ML19326B003

From kanterella
Jump to navigation Jump to search
Forwards Amend 9 to OL Application,Reflecting Pipe Protection Criteria Change.W/O Encl
ML19326B003
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/13/1970
From: Sampson G
TOLEDO EDISON CO.
To: Price H
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19326B004 List:
References
NUDOCS 8003050937
Download: ML19326B003 (1)


Text

.e

~

rg 'z R P:/

THE TOLEDO 1 J0 @ @ M cour^xv

-F

. ~g-mw -

42o urossoxavro:n.wais.no,onio 4aoon 44:u> 242-arsi August 13, 1970 GLJENN J. SAMPSON vic= r==.mme-row =

7,N,.

~.

'4*umasse l'

/~LC

~.

Mr. Harold L. Price Director of Regulation U. S. Atc=ic Energy Co=sission Washington, D. C. 205h5 Decket Ilo. 50-3h6 ET'

Dear Mr. Price:

The Toledo Edison Cc=pany has today filed Amend ent :fo. 9 to the application to construct and operate the Davis-Eesse :Tuclear Power Station. This amend =ent covers a change in pipe protection criteria.

Three signed criginals and 32 confor ed copies of the a endment page together with 80 ccpies of the PSAR changes are being trans=icted to AEC under separate cover.

Yours very truly,

/

1 9

Y r

\\

Y, %m Lll< c

~

\\

/

j.590 8003050737

,y,4