Forwards Summary of 730517 Meeting W/Util,B&W & Bechtel Re Davis-Besse Project
ML19326A407
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/22/1973
From: Peltier I
US ATOMIC ENERGY COMMISSION (AEC)
To: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8002030210
Download: ML19326A407 (3)


Text

r UNITED STATES

  • N '*

k ATOMIC ENERGY COMMISSION

\\

WASHINGTON, D.C. 2054S MM 2 2 1973 Docket No. 50-344 R. C. DeYoung, Assistant Director for Pressurized Water Reactors, L THRU:

A. Schwenecr, Chief, Pressurized Water Reactors Br. No. 4, L MEETING WITH TOLEDO EDISON, BECHTEL AND B&W - DAVIS-BESSE PROJECT MEETING - MAY 17, 1973 Enclosed is a summary of the meeting held with Toledo Edison, Bechtel and B&W on the Davis-Besse project. Also enclosed is the attendance list.

Irving A. Peltier, Project Manager Pressurized Water Reactors Br. No. 4 Directorate of Licensing

Enclosures:

1.

Meeting Sumary 2.

Attendance List cc w/ encia:

AEC PDR Local PDR PWR Branch Chiefs RWKlecker MRosen R0 (3)

TR Assistant Directors TR Branch Chiefs EIGoulbourne JHendrie RP Assistant Directors RP Branch Chiefs MMalsch, OGC HThompson SBlock i

LEngle l

3002030 W

O ENCLOSURE I MEETING WITH TOLEDO EDISON, BECHTEL AND B&W - DAVIS-BESSE PROJECT MAY 17, 1973 Summary

1) The LPM familiarized TE with the AEC organization that would be participating in the complete review of the Davis-Besse OL application and described the review process in light of existing schedule milestones which TE had been mailed.
2) The LPM highlighted the outstanding issues which have resulted from generic concerns outside of the standard review proce.as on Davis-Besse. Such issues have been the subject of correspondence to the applicant during the post-CP stage. They are:

a) Review of Control Circuits b) Fue1, Densification

) High-Energy Line Rupture di Failure of Non-Catagory I Equipment

3) The EPM highlighted the outstanding steps remaining in the environmental review process.
4) The applicant reported that construction-wise the plant was 50%

complete and that fuel loading is still scheduled for December 1974.

5) The applicant is concerned about our ultimate position with regard to low pressure injection system cross connects external to the containment by manual means as a protective measure in the event of a floodline break.
6) The applicant would also like to know if the vessel internals prototype status of Oconee 1 is applicable to Davis-Besse,

e s

ENCLOSURE 2 DAVIS-BESSE PROJECT MEETLNG ATTENDANCE LIST MAY 17, 1973 Atomic Energy Commission IAPeltier EIGoulbourne HLThompson, Jr.

SBlock LEngle

  • ASchwencer Bechtel Company WHMable JSeoni Toledo Edison Company ENovak TRoe Babcock & Wilcox RRSteinke GMolds JDAgar
  • Part-time attendance I

4 W 2 2 7973 Docket No. 50-346

-d

, c.#cA.d op *'.. sci DeToung, Assistant Director for Pressurized Water Reactors, L p

.;y THID:

A. Schwencer, Chief. Pressurized Water Rasetors Br. No. 4. L 1

i

!!EE**IIiG WITH TM.EDO ZDISON, BECHTEL AND 3&W - DAVIS-BESSE PROJECT MEITING - MAY 17, 1973 Enclosed is a summary of the meeting held with Toledo Edison, Bechtel and Z~~i on the Davic-?csse proj ect. Also enclosed is the attendance Ohy *

$lSQ fy List.

Irving A. Peltier, Project Manager Pressurized Vater Reactors Br. No. 4 Directorata of Licensing

Enclosures:

DISTRIBUTION 1.

Hecting Su.r.ary (Docket 2.

Attendance List KP Rdg PWR-4 Rdg cc w/ encls:

IAPeltier AEC FDR Local PDR FWR Branch Chiefs RWKlacker MEcsen E0 (3)

TX Ameistant Directors T1 Branch Chiefs IICoulbourne JHendrie IP Assistant Directors RP 3 ranch Chiefs

)ttelsch, OGC HThompson 531ock LEngle 4

vY oma,

__,L,:C/PWR-4 PWR-4 Vs I,

..IAPelt idr. k:n f,,,,,,, wencer summaut >

..,h,!,h. - /73 DATE >

Fors AEC-518 I Aav. 3-53) AECM 0240 are s--se-sius-a uMs

\\ >

o i

v,