ML19326B576

From kanterella
Jump to navigation Jump to search
Forwards LERs 78-005/03L-0,78-006/03L-0 & 78-007/03L-0
Date released: 12/06/2019 Download: ML19326B576


LER 78-007/03L-0:on 780308,ventilation Dampers Failed to Seal Properly After Actuation.Caused by Sticky Air Supply Sys.Bladder Pressure Gauges Replaced & Air Supply re-adjusted
ML19326B579
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/24/1978
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19326B579 (1)
LER 78-006/03L-0:on 780305,studs on Lower Steam Generator Primary Manway Cover Sheared Off.Caused by Crack of 90% of Stud Diameter.Studs Ultrasonically Checked for Cracks & One Removed
ML19326B578
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/24/1978
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19326B578 (1)
LER 78-005/03L-0:on 780302,steam Generator Tube Indications Exceeded Plugging Limit on 40% of Nominal Wall Thickness. Caused by Defect Near Upper Tube Sheet.Tubes Plugged
ML19326B577
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/24/1978
From: Smively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19326B577 (1)
Forwards LERs 78-005/03L-0,78-006/03L-0 & 78-007/03L-0
ML19326B575
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/24/1978
From: David Williams
ARKANSAS POWER & LIGHT CO.
To: HOWARD E M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19326B575 (1)