ML19326B748

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Reactor Bldg Spray Sys Piping Crack.Responds to Request During 730612-15 Insp for Assurance That Other Piping Not Subj to Heat & Hammer Pounding.Pipe Spool Only Location So Subjected
ML19326B748
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/16/1973
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19326B743 List:
References
NUDOCS 8004170576
Download: ML19326B748 (1)


Text

a O

H EL PIN G BLJtLO ARKANSAS ARKANS AS POWER & LIGHT COMPANY STM AVENUE ANo AINE STAEET

  • PtNE GLUFF. AAKANSAS 71631 e (5013 5341330 July 16,1973 Mr. D. F. Knuth Director of Regulatory Operations United States Atomic Energy Comission Washington, D. C. 20545

SUBJECT:

ARKANSAS POWER & LIGHT COMPANY ARKANSAS NUCLEAR ONE - UNIT 1 DOCKET NO. 50-313 REACTOR BUILDING SPRAY SYSTEM PIPING CRACK

Dear Mr. Knuth:

This letter is written to supply further information to our letter of May 25,1973, which reported the results of our investigation of an CN incident which occurred during hydro-testing of the reactor building

(

)

spray system on March 27, 1973, and was subsequently identified to Regu-

' ' ^ ' '

latory Operations, Region II, as required by 10 CFR 50.55(e).

During a routine inspection by M. S. Kidd on June 12-15, 1973, we we were asked to provide assurance that other piping received from Kellogg has not been subjected to heat and pounding with a ball peen hammer. Our Architect-Engineer has provided us with documentation from the piping vendor, which indicates that this process for repair of the piping was performed without the vendor's consent and that the pipe spool in question was the only location which was subjected to this procedure.

Very truly yours,

,/. '

/ *

'J. D. PHILLIPS Senior Vice-President JDP: NAM:mb 1

/-

.'][}

cc:

N. C. Moseley, Director l

Directorate of Regulatory Operations Region II

[i g

Atomic Energy Commission 230 Peachtree Street, N.W. Suite 818 l

O Atlanta, Georgia 30303 (v.!

80041'r y g

(,

.... -,00<

ecurN ur,ur,ee e.

1Ax...,~o.,~ve.ro o.~eo

,1 JUN 19 t

Arkanc4s Power and Light Company Docket No. 50-313 ATTN: Mr. J. D. Phillips Vice President and Chief Engineer Sixth and Pine Streets Pine Bluff, Arkansas 71601 Gentlemen:

23, 1973 [ h t

'.1 hank you for your letters dated May an 1973, which forwarded reports pursuant"to 10 CFR 50.55(e).

ou po ts will be reviewed and evaluated and, should we require additional information, we will contact you.

Your cooperation concerning these matters is appreciated.

Sincerely, t

D. F. Knuth, Deputy Director for Field Operations Directorate of Regulatory Operations DUPLICATE DOCUMENT Entire document previously entered into system under:

h h

[k f)b ANO No. of pages:

Og of Eva.Ylid(K7 c_ m.,.....m. _.m

-..