4 JUL 3 1973 E.
C.
DaToung, Assistant Director for PW1's, L EEQUEST FOR ADDITIONAL INFORMATION PLANT MAME:
Davis-Besse LICENSING STAGE:
OL DOCKET NUMBER:
50-346 IdSPONSIBLE BRANCH:
PWR #4 1EQUESTED COMPLETION DATE:
7/6/73 APPLICAMTS RESPONSE DATE MECESSART FOR NEXT ACTION PLANNED ON PROJECT:
As scheduled DESCRIPTIOM OF RESPOSSE:
Amendment to FSAR REVIEW STATUS:
Site Analysis Branch (Meteorology)
Awaiting Information Enclosed are questions on meteorology for the s ubj ect site.
Please include these in the next question list transmitted to the applicant.
These questions were prepared by J.
E.
Fairobent and E.
H.
Markee of the Site Analysis 3 ranch, L.
Originni mi.;mi by H. It Dentaa Harold 1.
Denton, Assistant Director for Site Safety j
Directorate of Licensing j
l
Enclosure:
As stated L: Docket File 346 L'. '
DISTRIBUTION:
cc:
w/o enclosure A. Giambasso L Rdg W. Mcdonald g
L:AD/SS cc:
w/ enclosure S.E. Ramauer J. M. Hendria W. F.
Cammill A. Schwescer g "h 'N Gd
'l O
k I. A. Peltier E. Markee f,.:
L:ADq55 L:SAB L:SAB L: AB g
g.g.......j p..
- r=
- sunnAuc >
, J F a.i r o b e,n.t..:. bas EMar, hee
.Pfammill H
en n
/7/ p /73 7 / __3 / 7 3 Daft >...
.7./.2./.7.3......... 7f.2 / 7_3 4
g00203OM@
r ac.n. <a.,* ucx om
.o -i.-.., --
,m N
)
REQUEST FOR ADDITIONAL INFORMATION TOLEDO EDISON COMPANY DAVIS-BESSE PLANT DOCKET NO. 50-346 METEOROLOGY Question 2.3.1.1 Ver..y the statement in Section 2.3.1.2.8, first paragraph, page 2-34 of the FSAR,.that high air pollution potential (atmospheric stagnation) conditions occur 20 to 307. of the time at the plant site.
Question 2.3.2.1 Provide a full year of onsite temperature and humidity data with a joint recovery rate of at least 907. as soon as such date become-available.
Question 2.3.2.2 Provide a copy of the study of the potential effects of the cooling towers on the environment that is referred to in Section 2.3.2.3 of the FSAR.
Question 2.3.3.1 Provide evidence that the accuracy of the meteorological measurement equipment to be used in the operational onsite measurement program, especially with respect to the dewpoint measurements, meem the accuracy criteria recommended in Regulatory Guide 1.23.
Question 2.3.5.1 Provide a table of annual average relative concentration (X/Q) estimates for 16 radial sectors to a distance of 50 miles from the plant.
--. -.