Forwards Summary of 730206 Meeting in Bethesda,Md W/Util Re Preliminary Review of Application for Ol,Specifically PMF Bases,Potential Effects of Cooling Towers,Application Processing & Availability of Meeting Minutes
ML19326A408
Person / Time
Site: Davis Besse 
Issue date: 03/01/1973
From: Faulkner H
US ATOMIC ENERGY COMMISSION (AEC)
To: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8002030211
Download: ML19326A408 (3)


Text

r"

' ~~ ~

~

f l

~.

DISTRIBUTION:

D6cket File i

RP Rdg i

PWR-4 8

mi G73 HFaulkner

(

ECoulbourne f

R. C. DeYoung, Assistant Director for Pressurized Water Raaetors, L Thru:

A. Sclarencer, Chief, Pressurized Water Reactors 3 ranch f4, L l

i' MEETINC VITH TOLEDO ITISON COMPANY CONCCINING PRELIMINART REVIIV 0F THE f

OPERATING LICENSE APPLICATION FOR DAVIS BESSE CTIT 1, DOC 1CT No. 50-346 j

Enclosed is the sununary of *.he meeting held at Bethesda, Maryland on February 6, 1973 with Toledo Edison Company. An attendance list is also t

enclosed.

' b ~;

,a :

..ner

3. J. Faulkner, Project Manager Pressurized Water Reactors 3 ranch 14 Directorate of Licensing

Enclosures:

1. Meeting sumanary of 2/6/73
2. Attendance List j

cc: AEC PDR i'

R. S. Boyd Local PDR D. Skovholt j

D. Knuth R. Maccary l,

R. Tedesco l

E. Denton

[

PWR Branch daiefs R. W. Klecker l

M. Rosen RO (3)

Each g AEC participent f

i

_L PWR_4 r L:PWR-4

/l o-C CRESS #@Fa>

9-l t

MC# 21 1 H

ner:jk_ ASchwe cer l

' l1'I 5213......

2G.' '13-am >.

Form AEC-Ste gAev.9 33) AECM 0240 a u s covtoweer **wr*.o onca 107 s -44e -t sa80020 M,

.~.

F ENCLOSURE 1

)

r i

TOLEDO EDISOK COMPANT - DAVIS BESSE UNIT 1 1W TRT MD. 50-346 StaefARY OF MEETING-FFERHARY 6,1973 A - *ing was held with Toledo Edison Company im Bethesda, Maryland on February 6, 1973 to dime=== the pr.14=f==ey review results for the operettag license application of Devia Besee Unit 1.

With respect to t.

t the probable maxim m flood (7MF), the applicant was informed to provide hydrologic parameters and to more fully describe the discharge of the Ta=== mint River ir.to Lake Erie. h applicant anticipates submitting j

material during the week of February 19 covering the deficiencies l

identified during the pr=14=4==ey review.

i DISCUSSION The meeting was requested by Toledo Edison Company to 1) clarify two of our FSAE deficiency ca-anta arising from the prelf=fnary review of f

the OL application and 2) clarify procedural matters with respect to resubmitting information and subsequent docketing of the application.

h specific items discussed are listed below:

t' 1.

Probable Mart== ylood Bases. We had e - ted that additional bases were needed for concluding a FMF on the Toussaint River does not constitute a flood threat to the plant. This could be accomplished by j

providing additional hydrologic parameters including the probable l

[

=ar4=== precipitation and run-off models. Additionally, a description in more detail of the discharge of the mouth of the TM--4=t River l'

into Lake Eria should be provided.

t t

[

2.

Potential Effects of Cooling Towers. N applicant informed us that copies of a study of the pota=*imi effects of cooling towers on the envirousnemt were 4= eluded in their Environmental Emport. Ny asked if addiciama1 copies womid be required with the FSAR. We i

agreed to review this with the site Safety Branch and inform Toledo

[

rdia=a Company of ear decision by telephone.

)

(

Q F FI C E

  • f......_...

.l

......1

..,f.

I 3

7 l

l SumNAME.

..f D 4 7E

  • F.em AEC-318 (R.v. 9-5 3) AECM 0240

e, l

1-3.

Application Processina. Toledo Edison Company plans to enhait replies to our FSAR deficiency list during the week of February 19. In connection with this, they raised some questions concerning the procedural aspects of submitting this information such as the need for a formal Wt, the need for additional Oaths of Affirmation and the format of their responses. At tim suggestion of OGC we agreed to review these questions in light of current regulations and inform the applicant of our requirements by telephone.

4.

Meetina Minutes. The applicant was informed that all AEC meeting mientes are now forwarded to the public document room and are available to the general public. It was stated that the responsi-bility for identifying proprietary information presented during the course of any meeting resides with Toledo Edison Campany.

D**3D *]D T

_o e M e M.11 n

l l

l l

l 1

i 1

OF FICE *..

SU 8tN AME *.

CATE *...

Form AEC-318 tR.v. 9.4D AECM 0240

--..e s

EBCLOSURE 2 ATTEm&NCE LIST I

ABC R..T. Fmalknee, L W. Bivens, L L. Feuel OCC l

Y. Davis, OGC C. Young, Basetor Operaciana TOLEDO ZDISON COMPANY E. Novak

'j L. Ice i

i.

BABCOCK AND VILCOX R. Tankan

1. Steinka l

3ECHTEL P

2. Seoni W. Mable

\\

I J

J

.y i

I i

L.

,l t

F e

i L

5 l

t i,,,,,,,,,_,,,,,,

, j,,

___ i,

OFFICE

[.

6 1

SURNAME

,f Fone AEC 318 Rev 9-53) AECM 0240

.