ML19326A410

From kanterella
Jump to navigation Jump to search
Recommends Application for OL Be Accepted for Docketing, Based on Second Preliminary Review
ML19326A410
Person / Time
Site: Davis Besse 
Issue date: 03/09/1973
From: Faulkner H
US ATOMIC ENERGY COMMISSION (AEC)
To: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8002030213
Download: ML19326A410 (2)


Text

,

- - ~

[, 6--6Ki/>

L 3 ue

[

s. -cx i

l I

Docket Ko. 50-346 M9 1973

}

{

6,

{

R. C. DeYoung, Assistant Director for Pressurized Water Reactors, L Thru:

A. Schwencer, Chief, Pressurized Water Reactors Branch %. 4, L RECOMMENDATION O'i Th'E SECOND PRELIMINART REVIEW OF TFE DAVIS-BFSSF FUCLFAR POWER STATION UMIT 1, TCLEDO EDISOU COMPAUT ST'MMART The second preliminary review of the operating license application for the Davis-Besse 'Tuclear Power Station has been completed.

It is recom-

r. ended that the Davis-Desse application be accepted for docketine.

FACKGRCUND On December 12, 1972, Toledo Fdison Company tendered the Davis-Pesse Nuclear Power Station operating license application for a preliminary i

review. On January 18, 1973, we transeitted to Toledo Edison Company the results of our preliminary review, namely, that the application was not sufficiently complete for us to initiate our detailed review. This conclusion was based on deficiencies in the Final Safety Analysis Pecort.

e A list of FSAR deficiencies and coments accompanied cur letter; the letter stated that further infor:-atien with respect to the major deficiencies would be required prior to application acceptance.

DISCUSSION AND COMCLUSION On February 23, 1973 Toledo Edison Company forwarded their responses to the major FSAR deficiencies. These responses addressed the areas of radiological dose mitigation and hydrologic engineering which constituted the principal inadequacies in the original FSAR. In accordance with "A Cuide for the Preliminary Review of Facility License Applications" the l

responses were reviewed by the project manager. 2ased on the satisfactory 1

1 8002030943 i

- - ~.

'~

'~

MAR 9 1973 I

I l

}

review of this information it is recorsnended that the Davis-Besse applica-tion for an operating license be accepted and docketed. A letter, which g

has been prepared for concurrence and signature-informing the applicant j

of our decision, accompanies this recorsoendation.

Original 313ned by Howard J. Faulkner H. J. Faulkner, Project Manager Directorate of Licensing cc:

I. Peltier Chief, Central Files Pk'R Branch Chiefs E. Goulbourne

+

1 i

t h

t I

i i

I 6

CRESS #3 L:E,,-

L:PWR 4

- Rdu(.%Tder/jbAdch. _ -

+

omer>

0 MC 381956 v

encer

.g _ e i.

sunnaar >

-t' 3/8.

3/ /73

....L./73......

.. (C l

o4Tr >

Form AEC.Sle tRev.9-5h AECM 0240

  • u s sevt.wea.e mTu ora:cs t s7 t.44e -t 54