vice President of Arkansas Power 4 Light Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this Supplerentary Information; that he has read all of the statements made and matters set forth therein are true and correct to the best of his knowledge, information and belief.
a.
n,. /*.9/ //.
- L bi i n s ;,"
./'
J. D. P'hillip's SUBSCRIBED AND SWORN W before me, a Notary Public in and for the County and State above named this /7b day of
, 197S.
A
.M cre Notary Public My Commission Expires:
March 1, 1978 l.